100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Amazon Academy Final Study Guide Questions And Answers (Guaranteed A+)

Puntuación
-
Vendido
-
Páginas
13
Grado
A+
Subido en
28-11-2024
Escrito en
2024/2025

©FYNDLAY EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 1 | P a g e Amazon Academy Final Study Guide Questions And Answers (Guaranteed A+) When should you verify that the Process Assistant has cleared all time on tasks issues? - answerAfter Break Before Loadout (2nd half operation), part of a pre-shift routine is to: - answerCompleting handoff with Sort manager (in face-to-face station walk) After the completion of the Sort shift, which of the following standard work items must be completed: - answerAudit and correct Time on Task errors Prior to the Start of Shift, managers should be monitoring head count and make necessary DOP adjustments by uploading this if needed to ensure we have the correct headcount on shift: - answerVoluntary Extra Time (VET) or Voluntary Time Off (VTO) on the Labor Scheduling Opportunities You notice that on the Sort shift the PPH goal is not being met. You are also worried about meeting your volume goal for the shift. The following is a critical part of the Sort shift that ensures we are on track to meet our goal and allows us to make adjustments ahead of time when necessary: - answerHourly Flow Meetings It is 1:00 and your shift starts at 1:30, what does the Sort manager need to do 30 minutes prior to the induct start time? - answerExecute Container Planning (DCAP) Which of the following happens first during the 2nd half operation shift: - answerVerify DPO pick list and staging plan and have available to print in case of Network Outage You are working to upload your pre-shift plan while comparing your pre-shift to the already created Next Day plan using the latest projected volume, staffing ratios, and TPH. When should you have your pre-shift plan uploaded? - answer30 minutes prior to SOS This ensures that associates are beginning work in their process immediately or as soon as possible after they clock in for the shift. This is crucial for productivity as we need our associates ©FYNDLAY EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 2 | P a g e to begin working as quickly as possible. Our current Network Goal is 2 minutes. - answerFast Start You are responsible for creating the Next Day plan. You finish completing the plan right towards the end of the current shift. Where should you go to upload your finalized Next Day plan? - answerSiphon You need 85 people to safely and efficiently process today's volume. You are currently rostered 97 people and average attendance for this day is 82%. How many associates do you need to accept VET in order to staff the shift? - answer6 Your Station has 225 DA's available per day with an SPR of 195 and an available Flex pool of 75 with an SPR of 40. What is your total dispatch capacity? - answer46,875 You are in charge of Pick & Stage and OTR depends on you for your staging of routes on time. How do you stay proactive to avoid OTD misses? - answerLabor planning properly based off of projected rates and volumes to ensure you have the correct headcount You need 73 people to safely and efficiently process today's volume. You are currently rostered 82 people and average attendance for this day is 82%. How many associates do you need to accept VET in order to staff the shift? - answer6 Your site is expecting a total volume of 57,544 packages today. DSPs have committed to delivery 92% of this, and the remaining 8% will go to the flex pool. Assuming all of the 150 drivers in the flex pool accept routes, at an SPR of 25 packages, how many shipments will not dispatch from the site? (round up to the nearest whole number) - answer854 You are performing your Pick Stage Area walk, what are visual indicators that your Picklist Compliance has misses? Select the two that applyEmpty Stow RacksPackages at the end of stow aislesPackages left in the end cap areasPick racks are full - answerNOT 1 and 3 Only What are key performance indicators that you should look at when choosing candidates for Critical Roles? - answerAll of the above What is the minimum requirement for having 1:1s with your direct manager logged in Ingenii? - answerMonthly Why was Apollo created? - answerApollo was created to be the Audit portal supporting planning, execution, result sharing and reporting of any type of audit, in all NA Delivery Stations. Which of these best describe the problem solve role on loadout? - answerAssociate that resolves partially picked routes, audits route for accuracy, and investigates staging or container

Mostrar más Leer menos
Institución
Amazon Academy
Grado
Amazon Academy









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Amazon Academy
Grado
Amazon Academy

Información del documento

Subido en
28 de noviembre de 2024
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

©FYNDLAY EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.



Amazon Academy Final Study Guide
Questions And Answers (Guaranteed A+)


When should you verify that the Process Assistant has cleared all time on tasks issues? -
answer✔After Break

Before Loadout (2nd half operation), part of a pre-shift routine is to: - answer✔Completing
handoff with Sort manager (in face-to-face station walk)
After the completion of the Sort shift, which of the following standard work items must be
completed: - answer✔Audit and correct Time on Task errors
Prior to the Start of Shift, managers should be monitoring head count and make necessary DOP
adjustments by uploading this if needed to ensure we have the correct headcount on shift: -
answer✔Voluntary Extra Time (VET) or Voluntary Time Off (VTO) on the Labor Scheduling
Opportunities
You notice that on the Sort shift the PPH goal is not being met. You are also worried about
meeting your volume goal for the shift. The following is a critical part of the Sort shift that
ensures we are on track to meet our goal and allows us to make adjustments ahead of time
when necessary: - answer✔Hourly Flow Meetings
It is 1:00 and your shift starts at 1:30, what does the Sort manager need to do 30 minutes prior
to the induct start time? - answer✔Execute Container Planning (DCAP)

Which of the following happens first during the 2nd half operation shift: - answer✔Verify DPO
pick list and staging plan and have available to print in case of Network Outage
You are working to upload your pre-shift plan while comparing your pre-shift to the already
created Next Day plan using the latest projected volume, staffing ratios, and TPH. When should
you have your pre-shift plan uploaded? - answer✔30 minutes prior to SOS
This ensures that associates are beginning work in their process immediately or as soon as
possible after they clock in for the shift. This is crucial for productivity as we need our associates



1|Page

, ©FYNDLAY EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
to begin working as quickly as possible. Our current Network Goal is 2 minutes. - answer✔Fast
Start
You are responsible for creating the Next Day plan. You finish completing the plan right towards
the end of the current shift. Where should you go to upload your finalized Next Day plan? -
answer✔Siphon
You need 85 people to safely and efficiently process today's volume. You are currently rostered
97 people and average attendance for this day is 82%. How many associates do you need to
accept VET in order to staff the shift? - answer✔6
Your Station has 225 DA's available per day with an SPR of 195 and an available Flex pool of 75
with an SPR of 40. What is your total dispatch capacity? - answer✔46,875
You are in charge of Pick & Stage and OTR depends on you for your staging of routes on time.
How do you stay proactive to avoid OTD misses? - answer✔Labor planning properly based off
of projected rates and volumes to ensure you have the correct headcount
You need 73 people to safely and efficiently process today's volume. You are currently rostered
82 people and average attendance for this day is 82%. How many associates do you need to
accept VET in order to staff the shift? - answer✔6
Your site is expecting a total volume of 57,544 packages today. DSPs have committed to
delivery 92% of this, and the remaining 8% will go to the flex pool. Assuming all of the 150
drivers in the flex pool accept routes, at an SPR of 25 packages, how many shipments will not
dispatch from the site? (round up to the nearest whole number) - answer✔854
You are performing your Pick Stage Area walk, what are visual indicators that your Picklist
Compliance has misses? Select the two that applyEmpty Stow RacksPackages at the end of stow
aislesPackages left in the end cap areasPick racks are full - answer✔NOT 1 and 3 Only
What are key performance indicators that you should look at when choosing candidates for
Critical Roles? - answer✔All of the above
What is the minimum requirement for having 1:1s with your direct manager logged in Ingenii? -
answer✔Monthly

Why was Apollo created? - answer✔Apollo was created to be the Audit portal supporting
planning, execution, result sharing and reporting of any type of audit, in all NA Delivery
Stations.

Which of these best describe the problem solve role on loadout? - answer✔Associate that
resolves partially picked routes, audits route for accuracy, and investigates staging or container


2|Page
$11.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Fyndlay Kaplan University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
358
Miembro desde
1 año
Número de seguidores
80
Documentos
18668
Última venta
15 horas hace
Scholar\'s Sanctuary.

Explore a Vast Collection of Finely Made Learning Materials.

3.7

68 reseñas

5
32
4
8
3
13
2
6
1
9

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes