100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

UTA INSY 2303 Final Exam with correct answers 2024 Graded A+

Puntuación
-
Vendido
-
Páginas
9
Grado
A+
Subido en
30-11-2024
Escrito en
2024/2025

ERP (Enterprise resource planning) Correct answers A suite of software modules that integrate major business activities such as sales, CRM, and SCM ; it is sometimes described as "the central nervous system of an enterprise". An ERP system can provide the following benefits to an enterprise: Correct answers 1. Improved overall performance by standardizing business processes based on best practices. 2. Minimized technology overhead for managers and other workers who interact with a single, centralized, and integrated set of software modules. 3. Increased efficiency and productivity from streamlined workflows. 4. Improved access to information from a single database. 5. Enhanced customer satisfaction based on efficient sales and distribution. 6. Reduced costs and errors when transferring data between systems such as accounting and human resources. 7. Increased profitability from the ability to collect analytics for all aspects of business operations. 8. Reduced inventory costs resulting from better planning, forecasting, modeling, and tracking. SDLC (System development life cycle) Correct answers The scope of systems analysis and design encompasses the people, procedures, computers, communications networks, and software involved with handling information in an organization. Planning phase of SDLC Correct answers 1. Assembling the project team. 2. Justifying the project. 3. Choosing a development methodology. 4. Developing a project schedule. 5. Producing a project development plan where the goal is to create a project development plan; this planning document includes: 1. A short description of the project including its scope. 2. An estimate of the project costs and potential financial benefits. 3. A list of project team participants. 4. A schedule for the project, including an outline of its phases. Analysis phase of SDLC Correct answers The goal is to produce a list of requirements for a new or revised info system tasks include: 1. Studying the current system 2. Determining system requirements 3. Writing a requirements report

Mostrar más Leer menos
Institución
UTA INSY 2303 Fi
Grado
UTA INSY 2303 Fi









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
UTA INSY 2303 Fi
Grado
UTA INSY 2303 Fi

Información del documento

Subido en
30 de noviembre de 2024
Número de páginas
9
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

UTA INSY 2303 Final
Exam
ERP (Enterprise resource planning) Correct answers A suite of software
modules that
integrate major business activities such as sales, CRM, and SCM ; it is
sometimes
described as "the central nervous system of an
enterprise".
An ERP system can provide the following benefits to an enterprise: Correct
answers 1.overall performance by standardizing business processes
Improved
based on best
practice
s.
2. Minimized technology overhead for managers and other workers who
interactcentralized,
single, with a and integrated set of software
modules.
3. Increased efficiency and productivity from streamlined
workflows.
4. Improved access to information from a single
database.
5. Enhanced customer satisfaction based on efficient sales and
distribution.
6. Reduced costs and errors when transferring data between
systems such
accounting andashuman
resources.
7. Increased profitability from the ability to collect analytics for all aspects
of business
operation
s.
8. Reduced inventory costs resulting from better planning, forecasting,
modeling, and
trackin
g.
SDLC (System development life cycle) Correct answers The scope of
systems
and designanalysis
encompasses the people, procedures, computers,
communications
networks, and software involved with handling information in an
organization.
Planning phase of SDLC Correct answers 1. Assembling the
project
2. team.
Justifying the
project.
3. Choosing a development
4. Developing a project
methodology.
schedule.
5. Producing a project development plan where the goal is to create
a project
development plan; this planning document
includes:
1. A short description of the project including its
scope.
2. An estimate of the project costs and potential financial
benefits.
3. A list of project team
4. A schedule for the project, including an outline of its
participants.
phases.
Analysis phase of SDLC Correct answers The goal is to produce a list of
requirements
for a new or revised info system tasks
include:
1. Studying the current
system
2. Determining system
requirements
3. Writing a requirements
report

, Design phase of SDLC Correct answers The project team must figure out
how thewill
system newfulfill the requirements specified in the system requirements
report activities
during this
phase:
1. Identify potential
solutions
2. Evaluate solutions and select the
best
3. one hardware and
Select
software
4. Develop app
specifications
5. Obtain l
approva
Implementation phase of SDLC Correct answers The phase in which the
project team
supervises tasks necessary to construct new information
system.
Maintenance phase of SDLC Correct answers The phase that involves a
day-to-day
operation of the system, making modifications to improve performance,
and correcting
problem
s.
BI (Business intelligence) Correct answers The process of collecting and
analyzing
and present past
business data as the basis for operational and strategic
decision making.
Object-oriented methodology Correct answers An approach to system
development
regards that
the elements of a system as a collection of objects that interact with
each
to other
accomplish
tasks.
The current standard for object-oriented documentation is referred to
as
Correct answers UML (Unified modeling
.
language)
Object-oriented paradigm Correct answers A paradigm that defines
objects, classes,
and methods. This type of paradigm is efficient for problems that involve
real-world
object
s.
Three of the most frequently used UML tools include: Correct answers
Use case sequence diagrams, and class
diagrams,
diagrams.
Use case diagrams Correct answers Documentation of the users of an
information
system and their
functions.
Class diagram Correct answers A diagram that provides the name of each
object,
of a list attributes, a list of methods, and an indication of the
the object's
cardinality between
object
s.
Sequence diagram Correct answers A tool used by a project team that
depicts the
detailed interactions that take place within an
information system.
System conversion Correct answers The process of deactivating an old
system and activating a new one; it is also referred to as a "cutover" or
information
"to go live".
$16.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
HopeJewels Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
74
Miembro desde
1 año
Número de seguidores
11
Documentos
8819
Última venta
1 semana hace
macellen education agencies

On this page, you find all documents,testsbank ,solution manuals, package deals, On this page, you find all documents, package deals, and flashcards offered by seller Hopejewels

3.5

6 reseñas

5
3
4
0
3
1
2
1
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes