100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Driver Operator Mobile Water Supply. Exam Questions And Correct Answers

Puntuación
-
Vendido
-
Páginas
10
Grado
A+
Subido en
02-12-2024
Escrito en
2024/2025

©BRAINBARTER EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 1 | P a g e Driver Operator Mobile Water Supply. Exam Questions And Correct Answers Identify FIVE requirements for a MWS apparatus that can be found in NFPA 1901 - answer1. An MWS apparatus equipped with a fire pump must have a tank to pump line at least two inches in diameter and be capable of supplying the pump with 500 GPM until at least 80% of the tank is emptied. 2. An MWS apparatus must be equipped with at least one external fill connection connected into the tank that allows the tank to be filled at a minimum rate of 1000 GPM. 3. The external fill connection should be equipped with a valve, strainer, and a 30 degree elbow. 4.Valves that are three inches or larger must be of the slow closing design. 5. An MWS apparatus must have at least three large tank discharges capable of discharging 90% of the tank volume at an average of 1000 GPM. When Checking the left front or right front side of the fire apparatus, don't forget to inspect the: - answersaddle tanks Daily inspection - answerEnsure auxiliary fuel tank is full Operate pump primer Inspect auxiliary winterization system. Weekly Inspection - answerClean intake strainers Pre-service pump certification test are conducted by: - answerAn independent testing agency ©BRAINBARTER EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e When using a static body of water as your water source during fire apparatus service testing, the water surface must not be more than___ feet above the centerline of the pump intake and the water must be at least _____ feet deep. - answer10 Feet above 4 Feet deep If the engine speed check proves the MWS apparatus is running at a different speed than what which it was originally rated, you need to? - answerStop the testing until the problem is corrected. A year has passed and its time conduct the annual vacuum test on your departments MWS apparatus. You're following the procedures for conducting the vacuum test and you've already checked for and removed foreign matter from the hard suction hose. The next step to perform while conducting the vacuum test is to: - answerConnect 20 Feet of the hard suction hose to the pump intake connection. When conducting a priming device test and using a pump of less than 1500 GPM, the priming device should be able to create the necessary vacuum in ____ seconds to lift water 10 feet through 20 feet of hard suction hose. - answer30 seconds Place the steps for conducting a pumping test in the correct order. - answer1. Gradually speed up the pump until the net pump discharge pressure is 150 PSI 2. Use a pitot tube or a flow meter to check the flow of water at the nozzle. 3.Record six different readings at 5-minute intervals for a total of 20 minutes. 4. Set the net pump discharge pressure to 200 PSI. 5. Set the net pump discharge pressure to 250 PSI. Pressure Control Test - answer1. Engage the pump and set it to the pump capacity. 2. Set the pressure control device. 3. Close the discharge valves. 4. Note the pump discharge

Mostrar más Leer menos
Institución
Driver Operator Mobile Water Supply
Grado
Driver Operator Mobile Water Supply









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Driver Operator Mobile Water Supply
Grado
Driver Operator Mobile Water Supply

Información del documento

Subido en
2 de diciembre de 2024
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

©BRAINBARTER EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.




Driver Operator Mobile Water Supply.
Exam Questions And Correct Answers


Identify FIVE requirements for a MWS apparatus that can be found in NFPA 1901 - answer✔1. An MWS
apparatus equipped with a fire pump must have a tank to pump line at least two inches in diameter and
be capable of supplying the pump with 500 GPM until at least 80% of the tank is emptied.



2. An MWS apparatus must be equipped with at least one external fill connection connected into the
tank that allows the tank to be filled at a minimum rate of 1000 GPM.



3. The external fill connection should be equipped with a valve, strainer, and a 30 degree elbow.



4.Valves that are three inches or larger must be of the slow closing design.



5. An MWS apparatus must have at least three large tank discharges capable of discharging 90% of the
tank volume at an average of 1000 GPM.

When Checking the left front or right front side of the fire apparatus, don't forget to inspect the: -
answer✔saddle tanks

Daily inspection - answer✔Ensure auxiliary fuel tank is full



Operate pump primer



Inspect auxiliary winterization system.

Weekly Inspection - answer✔Clean intake strainers

Pre-service pump certification test are conducted by: - answer✔An independent testing agency

1|Page

, ©BRAINBARTER EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
When using a static body of water as your water source during fire apparatus service testing, the water
surface must not be more than___ feet above the centerline of the pump intake and the water must be
at least _____ feet deep. - answer✔10 Feet above



4 Feet deep

If the engine speed check proves the MWS apparatus is running at a different speed than what which it
was originally rated, you need to? - answer✔Stop the testing until the problem is corrected.

A year has passed and its time conduct the annual vacuum test on your departments MWS apparatus.
You're following the procedures for conducting the vacuum test and you've already checked for and
removed foreign matter from the hard suction hose. The next step to perform while conducting the
vacuum test is to: - answer✔Connect 20 Feet of the hard suction hose to the pump intake connection.

When conducting a priming device test and using a pump of less than 1500 GPM, the priming device
should be able to create the necessary vacuum in ____ seconds to lift water 10 feet through 20 feet of
hard suction hose. - answer✔30 seconds

Place the steps for conducting a pumping test in the correct order. - answer✔1. Gradually speed up the
pump until the net pump discharge pressure is 150 PSI



2. Use a pitot tube or a flow meter to check the flow of water at the nozzle.



3.Record six different readings at 5-minute intervals for a total of 20 minutes.



4. Set the net pump discharge pressure to 200 PSI.



5. Set the net pump discharge pressure to 250 PSI.

Pressure Control Test - answer✔1. Engage the pump and set it to the pump capacity.



2. Set the pressure control device.



3. Close the discharge valves.



4. Note the pump discharge

2|Page
$12.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Brainbarter Kaplan University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
330
Miembro desde
2 año
Número de seguidores
153
Documentos
22238
Última venta
6 horas hace
A+ STUDY MATERIALS.

We offer a wide range of high-quality study materials, including study guides practice exams and flashcards. WELCOME.

3.5

54 reseñas

5
21
4
8
3
12
2
4
1
9

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes