Training Exam Review Questions with Correct
Answers | 100% Pass Guaranteed | Graded A+ |
Administrator
[COMPANY NAME] [Company address]
, For Inquiries🤔 about This or 📑Any Other Exam 📱HM
📧
1. Tyrone created a in
project plan sheet and is adding tasks. He added the Smartsh
first task, then moved to the next row to eet?
add his second task.
What will automatically be copied down to the
new row?
Hyperlinks
Formatting
Images
Cell links
2. Which takes priority when a sheet has 2
conditional formatting rules?
The rule on the bottom
The rule on the top
The rule that refers to a specific column
The rule that refers to the entire row
3. Which program files can you import into
Smartsheet to create a new sheet?
Access
Excel
JIRA
4. What can you customize when you insert a
hyperlink in a cell?
URL
preview
Display text
Open in a new
tab Preview
image
5. Which type of user can create or own a sheet
, For Inquiries🤔 about This or 📑Any Other Exam 📱HM
📧
Formatting
The rule on the top
Excel
Display text
Licensed
, For Inquiries🤔 about This or 📑Any Other Exam 📱HM
📧
Date,
System Admin Dropdo
Licensed wn
Admin (Single
Editor Select),
Symbol
6. Which formatting option is possible? Contact
List,
Remove the photo in a Contact Dropdo
List Freeze the top row of a sheet wn
Change the background color of a (Single
row Underline one of three words in a Select),
cell Symbol
7. What permission is required to hide and unhide
columns?
Admin
Commenter
Viewer
Editor
8. Vivian uses a sheet to track the status of a project
that she is managing. Several cells are cell linked to
a sheet
that the IT director uses to track all IT projects.
Vivian updates her sheet.
When do the linked cells on the director's sheet up-
date?
When the director next opens their
sheet When Vivian's sheet is saved
Within 24 hours
When Vivian's sheet is saved
After the director re-links the cell(s)
9. Which are the 3 column types that can enable
Card View?