who develops the special inspection program and outlines the duties of the special inspectors?
a.)building officials
b.)contractor
c.)registered design professional
d.) approved inspection agency
c.) registered design professional
special inspections are...
a.)in addition to jurisdictional inspections and structural observations
b.)in lieu of jurisdictional inspections and structural observations
c.) not required if there are jurisdictional inspections or structural observations
d.)in lieu of jurisdictional inspections or structural observations
a.) in addition to jurisdictional inspections and structural observations
who can waive the special inspection requirements for work of a minor nature?
a.)building official
b.)owner
c.)registered design professional
d.)contractor
a.)building official
1|Page
, all of the following should be on a daily progress report except...
a.)description of inspections and tests performed
b.)location of corresponding areas for test samples
c.)itemize changes authorized by the structural engineer
d.) number of workers for each subcontractor
d.) number of workers for each subcontractor
inspection agencies are required by the code to be employed by the...
a.) owner or contractor
b.)building official or registered design professional
c.)registered design professional or owner
d.)contractor or building official
c.) registered design professional or owner
according to the international building code, work performed on the premises of and by and approved
fabricator...
a.) requires periodic special inspection
b.)requires continuous special inspection
c.)requires structural observation
d.) requires no special inspection
d.) requires no special inspection
after notifying a contractor of discrepancies, an rfi is issued by the engineer and corrections made
according to the rfi, what further action is required?
a.)write correction notice and note corrective action taken
b.)note corrective action on the daily report
c.) structural observation is requires
d.) no further action is required
b.) note corrective action on the daily report
when discrepancies are noted on a daily report, which other following is not required for each
nonconforming item?
a.) name and title of each individual notified and method of notification
b.)description and location
c.) the special inspector's recommended corrective action
d.)referenced detail from approved plans that is in question
c.) the special inspector's recommended corrective action
2|Page
INSPECTOR EXAM 2025 WITH ACTUAL
CORRECT QUESTIONS AND VERIFIED
DETAILED ANSWERS |FREQUENTLY TESTED
QUESTIONS AND SOLUTIONS |ALREADY
GRADED A+|BRAND NEW!!|GUARANTEED
PASS|LATEST UPDATE
who develops the special inspection program and outlines the duties of the special inspectors?
a.)building officials
b.)contractor
c.)registered design professional
d.) approved inspection agency
c.) registered design professional
special inspections are...
a.)in addition to jurisdictional inspections and structural observations
b.)in lieu of jurisdictional inspections and structural observations
c.) not required if there are jurisdictional inspections or structural observations
d.)in lieu of jurisdictional inspections or structural observations
a.) in addition to jurisdictional inspections and structural observations
who can waive the special inspection requirements for work of a minor nature?
a.)building official
b.)owner
c.)registered design professional
d.)contractor
a.)building official
1|Page
, all of the following should be on a daily progress report except...
a.)description of inspections and tests performed
b.)location of corresponding areas for test samples
c.)itemize changes authorized by the structural engineer
d.) number of workers for each subcontractor
d.) number of workers for each subcontractor
inspection agencies are required by the code to be employed by the...
a.) owner or contractor
b.)building official or registered design professional
c.)registered design professional or owner
d.)contractor or building official
c.) registered design professional or owner
according to the international building code, work performed on the premises of and by and approved
fabricator...
a.) requires periodic special inspection
b.)requires continuous special inspection
c.)requires structural observation
d.) requires no special inspection
d.) requires no special inspection
after notifying a contractor of discrepancies, an rfi is issued by the engineer and corrections made
according to the rfi, what further action is required?
a.)write correction notice and note corrective action taken
b.)note corrective action on the daily report
c.) structural observation is requires
d.) no further action is required
b.) note corrective action on the daily report
when discrepancies are noted on a daily report, which other following is not required for each
nonconforming item?
a.) name and title of each individual notified and method of notification
b.)description and location
c.) the special inspector's recommended corrective action
d.)referenced detail from approved plans that is in question
c.) the special inspector's recommended corrective action