July 1 2005, service techs shall possess or work under someone who has a
current certification indicating he or she has passed the ? - -California UST
service technician exam
-ICC cert must be renewed every? - -24 months
-Service techs must posses or be employed by a person who has the
appropriate contractors license unless? - -The individual has a Tank testing
licens
-Service tech is defined by any individual who? - -Test UST monitoring
equipment
Trouble shoots UST systems
Installs UST monitoring equipment
-If the manufacturer training no longer exist , the local angency may? - -
Approve comparable alternat training .
-UST includes? - -Tank and connected piping
-What is considered and UST - -petroleum storage tank
-What UST system meets the requirements for secondary containment? - -
Doubled wall tanks
-According to title 23; the following piping components if installed after July 1
1987 must have secondary containment - -Pressured product piping
-Considered "pipe" on tanks installed after July 1 2003 - -Pressured product
piping and below ground vapor recovery
-Under dispenser containment (UDC) was required for all UST systems by - -
December 31 2003
-System for exchanging gas vapors in a storage tank and product in a fuel
delivery truck - -Stage 1 vapor recovery
-An approved method for non visual monitoring for existing UST systems. - -
Statistical Inventory Reconciliation (SIR)
-ATG must be capable for detecting a release of ? - -.2 gallons per hour
, -Manual inventory reconciliation. - -No longer an approved method for non
visual monitoring on existing UST systems
-Automatic line leak detectors installed on underground piping with
secondary containment shall be capable of tetecting a leak of ? - -3 gallons
per hour at 10 psi
-ATG should be programmed to test the tank ? - -At least monthly
-According to PEI RP 300 a combustible gas can be used to ? - -Detect vapor
leaks in a vapor recovery system.
-According to PEI RP 300. A written scope of work for vapor recovery
installation should include? - -Construction plans
-Positive shut off overfill protection device must stop the flow of fuel when
the tank is no more then ? - -95% full
-According to EO VR 201 A What could cause a nozzle shut off mechanism or
malfunction? - -Depended filter seal damage
-According to VR 201 A Breakaway reconnection must be ? - -Logged in GDF
log
-According to PEI RP 300 the following method of documenting piping
location is NOT to ? - -Sketch a diagram on the inside cover of vapor recovery
equipment manual
-According to PEI RP 300 as built drawing or pictures of the underground
pipping and other components shall be ? - -Maintained as long as UST is in
service
-According to EO VR 101 E maintance records are required to include? - -
Name and designated UST operator .
-The Phil-Tite EVR phase 1 system require that vapor vent pipes at any UST
system be - -Used with no more then 3 p/v valves
-According to EO VR 2010 after installing a new spout assembly in the Healy
900 nozzle the following test must be conducted ? - -Nozzle dispensing shut
off test
-According to Healy EO VR 201 A a vapor recovery record are to be
maintained by? - -Gasoline dispensing facility operator
(GDF)
1 /QUESTIONS AND ANSWERS
July 1 2005, service techs shall possess or work under someone who has a
current certification indicating he or she has passed the ? - -California UST
service technician exam
-ICC cert must be renewed every? - -24 months
-Service techs must posses or be employed by a person who has the
appropriate contractors license unless? - -The individual has a Tank testing
licens
-Service tech is defined by any individual who? - -Test UST monitoring
equipment
Trouble shoots UST systems
Installs UST monitoring equipment
-If the manufacturer training no longer exist , the local angency may? - -
Approve comparable alternat training .
-UST includes? - -Tank and connected piping
-What is considered and UST - -petroleum storage tank
-What UST system meets the requirements for secondary containment? - -
Doubled wall tanks
-According to title 23; the following piping components if installed after July 1
1987 must have secondary containment - -Pressured product piping
-Considered "pipe" on tanks installed after July 1 2003 - -Pressured product
piping and below ground vapor recovery
-Under dispenser containment (UDC) was required for all UST systems by - -
December 31 2003
-System for exchanging gas vapors in a storage tank and product in a fuel
delivery truck - -Stage 1 vapor recovery
-An approved method for non visual monitoring for existing UST systems. - -
Statistical Inventory Reconciliation (SIR)
-ATG must be capable for detecting a release of ? - -.2 gallons per hour
, -Manual inventory reconciliation. - -No longer an approved method for non
visual monitoring on existing UST systems
-Automatic line leak detectors installed on underground piping with
secondary containment shall be capable of tetecting a leak of ? - -3 gallons
per hour at 10 psi
-ATG should be programmed to test the tank ? - -At least monthly
-According to PEI RP 300 a combustible gas can be used to ? - -Detect vapor
leaks in a vapor recovery system.
-According to PEI RP 300. A written scope of work for vapor recovery
installation should include? - -Construction plans
-Positive shut off overfill protection device must stop the flow of fuel when
the tank is no more then ? - -95% full
-According to EO VR 201 A What could cause a nozzle shut off mechanism or
malfunction? - -Depended filter seal damage
-According to VR 201 A Breakaway reconnection must be ? - -Logged in GDF
log
-According to PEI RP 300 the following method of documenting piping
location is NOT to ? - -Sketch a diagram on the inside cover of vapor recovery
equipment manual
-According to PEI RP 300 as built drawing or pictures of the underground
pipping and other components shall be ? - -Maintained as long as UST is in
service
-According to EO VR 101 E maintance records are required to include? - -
Name and designated UST operator .
-The Phil-Tite EVR phase 1 system require that vapor vent pipes at any UST
system be - -Used with no more then 3 p/v valves
-According to EO VR 2010 after installing a new spout assembly in the Healy
900 nozzle the following test must be conducted ? - -Nozzle dispensing shut
off test
-According to Healy EO VR 201 A a vapor recovery record are to be
maintained by? - -Gasoline dispensing facility operator
(GDF)