Lean Six Sigma Exam 2024 | Lean Six Sigma Actual Exam 2024 Questions and Correct Answers Rated A+

Institución
Lean Six Sigma.
Grado
Lean Six Sigma.

Vista previa del contenido

Lean Six Sigma Exam 2024 | Lean Six
Sigma Actual Exam 2024 Questions and
Correct Answers Rated A+
ToF: Is the basic concepts of Lean are: Just In Time, continuous flow
and waste elimination? -ANSWER-True

ToF: A non-value added activity is on that a customer is willing to pay
for? -ANSWER-False

ToF: By optimizing the time spent of Non-Value Added activities and
eliminating a large proportion of the Non-Value Added (required) Lean
methodologies enable companies to achieve breakthrough results. -
ANSWER-False optimize Value Added Actives

What describes the use of a Product Family Matrix? -ANSWER-
Compares process steps across products and identifies logical
groupings

Lean manufacturing is most concerned with which one of the
following? -ANSWER-Reducing waste

A team is looking at its process from the perspective of the material
flow (from the supplier to customer) and information flow (from
customer to supplier). What Lean technique are they using? -
ANSWER-Value Stream Mapping

Using Lean thinking and principles reduces waste, identifies value
streams, and provides which of the following benefits? -ANSWER-

,Allows the customer to pull product as needed, rather than pushing
product to the customer

In comparing Lean principles to Six Sigma principles, which of these
statements is false?


A Six Sigma principles are problem-focused and stem from the
fundamental belief that process variation is waste
B Six Sigma focuses on improving value streams
C Lean is focused on process flow and views activities that do not add
value as waste
D Lean uses visuals to understand the process flow -ANSWER-B

Who is responsible for providing the organizational structure for
supporting Lean?


A Kaizen Team Leader and team members
B Executive Champion
C Lean Leader
D Deployment Champion -ANSWER-B

Which of the following will enable flow?


A Supervising people
B Implementing a new inventory management system
C Eliminating sources of waste
D Reducing the number of your suppliers -ANSWER-C

,The Cost of Poor Quality is most often calculated during which phase
of the Six Sigma Methodology?


A Improve
B Measure
C Analyze
D Control -ANSWER-B

Judging if a product meets customer requirements is the main
purpose of...


A specification limits.
B warning limits.
C control limits.
D run rule limits. -ANSWER-A

Which term describes measurement of the capability of a process?


A Defects per Million Opportunities (DPMO)
B Critical to Quality (CTQ)
C Just in Time (JIT)
D Design of Experiments (DOE) -ANSWER-A

Which member of the team maintains responsibility over authority and
accountability for the effort? -ANSWER-Executive champion

Storming -ANSWER-In this stage the team leader will help to build self
direction through the resolution of power and authority issues,
decision-making agreements, allowing the team to become more

, independent, using established ground rules to guide team behavior,
establish equal participation opportunities

Norming -ANSWER-A stage in team development where cooperation
is built

A tool that helps turn a large, seemingly overwhelming amount of work
into tasks that are doable, manageable, and measurable is called a...


A WBS (Work Breakdown Structure).
B SIPOC.
C Project Charter.
D SMART. -ANSWER-A

Who is likely to be affected by the outcome of the improvement project
and could be responsible for the final decision on implementing the
proposed solution?


A Team Leader
B Executive Champion
C Stakeholder
D Project Champion -ANSWER-C

The roadmap a team uses to manage and control resources, time and
money to meet improvement objectives is the...


A problem statement.
B goal or AIM statement.
C project charter.

Escuela, estudio y materia

Institución
Lean Six Sigma.
Grado
Lean Six Sigma.

Información del documento

Subido en
14 de noviembre de 2024
Número de páginas
73
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$18.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Tutorhailey Walden University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
30
Miembro desde
3 año
Número de seguidores
14
Documentos
354
Última venta
7 meses hace
The bookstore

Find all past papers and revision material here

4.5

4 reseñas

5
2
4
2
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes