ACI Grade 1 Field Testing Certification Practice Test - Irving Questions and Answers 100% Solved correctly It is allowable to remove the temperature measuring devices from the freshly mixed concrete to read the temperature if you cannot see the reading. (T or F) - ANSWER -False The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. (T or F) - ANSWER -False Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. (T or F) - ANSWER -False (15 mins) The composite concrete sample must be protected from sun, wind, contamination and rapid evaporation. (T or F) - ANSWER -False (Contamination and rapid evaporation) If the concrete contains aggregates larger than those that are appropriate for a size of mold or equipment used, the sample should be wet-sieved before making the test. (T or F) - ANSWER -False (wet screened) The composite sample not be remixed before beginning any tests. (T or F) - ANSWER -False Sampling should normally be performed, as the concrete is discharged from the mixer. (T or F) - ANSWER -True ASTM Method C172 includes the sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment. (T or F) - ANSWER -True After sampling is completed, start the tests for slump and air content within: - ANSWER -None of the above (5 mins) In any case, do not obtain samples until: - ANSWER -All the water and admixtures have been added to the concrete No samples shall be taken before ______ or after ______ of the batch has been discharged. - ANSWER - When strength tests are to be made, the minimum size of the composite sample shall be: - ANSWER -1 cubic foot Sample the concrete from the chute of a truck mixer by: - ANSWER - Fresh concrete to be tested at the job site should be sampled from: - ANSWER Two or more regularly spaced intervals during discharge of the middle portion of the batch The elapsed time between obtaining the first and final portions of the composite sample, according to ASTM C172, shall not exceed: - ANSWER -None of the above The sides of the slump cone should be tapped with the mallet to consolidate the concrete in the mold. (T or F) - ANSWER -False For the slump test, when Rodding the second layer and the top layer, the tamping rod should just penetrate into the underlying layer. (T or F) - ANSWER -True According to ASTM C143, it is permissible to use a mold, which clamps to a nonabsorbent base. (T or F) - ANSWER -True When filling the final layer of the slump cone, never heap the concrete above the top of the mold. (T or F) - ANSWER -False The filling of the slump cone should be done in three layers of equal height. (T or F) - ANSWER -False ASTM C1064 states the container used to measure temperature of concrete must be large enough to provide at least 5 inches of concrete around the sensor. (T or F) - ANSWER - Calibrate the temperature measuring device at least __________, or whenever there is a question of accuracy. - ANSWER -Annually After the thermometer is placed in the concrete: - ANSWER -Gently press concrete around the thermometer According to ASTM C1064, what is one reason to take the temperature of concrete? - ANSWER -Verify conformance The slump test may be done on any flat surface. (T or F) - ANSWER -False When filling the slump cone, each layer should be rodded 25 times. (T or F) - ANSWER -True The slump cone is filled in three layers of equal volume. (T or F) - ANSWER True Concrete should be removed from around the base before the cone is lifted. (T or F) - ANSWER -True The slump cone should be raised carefully, vertically upward, in a steady motion in ________ Seconds - ANSWER -3 to 7 The elapsed time between the start of filling the slump cone and the removal of the cone must be no more than: - ANSWER -2 1/2 minutes The slump should be measured to the nearest - ANSWER -Quarter of an inch In order to determine slump, you should measure the vertical distance from: - ANSWER -Top of the mold to the displaced original center of the top surface For concrete with aggregates less than 3 inches, the thermometer must remain in the

Mostrar más Leer menos
Institución
ACI Grade 1 Field
Grado
ACI Grade 1 Field









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ACI Grade 1 Field
Grado
ACI Grade 1 Field

Información del documento

Subido en
18 de diciembre de 2024
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ACI Grade 1 Field Testing Certification Practice Test -
Irving Questions and Answers 100% Solved correctly


It is allowable to remove the temperature measuring devices from the freshly
mixed concrete to read the temperature if you cannot see the reading. (T or F) -
ANSWER -False

The maximum allowable time between obtaining the first and last portions of the
composite sample may not exceed 5 minutes. (T or F) - ANSWER -False

Start molding specimens for strength tests within 30 minutes after fabricating the
composite sample. (T or F) - ANSWER -False (15 mins)

The composite concrete sample must be protected from sun, wind, contamination
and rapid evaporation. (T or F) - ANSWER -False (Contamination and rapid
evaporation)

If the concrete contains aggregates larger than those that are appropriate for a size
of mold or equipment used, the sample should be wet-sieved before making the
test. (T or F) - ANSWER -False (wet screened)

The composite sample not be remixed before beginning any tests. (T or F) -
ANSWER -False

Sampling should normally be performed, as the concrete is discharged from the
mixer. (T or F) - ANSWER -True

ASTM Method C172 includes the sampling from stationary mixers, paving
mixers, truck mixers, agitators, and non-agitating equipment. (T or F) - ANSWER
-True

After sampling is completed, start the tests for slump and air content within: -
ANSWER -None of the above (5 mins)

, In any case, do not obtain samples until: - ANSWER -All the water and
admixtures have been added to the concrete

No samples shall be taken before ______ or after ______ of the batch has been
discharged. - ANSWER -

When strength tests are to be made, the minimum size of the composite sample
shall be: - ANSWER -1 cubic foot

Sample the concrete from the chute of a truck mixer by: - ANSWER -

Fresh concrete to be tested at the job site should be sampled from: - ANSWER
Two or more regularly spaced intervals during discharge of the middle portion of
the batch

The elapsed time between obtaining the first and final portions of the composite
sample, according to ASTM C172, shall not exceed: - ANSWER -None of the
above

The sides of the slump cone should be tapped with the mallet to consolidate the
concrete in the mold. (T or F) - ANSWER -False

For the slump test, when Rodding the second layer and the top layer, the tamping
rod should just penetrate into the underlying layer. (T or F) - ANSWER -True

According to ASTM C143, it is permissible to use a mold, which clamps to a
nonabsorbent base. (T or F) - ANSWER -True

When filling the final layer of the slump cone, never heap the concrete above the
top of the mold. (T or F) - ANSWER -False

The filling of the slump cone should be done in three layers of equal height. (T or
F) - ANSWER -False
$6.89
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
ExamMastery

Conoce al vendedor

Seller avatar
ExamMastery Academy Of Art University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
1 año
Número de seguidores
0
Documentos
56
Última venta
-
ExamSolutions

All You Need To Pass Your Exams

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes