Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 34 páginas
Examen

ICC CALIFORNIA UST SERVICE TECHNICIAN QUESTIONS WITH CORRECT ANSWERS (A+)

Document preview thumbnail
Vista previa 4 fuera de 34 páginas

ICC CALIFORNIA UST SERVICE TECHNICIAN QUESTIONS WITH CORRECT ANSWERS (A+)

Vista previa del contenido

ICC CALIFORNIA UST SERVICE TECHNICIAN
QUESTIONS WITH CORRECT ANSWERS (A+)


UDC was required at time of installation for all systems installed after?
January 1, 2000


July 1, 2005, service techs shall possess or work under someone who has acurrent
certification indicating he or she has passed the?
ICC UST Service Technician Exam




ICC cert must be renewed every?24 months



Service techs must possess or be employed by a person who has the appropriate contractor's
license unless?
The individual has a tank testing license


Service tech is defined by any individual who?
Tests UST monitoring equipment, trouble shoots UST systems, and/or installs USTmonitoring
equipment.


If the manufacturer training no longer exist, the local agency may?
Approve comparable alternate training .


UST includes?
Tank and connected piping




What is considered a UST? A petroleum storage tank.

,What UST system meets the requirements for secondary containment?

Doubled wall tanks


According to title 23; the following piping components if installed after July 1,1987 must
have secondary containment.
Pressured product piping



Considered "pipe" on tanks installed after July 1, 2003.
Pressured product piping and below ground vapor recovery.


Under dispenser containment (UDC) was required for all existing USTsystems by
December 31, 2003


System for exchanging gas vapors in a storage tank and product in a fueldelivery truck
Stage 1 vapor recovery


An approved method for non-visual monitoring for existing UST systems.
Statistical Inventory Reconciliation (SIR)


ATG must be capable for detecting a release of?
0.2 gallons per hour


What is no longer an approved method for non-visual monitoring on existingUST systems?
Manual inventory reconciliation.


Automatic line leak detectors installed on underground piping with secondarycontainment
shall be capable of detecting a leak of ?

,3 gallons per hour at 10 psi


How often should ATG be programmed to test the tank?
At least monthly


According to PEI RP 300, a combustible gas can be used to?
Detect vapor leaks in a vapor recovery system.


According to PEI RP 300, a written scope of work for vapor recoveryinstallation should
include?
Construction plans


Positive shut off overfill protection device must stop the flow of fuel when thetank is no
more then?

95% full


According to Executive Order (EO) VR 201-A , what could cause a nozzle shutoff
mechanism or malfunction?
Depended filter seal damage


According to VR 201-A, breakaway reconnection must be?
Logged in GDF log


According to PEI RP 300 what is an INCORRECT method of documentingpiping location?
Sketching a diagram on the inside cover of vapor recovery equipment manual


According to PEI RP 300 as built drawing or pictures of the undergroundpipping and other
components shall be .
maintained as long as UST is in service.

, According to EO VR 101-E maintenance records are required to include what?
Name and Designated UST Operator.


The Phil-Tite EVR Phase 1 system require that vapor vent pipes at any USTsystem be
Used with no more than 3 p/v valves


According to EO VR 2010 after installing a new spout assembly in the Healy900 nozzle the
following test must be conducted?
Nozzle dispensing shut off test


According to Healy EO VR 201-A a vapor recovery record is to be maintainedby?
Gasoline dispensing facility operator(GDF)


An enhanced leak detection test is required within how many feet of a publicdrinking well?
1000 feet


What are the components of the Fire Triangle?

Fuel, Heat/Ignition Source, Oxygen


If equipped with an over fill alarm, it must be located?
So it can be seen or heard from the delivery location.


If installed, the following requires independent 3rd party certification to provecompliance
with established regulations.
Automatic Tank Gauge, Liquid Product Detectors, SIR


Where are ATG's installed?Opening in top of the tank

What is true about ATG's
They're capable of alarming operator of low product level

Información del documento

Subido en
4 de diciembre de 2024
Número de páginas
34
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$15.29

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lectpearl
4.3
(6)
Vendido
53
Seguidores
19
Artículos
1544
Última venta
2 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes