Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 13 páginas
Examen

NCIDQ - Ch. 7 PROGRAMMING Exam | Questions with 100% Correct Answers | Updated &Verified | | 100% Score

Document preview thumbnail
Vista previa 2 fuera de 13 páginas

NCIDQ - Ch. 7 PROGRAMMING Exam | Questions with 100% Correct Answers | Updated &Verified | | 100% Score

Vista previa del contenido

NCIDQ - Ch. 7 PROGRAMMING Exam | Questions with 100% Correct Answers |
Updated &Verified | 2024-2025 | 100% Score


What phase of design includes coordinating the work of consultants, integrating the design with teh
applicable building systems, making sure all the requirements of codes and regulations are met, start
budgeting the project based on the client's resources, and developing design and production schedules
for his/her work? - ✔✔Schematic Design



Who is responsible for coordinating the efforts of the designer's office as well as everyone on the
building team who is under contractual agreement with the designer? - ✔✔Interior Designer



When should the interior designer involve the consultants on a project? - ✔✔a early as possible - their
advice is vital to determining the scope of the project, developing broad conceptual approaches to
solving client's problems, and underingstanding the concerns of the client and other design
professionals working on the project.



What is one of the most important tasks for the interior designer during the early stages of a project? -
✔✔The assembly and coordination of the various consultants on the project (Structural, M, E & P at a
minimum)



If the owner contracts directly with the consultant, how does that affect the designer? - ✔✔The
designer avoids any problems with contract provisions and payments but may lose some ability to direct
the consultant.



If the designers writes an agreement directly with the consultant, how does that affect the designer? -
✔✔The designer is responsible for paying the consultant, and he/she has more control but may
encounter problems with paying the consultant's fees if the client payment is delayed.



Once the consultants are retained, what are the designer's responsibilities? - ✔✔The designer should
inform consultants about applicable code requirements for the project. He/she is also responsible for
informing the consultant of any design decisions that may have code implications. The designer is
responsible for ensuring that the drawings and specs conform to applicable codes. THE DESIGNER IS THE
PRIME CONSULTANT AND IS LIABLE TO THE OWNER FOR THE CONSULTANT'S WORK. The designer must
coordinate distributing accurate copies of the drawings to the consultants and keep the consultants
constantly informed of any changes to the program or the layout of the plan.

, What are the consultant's responsibilities? - ✔✔The CONSULTANTS ARE RESPONSIBLE FOR CODE
COMPLIANCE REGARDING THEIR AREA OF WORK. By signing their drawing, the engineering consultant
become responsible for code compliance. They are also responsible for accurate production of their own
drawings and specs, and are responsible for checking their own documents for consistency. HOWEVER,
THE DESIGNER IS THE PRIME CONSULTANT AND IS LIABLE TO THE OWNER FOR THE CONSULTANT'S
WORK.



Is code review and application started at Schematic Design? - ✔✔No, it should begin during
programming and early space planning, and should continue through schematic design.



What code information should be checked during Schematic Design? - ✔✔Check number of exits,
minimum exit separation, maximum travel distance, common path of egress travel, exit widths, dead-
end corridors, and door swings. Very detailed code requirements can be verified in design development.



When should budgets be established? - ✔✔Early in the programming or design process - this is one of
the most important aspects of design because it influences so many design decisions.



After a budget is set, what must a designer do? - ✔✔The designer must work within the set budget and
keep the client advised about any changes that might affect final cost.



In what ways can intial budgets be set? - ✔✔Preset Figure, Public Funding or Legislationm, Client
Describes Extent of Work and Designer Develops Anticipated Budget



What three elements affects a budget? - ✔✔Money, Quantity, Quality - changing one affects the others.



What are construction costs? - ✔✔The moneys required to build or remodel the interior, including
demo, partitions, ceilings, millwork, finishes and M, E and P work - anything attached to and part of the
structure.



How can FFE be purchased? - ✔✔Interior designer can purchase directly (designer arranges delivery and
installation); Specified by designer for purchase and installation by one or more furniture dealers.

Información del documento

Subido en
8 de diciembre de 2024
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$9.98

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
0
Seguidores
0
Artículos
263
Última venta
-


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes