Planning is performed by the... - ANSWERFirst-line, general, and top-level supervisors maintain equipment in good operating condition to - ANSWERmeet production goals, minimize downtime, and operate production line safely A Leadman's responsibility is limited to - ANSWERinstructing The first maintenance organization was a/an - ANSWERline organization In a functional organization, work is divided according to... - ANSWERequipment type An area organization... - ANSWERborrows craftsman as needed in a centrally controlled organization - ANSWERcontrol is limited in the field, large projects are handled separately, work is assigned as requests are processed The written work order used for short duration running repairs is a - ANSWERjob ticket There are______________________ types of written orders you could use. - ANSWERFive types of written orders Work orders - - ANSWERmajor planned and scheduled tasks Job tickets - ANSWERShort duration running repairs standing work orders - ANSWERrepeated job actions master schedules - ANSWERservice and frequency of work under standing work order Special work orders - ANSWERPreventative maintenance Reserve ______________________ instructions for emergencies, as when a worker is injured, or a piece of equipment is nearing breakdown - ANSWERVerbal instructions It is important for a supervisor to sign the stock issue record T/F - ANSWERfalse At different times , maintenance is controlled by the... - ANSWERmaintenance superintendent An organization chart - ANSWERcontains all necessary detail you can overcome resistance to organization changes by - ANSWERadvance preparation, bargaining, and discussion Emergencies - - ANSWERwork that must be done immediately Unscheduled work— - ANSWERrepairs you can delay safely because the equipment won't deteriorate further. • Planned and scheduled work— - ANSWERprojects that require much advance preparation (usually not handled by

Mostrar más Leer menos
Institución
Amazon CMMS Knet Training A
Grado
Amazon CMMS Knet training a










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Amazon CMMS Knet training a
Grado
Amazon CMMS Knet training a

Información del documento

Subido en
20 de noviembre de 2024
Número de páginas
21
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

End of module Quiz for Amazon CMMS
Knet training and summery of each
module With Correct Solutions!!
Planning is performed by the... - ANSWERFirst-line, general, and top-level
supervisors

maintain equipment in good operating condition to - ANSWERmeet production goals,
minimize downtime, and operate production line safely

A Leadman's responsibility is limited to - ANSWERinstructing

The first maintenance organization was a/an - ANSWERline organization

In a functional organization, work is divided according to... - ANSWERequipment
type

An area organization... - ANSWERborrows craftsman as needed

in a centrally controlled organization - ANSWERcontrol is limited in the field, large
projects are handled separately, work is assigned as requests are processed

The written work order used for short duration running repairs is a - ANSWERjob
ticket

There are______________________ types of written orders you could use. -
ANSWERFive types of written orders

Work orders - - ANSWERmajor planned and scheduled tasks

Job tickets - ANSWERShort duration running repairs

standing work orders - ANSWERrepeated job actions

master schedules - ANSWERservice and frequency of work under standing work
order

Special work orders - ANSWERPreventative maintenance

Reserve ______________________ instructions for emergencies, as when a worker
is injured, or a piece of equipment is nearing breakdown - ANSWERVerbal
instructions

It is important for a supervisor to sign the stock issue record T/F - ANSWERfalse

,At different times , maintenance is controlled by the... - ANSWERmaintenance
superintendent

An organization chart - ANSWERcontains all necessary detail

you can overcome resistance to organization changes by - ANSWERadvance
preparation, bargaining, and discussion

Emergencies - - ANSWERwork that must be done immediately

Unscheduled work— - ANSWERrepairs you can delay safely because the equipment
won't deteriorate further.

• Planned and scheduled work— - ANSWERprojects that require much advance
preparation (usually not handled by first-line supervisors).

Which type of maintenance includes the inspection of equipment? -
ANSWERpreventive

scheduling maintenance work is one of the maintenance planners duties t/f -
ANSWERfalse

installing, modifying, and relocating equipment is considered non-maintenance work
and should be funded separately. t/f - ANSWERfalse

the maintenance supervisor can approve schedules for all equipment in the plant t/f -
ANSWERfalse

Project work - ANSWERconstruction, installation, relocation, or modification of
present equipment and buildings

construction - ANSWERbuilding or changing structure of facility

installation - ANSWERinstalling new or rebuilt equipment

equipment modiication - ANSWERmajor changes in existing equipment or facilities

The term maintenance work refers to the repair and upkeep of equipment and
facilities. The work covers preventive maintenance, unscheduled repairs, scheduled
maintenance, emergency repairs, and ______________________ support -
ANSWERfacility

Preventive maintenance - ANSWERmeans any action taken to extend equipment life
or prevent failure before an item malfunctions. It includes inspecting, testing,
lubricating, adjusting, cleaning, and replacing components.

Unscheduled repairs are ______________________ work that can be completed in
less than two manhours. The term also covers work that can be delayed for a short
time with little risk of equipment failure. - ANSWERNonemergency

, Scheduled maintenance refers to major repairs, ______________________, and
overhauls. - ANSWERrebuilds

Emergency repairs - ANSWERare repairs needed immediately

Facility support is a term that covers ______________________work, building and
grounds maintenance, and tool sharpening. - ANSWERjanitorial

unscheduled repairs are usually defined as taking not more than how many
manhours? - ANSWER2

• Adjustments. Minor changes requiring only ______________________ tools, no
parts, and usually less than 0.5 manhours. - ANSWERhand

Backlog - ANSWEREstimated manhours required to complete all work currently
behind schedule. Usually divided into categories according to need: parts and
materials, downtime, manpower, or outside support.

Deferred maintenance. - ANSWERMaintenance you can safely postpone (becomes
part of the backlog).

Equipment repair history. List of repairs made on a piece of equipment that includes
______________________ and cost information. - ANSWERdates

Failure coding - ANSWERList of causes of equipment failure. The causes include
lack of lubrication, operator abuse, and material fatigue, for example.

Inspection - ANSWERChecking equipment to determine needed repairs.

Maintenance work order. A detailed ______________________ request for
maintenance services - ANSWERwritten

Major repairs. - ANSWERExtensive, nonroutine repairs requiring a repair crew.

Minor repairs - ANSWERRepairs completed by one worker using hand tools,
completed in less than two hours. (In many cases, two workers are used for safety's
sake.)

Modification. Change in equipment capability or ______________________. -
ANSWERconfiguration

Overhaul. - ANSWERInspection teardown and repair of equipment to restore it to
effective operating condition.

Planning. Determining the resources and ______________________ needed for a
major job. - ANSWERactions

Priority. - ANSWERListing jobs according to their importance or urgency
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
papersbyjol West Virginia
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
421
Miembro desde
2 año
Número de seguidores
253
Documentos
13980
Última venta
1 semana hace

3.8

72 reseñas

5
27
4
18
3
17
2
2
1
8

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes