100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK

Puntuación
-
Vendido
-
Páginas
7
Grado
A+
Subido en
12-11-2024
Escrito en
2024/2025

CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK

Institución
CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK
Grado
CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK
Grado
CLASS A/B OPERATOR FOR UNDERGROUND STORAGE TANK

Información del documento

Subido en
12 de noviembre de 2024
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CLASS A/B OPERATOR FOR UNDERGROUND
STORAGE TANK
The Class A and Class B certification must be renewed every: - Answers- 5 years

UST financial responsibility requirements apply to what? - Answers- 600 gallon used oil
tank

Secondary Containment is required for what? - Answers- New UST Systems, Piping in
contact with the ground, and Replacement UST

A Class A operator shall maintain the records of UST site inspections for a *minimum*
of: - Answers- 3 years

New owners of an existing UST system shall register the UST system with DEQ/LARA
within what period from date of ownership? - Answers- 30 days

UST systems with cathodic protection should be inspected for proper operation by a
qualified cathodic protection tester on the following schedule: - Answers- Every three
years

UST systems with impressed current cathodic protection systems must be inspected at
a minimum: - Answers- Every 60 days

Within what period after a repair should a cathodically protected UST system be tested
to ensure it is working properly? - Answers- 6 months

Line testing of piping shall be capable of detecting X gallons per hour leak rate at 1 and
a half times the operating pressure. X is: - Answers- 0.1 gallons per hour

What actions are not appropriate when when the owner/operator becomes aware of a
spill or overfill? - Answers- Drain the spill to the storm sewer or nearby ditch

Upon confirmation of a release to the soil/groundwater/surface water the operator shall:
- Answers- Report the release to the DEQ within 24 hours, by fax or phone

A Class B operator shall not be responsible for more than the following facilities: -
Answers- 45 facilities

What is the minimum frequency of site inspections to assure operational compliance? -
Answers- Quarterly

If a facility has been determined by the DEQ inspector to be out of compliance with the
significant operational compliance requirements, the DEQ shall retrain: - Answers- The
class A operator of the facility

, When planning to permanently close a UST system, the DEQ must be notified not less
than: - Answers- 30 days

Upon permanent Removal of an UST system, the operator shall: - Answers- Notify the
DEQ within 30 days with an amended registration form

The operator shall notify the DEQ of a confirmed release upon removal of an UST and
visual evidence showing: - Answers- Either there is visibly contaminated groundwater in
the tank cavity or there is visibly contaminated soil in the tank cavity and/or soil removed
from the tank cavity

Upon removal of an UST where there is no visual or olfactoryevidence of a release , the
operator shall: - Answers- Take soil samples, analyze them, and then send the site
assessment results to the DEQ for a determination

A leak should be suspected in 1,560 gallon tank if the variation between the beginning
and ending manual tank gauging liquid level measurements exceeds the weekly
standard of X gallons. X is: - Answers- 26 gallons

The class B operator should inspect the UST system for operational compliance status
at a minimum: - Answers- Every quarter

Release detection records of sampling, testing, or monitoring shall be maintained for: -
Answers- 2 years

When a tank that has been installed for less than 10 years is upgraded with the cathodic
protection, tightness test(s) are required as follows: - Answers- Tightness tests should
be conducted before the installation of cathodic protection and 3-6 months after the
installation of the cathodic protection

UST systems with impressed current cathodic protection systems must also be
inspected at a minimum of: - Answers- Every 60 days

Product inventory control shall be conducted monthly to detect a release of not less
than X% of flow through plus 130 gallons a monthly basis. X% is: - Answers- 1%

Automatic line leak detector may be used only if the method detects X gallons per hour
at 10 pounds per square inch line pressure within one hour. X is: - Answers- 3 gallons
per hour

Tank tightness testing, or another test of equivalent performance, shall be capable of
detecting X gallon per hour leak rate from any portion of the tank while accounting for
the effects of thermal expansion or the contraction of the product, vapor pockets, tank
deformation, evaporation or condensation, and the location of the water table. X is: -
Answers- 0.1 gallons per hour
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GEEKA YALA UNIVERSITY
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2008
Miembro desde
3 año
Número de seguidores
1447
Documentos
48302
Última venta
5 horas hace

3.8

344 reseñas

5
171
4
61
3
44
2
16
1
52

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes