correct answers
- Draw Buildings
- Model Buildings
- Design Buildings
- Construct Buildings
- Write about Buildings - correct answer ✔✔Making Buildings Question --- What do architects do?
wall type - correct answer ✔✔The diamond tag in a CD plan refers to a....
- complete description of building systems (structural, mechanical, HVAC, plumbing, & electrical), interior
and exterior finishes and the building site - correct answer ✔✔Schematic Design
3.) Client Approval
2.) Bidding Phase
1.) Schematic design phase
4.) Design development phase
5.) Construction documents phase - correct answer ✔✔Arrange typical project tasks (from least time to
most)
1.) Schematic design phase
2.) Bidding Phase
3.) Client Approval
4.) Design development phase
5.) Construction documents phase
A Vibrator - correct answer ✔✔Concrete Questions --- Concrete must be compacted in the forms to
eliminate trapped air and to fill completely around the reinforcing steel and into all the corners of the
formwork. What tool is used to accomplish this?
, dropped from a substantial height - correct answer ✔✔Segregation will likely occur during concrete
placement if the concrete is...
B.) Individually, each has a very high allowable tensile strength - correct answer ✔✔Reinforcing steel and
concrete are very compatible. Which of the following is untrue?
A.) The two have similar coefficients of thermal expansion.
B.) Individually, each has a vey high allowable tensile strength.
C.) Concrete bonds well to reinforcing steel.
D.) They are chemically compatible; steel is protected from corrosion by the alkaline chemistry of
concrete
Delay hardening - correct answer ✔✔Admixtures are used in concrete to...
C.) Concrete left in the air after 7 days will have approximately 90 percent of its full strength at 28 days. -
correct answer ✔✔Which of these is a true statement?
A.) Concrete cured under water will have its full strength exactly at 90 days.
B.) Concrete left in the air as early as possible will reach full strength after several years.
C.) Concrete left in the air after 7 days will have approximately 90 percent of its full strength at 28 days.
D.) Concrete curing is not necessary for slabs, only walls.
E.) Concrete hardening continues at subfreezing temperatures, albeit slowly
- Drying shrinkage
- Loads placed on it
- Creep deformation - correct answer ✔✔Over time, concrete deforms because of:
the two-way concrete joist framing system - correct answer ✔✔Site Cast & Precast Concrete Questions
--- The waffle slab is: