VA DEQ SWM Inspector Exam Questions and Correct Answers Latest Update 2024 What element is targeted by water quality criteria? - Answers Phosphorous, it indicates pollution by bonding with other pollutants. At what % impervious cover are streams substantially affected? - Answers 25% what is the site-based load limit for water quality? - Answers 0.41 lbs/acre/yr total phosphorous Virginia Runoff Reduction Method- method of load calculations - Answers load calculations based on land cover type and soil type. what must happen to potentially harmful sheet flow runoff? - Answers Must be diverted to stormwater conveyance system. SWM ponds must be able to convey water safely up to what level storm event? - Answers must be able to safely convey up to a 100 yr storm. Define LDA - Answers Land disturbing activity; any man-made change to the land surface that potentially changes its runoff characteristics; includes clearing, grading, and excavation. What size LDA must comply with stormwater management regulation? in CPBA areas? - Answers anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more stringent locally. what are some activities exempt from SWM regulations? - Answers mining, agriculture, sewer discharges, local reclamation programs, routine maintenance of preexisting operations, public emergency activity what term basically means a plea deal for stormwater offenders? - Answers consent order, which replaces penalties with fines. how long does VSMP authority have to review SWM plan? - Answers 15 days to review and determine approval, and notify applicant. How often must a VSMP authority inspect an LDA? - Answers Periodically. all SWPPP requirements may be met by - Answers incorporating other plans into reference, or by developing missing elements. What must the DEQ issue to an operator before an LDA? - Answers a construction GP How soon after final grade of a site must vegetation be put in place? - Answers within 7 days. How long must operator keep routine inspection reports? - Answers At least 3 years after the GP expires/terminates. How long does operator have to revise SWPPP if authority deems it necessary? How long does local authority have to review any modifications to SWPPP? - Answers 7 days for operator to make changes, 60 days for authority to review changes. How long does operator have to notify DEQ of an unauthorized discharge? How long does operator have to make a written report of this? - Answers within 24 hours of discovery for notification, within 5 days for written acknowledgement. What constitutes a measurable rain event according to GP? - Answers 0.25 in. or more over 24 hours. Co-located practices - Answers During construction, a facility functions for ESC, and is later constructed into a stormwater BMP. During construction, when should inspector make sure a BMP is not installed? - Answers BMP should not be installed before contirbuting drainage area has been stabilized. Notice of Termination forms, to terminate construction permits, must be sent after how many days once conditions are met? - Answers 30 days When is ground considered stabilized? - Answers when vegetation is uniform, mature enough to survive, and will inhibit erosion. How long must VSMP authority keep construction record drawings? - Answers Until the relevant SWM facility is removed. How soon after meeting permit requirements must the VSMP authority return any bonds or securities to operator? - Answers within 60 days. VSMP authorities must ensure that SWM facilities, post-construction, are inspected at least once every ___ years, unless: - Answers at least once every 5 years unless a certified personnel provides inspection reports at least once a year. What legislation authorizes the VA SWM Program? - Answers The Virginia Stormwater Management Act What regulation administers the VA SWM Program? - Answers The Virginia Stormwater Management Program Regulation The Stormwater Management act requires the State Water Control Board to do what? - Answers permit, regulate, and control stormwater runoff How many days does DEQ have to complete review of real or potential inter-jurisdicitonal impacts upon request? - Answers 90 days Who is required to maintain a certificate of competency by the Stormwater Management Act? - Answers staff of a stormwater program, anyone contracted by a VSMP authority, and all standard and specification holders A SWM Plan must be approved by who prior to land disturbance? - Answers the VSMP Program Authority What is the TP limit for a site? - Answers 0.41 lbs/ac/yr The phosphorus load limit uses what % impervious cover? - Answers 10% Part II B and II C water quantity criteria addresses: - Answers channel protection and flood protection Of all the plans included in the SWPPP, which two must be approved? - Answers the SWM and ESC Plans Does a SWM plan address runoff during or after construction? - Answers post-construction What is the lower limit of imperviousness which could result in stream degradation? - Answers 10% If land disturbance occurs as a result of emergency work, what is the timeline for advising the VSMP authority of the disturbance? - Answers within 7 days of commencing the LDA and a permit application must be submitted within 30 days DEQ is responsible for enforcing the ______ while locality _______ are responsible for enforcing local ordinances. - Answers Construction GP, VSMP BMPs use these three mechanisms to control pollution: - Answers Infiltration, settling, and vegetative uptake How long does a locality VSMP authority have to determine the completeness of a SWM plan? - Answers 15 days Every year, the locality VSMP must submit information to DEQ. When is this due, and what info must be provided? - Answers Due by Oct. 1, and must include: new types of SWM facilities, geographic coordinates of them, acres treated, and surface waters/karst features into which they discharge. A locality VSMP must be at least as stringent as what state permit? - Answers The construction GP What is the maximum penalty that may be imposed under the stormwater management act? - Answers $32,500 How long must a VSMP authority retain a registration statement? - Answers At least three years after project completion or state permit termination.

Mostrar más Leer menos
Institución
VA DEQ SWM Inspector
Grado
VA DEQ SWM Inspector









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
VA DEQ SWM Inspector
Grado
VA DEQ SWM Inspector

Información del documento

Subido en
11 de diciembre de 2024
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

VA DEQ SWM Inspector Exam Questions and Correct Answers Latest Update 2024



What element is targeted by water quality criteria? - Answers Phosphorous, it indicates pollution by
bonding with other pollutants.

At what % impervious cover are streams substantially affected? - Answers 25%

what is the site-based load limit for water quality? - Answers 0.41 lbs/acre/yr total phosphorous

Virginia Runoff Reduction Method- method of load calculations - Answers load calculations based on
land cover type and soil type.

what must happen to potentially harmful sheet flow runoff? - Answers Must be diverted to stormwater
conveyance system.

SWM ponds must be able to convey water safely up to what level storm event? - Answers must be able
to safely convey up to a 100 yr storm.

Define LDA - Answers Land disturbing activity; any man-made change to the land surface that potentially
changes its runoff characteristics; includes clearing, grading, and excavation.

What size LDA must comply with stormwater management regulation? in CPBA areas? - Answers
anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more stringent locally.

what are some activities exempt from SWM regulations? - Answers mining, agriculture, sewer
discharges, local reclamation programs, routine maintenance of preexisting operations, public
emergency activity

what term basically means a plea deal for stormwater offenders? - Answers consent order, which
replaces penalties with fines.

how long does VSMP authority have to review SWM plan? - Answers 15 days to review and determine
approval, and notify applicant.

How often must a VSMP authority inspect an LDA? - Answers Periodically.

all SWPPP requirements may be met by - Answers incorporating other plans into reference, or by
developing missing elements.

What must the DEQ issue to an operator before an LDA? - Answers a construction GP

How soon after final grade of a site must vegetation be put in place? - Answers within 7 days.

How long must operator keep routine inspection reports? - Answers At least 3 years after the GP
expires/terminates.

, How long does operator have to revise SWPPP if authority deems it necessary? How long does local
authority have to review any modifications to SWPPP? - Answers 7 days for operator to make changes,
60 days for authority to review changes.

How long does operator have to notify DEQ of an unauthorized discharge? How long does operator have
to make a written report of this? - Answers within 24 hours of discovery for notification, within 5 days
for written acknowledgement.

What constitutes a measurable rain event according to GP? - Answers 0.25 in. or more over 24 hours.

Co-located practices - Answers During construction, a facility functions for ESC, and is later constructed
into a stormwater BMP.

During construction, when should inspector make sure a BMP is not installed? - Answers BMP should
not be installed before contirbuting drainage area has been stabilized.

Notice of Termination forms, to terminate construction permits, must be sent after how many days once
conditions are met? - Answers 30 days

When is ground considered stabilized? - Answers when vegetation is uniform, mature enough to survive,
and will inhibit erosion.

How long must VSMP authority keep construction record drawings? - Answers Until the relevant SWM
facility is removed.

How soon after meeting permit requirements must the VSMP authority return any bonds or securities to
operator? - Answers within 60 days.

VSMP authorities must ensure that SWM facilities, post-construction, are inspected at least once every
___ years, unless: - Answers at least once every 5 years unless a certified personnel provides inspection
reports at least once a year.

What legislation authorizes the VA SWM Program? - Answers The Virginia Stormwater Management Act

What regulation administers the VA SWM Program? - Answers The Virginia Stormwater Management
Program Regulation

The Stormwater Management act requires the State Water Control Board to do what? - Answers permit,
regulate, and control stormwater runoff

How many days does DEQ have to complete review of real or potential inter-jurisdicitonal impacts upon
request? - Answers 90 days

Who is required to maintain a certificate of competency by the Stormwater Management Act? - Answers
staff of a stormwater program, anyone contracted by a VSMP authority, and all standard and
specification holders
$8.89
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Reseñas de compradores verificados

Se muestran los 2 comentarios
8 meses hace

8 meses hace

Thanks for recognizing my documents useful in your revision. I won't tire providing Quality materials that meets your needs .

9 meses hace

9 meses hace

Thank you for your reviews.

3.5

2 reseñas

5
0
4
1
3
1
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TutorJosh Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
343
Miembro desde
1 año
Número de seguidores
16
Documentos
28801
Última venta
3 días hace
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

53 reseñas

5
18
4
14
3
12
2
0
1
9

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes