Periodic special inspection requires inspection of _____ percent of all assemblies.
Rate determined by the Registered Design Professional (RDP)
Special inspection is the inspection of materials and workmanship that ensures critical _____ design
features are incorporated into the construction of a building.
Structural , Fire , Life Safety
A statement of special inspections must include all of the following:
- type and extent of each special inspection
- systems requiring special inspection
- identification of the duration of the special inspection
- materials , components , and work required to have special inspections or tests
- type and extent of each test
Continuous special inspection must occur:
During construction of the components listed in the statement
A statement of the special inspections is required for which of the following materials?
Anchors installed in hardened concrete , engineered masonry , welding
According to the IBC , when must the statement of special inspections be submitted?
At the same time as the construction documents
A final report on special inspections is submitted to the building department _____________.
At a time agreed upon prior to the start of work
1|Page
,Who creates the statement of special inspections?
Registered Design Professional (RDP)
The statement of special inspections lists any components or systems requiring special inspection.
Which of the following situations does not require special inspection.
The contractor is concerned about a new product's installation
Each special inspection listed on the statement must identify whether it is ______ special inspection.
Periodic or continuous
For seismic resistance , which of the following is required to be identified in the statement of special
inspections?
Designated seismic systems
An example of a special case where the building official might require a special inspection includes all of
the following:
- unusual design applications of materials
- materials required to be installed with additional manufacturer's instructions containing a requirement
for special inspection
- alternative construction materials
Special inspection is inspection of construction requiring h expertise of a(n) ____ to ensure compliance
with the IBC and the approved construction documents.
Approved special inspector
_____ Special inspection is inspection where the inspector is intermittently present where the work to
be inspected has been or is being preformed
Periodic
In ____ special inspection, the special inspector is required to be present continuously when and where
the work to be inspected being preformed.
Continuous
A statement of special inspections is required for materials and construction listed in Section 1705 of the
IBC. As an exception, portions of structures designed and constructed in accordance with _____ do not
require special inspection.
Sections 2211.1.2 and 2308
Where special inspections or tests are required by section 1705, the ____ shall prepare a statement of
special inspections in accordance with Section 1704.3.1
Engineer or architect
_____ shall keep records of special inspections and tests.
2|Page
, Approved special inspection agencies
An approved agency submits reports of special inspections and tests to the ______. Reports shall
indicate that work inspected or tested was or was not completed in conformance to approved
construction documents.
Registered design professional and building official
Discrepancies shall be brought to the immediate attention of the _______ for correction.
Contractor
People with duties and responsibilities in the process of special inspection include the following, except:
Financial institution representatives
Duties of a special inspector include all of the following:
- submitting a final report
- maintaining familiarity with the approved construction documents
- preforming assigned inspections
The registered design professional's duties include all of the following:
- identify special inspection requirements
- develop the special inspection program
- prepare the statement of special inspections
- take part in the submittal of documents
- conducts and documents the preconstruction meeting
- outlines the duties of the special inspector
- makes periodic site visits as part of the program
- specifies tests and testing procedures
- reviews special inspection reports
- documents plan revisions to be submitted to the building official
- designates an "alternative RDP
- some jurisdictions the RDP will verify that special inspections were preformed in compliance with the
approved documents
Duties of the ______ include writing the statement of special inspections and documentation of plan
revisions.
Registered design professional
Duties of the _____ include providing access to the approved construction plans and maintains evidence
of an onsite quality control plan.
Contractor
Duties of the _____ include review of submittal documents and approval of the special inspector.
Building official
3|Page
WITH ACTUAL CORRECT QUESTIONS AND
VERIFIED DETAILED ANSWERS
|FREQUENTLY TESTED QUESTIONS AND
SOLUTIONS |ALREADY GRADED A+|BRAND
NEW!!|GUARANTEED PASS|LATEST UPDATE
Periodic special inspection requires inspection of _____ percent of all assemblies.
Rate determined by the Registered Design Professional (RDP)
Special inspection is the inspection of materials and workmanship that ensures critical _____ design
features are incorporated into the construction of a building.
Structural , Fire , Life Safety
A statement of special inspections must include all of the following:
- type and extent of each special inspection
- systems requiring special inspection
- identification of the duration of the special inspection
- materials , components , and work required to have special inspections or tests
- type and extent of each test
Continuous special inspection must occur:
During construction of the components listed in the statement
A statement of the special inspections is required for which of the following materials?
Anchors installed in hardened concrete , engineered masonry , welding
According to the IBC , when must the statement of special inspections be submitted?
At the same time as the construction documents
A final report on special inspections is submitted to the building department _____________.
At a time agreed upon prior to the start of work
1|Page
,Who creates the statement of special inspections?
Registered Design Professional (RDP)
The statement of special inspections lists any components or systems requiring special inspection.
Which of the following situations does not require special inspection.
The contractor is concerned about a new product's installation
Each special inspection listed on the statement must identify whether it is ______ special inspection.
Periodic or continuous
For seismic resistance , which of the following is required to be identified in the statement of special
inspections?
Designated seismic systems
An example of a special case where the building official might require a special inspection includes all of
the following:
- unusual design applications of materials
- materials required to be installed with additional manufacturer's instructions containing a requirement
for special inspection
- alternative construction materials
Special inspection is inspection of construction requiring h expertise of a(n) ____ to ensure compliance
with the IBC and the approved construction documents.
Approved special inspector
_____ Special inspection is inspection where the inspector is intermittently present where the work to
be inspected has been or is being preformed
Periodic
In ____ special inspection, the special inspector is required to be present continuously when and where
the work to be inspected being preformed.
Continuous
A statement of special inspections is required for materials and construction listed in Section 1705 of the
IBC. As an exception, portions of structures designed and constructed in accordance with _____ do not
require special inspection.
Sections 2211.1.2 and 2308
Where special inspections or tests are required by section 1705, the ____ shall prepare a statement of
special inspections in accordance with Section 1704.3.1
Engineer or architect
_____ shall keep records of special inspections and tests.
2|Page
, Approved special inspection agencies
An approved agency submits reports of special inspections and tests to the ______. Reports shall
indicate that work inspected or tested was or was not completed in conformance to approved
construction documents.
Registered design professional and building official
Discrepancies shall be brought to the immediate attention of the _______ for correction.
Contractor
People with duties and responsibilities in the process of special inspection include the following, except:
Financial institution representatives
Duties of a special inspector include all of the following:
- submitting a final report
- maintaining familiarity with the approved construction documents
- preforming assigned inspections
The registered design professional's duties include all of the following:
- identify special inspection requirements
- develop the special inspection program
- prepare the statement of special inspections
- take part in the submittal of documents
- conducts and documents the preconstruction meeting
- outlines the duties of the special inspector
- makes periodic site visits as part of the program
- specifies tests and testing procedures
- reviews special inspection reports
- documents plan revisions to be submitted to the building official
- designates an "alternative RDP
- some jurisdictions the RDP will verify that special inspections were preformed in compliance with the
approved documents
Duties of the ______ include writing the statement of special inspections and documentation of plan
revisions.
Registered design professional
Duties of the _____ include providing access to the approved construction plans and maintains evidence
of an onsite quality control plan.
Contractor
Duties of the _____ include review of submittal documents and approval of the special inspector.
Building official