Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

NCCCO Lattice Boom General Knowledge Reviewed Questions With Verified Answers

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
07-11-2024
Escrito en
2024/2025

NCCCO Lattice Boom General Knowledge Reviewed Questions With Verified Answers Placing timber blocking under the tips of the tracks on a crawler crane will;☑️Correct AnsMake the crane more stable What is the major effect of stopping suddenly a rapid swing while operating long boom crane?☑️Correct Ans-Action may cause the crane boom collapse and/or overturn the crane

Mostrar más Leer menos
Institución
NCCCO Lattice Boom
Grado
NCCCO Lattice Boom

Vista previa del contenido

NCCCO Lattice Boom General Knowledge Reviewed
Questions With Verified Answers
Placing timber blocking under the tips of the tracks on a crawler crane will;☑️Correct Ans-
Make the crane more stable



What is the major effect of stopping suddenly a rapid swing while operating long boom
crane?☑️Correct Ans-Action may cause the crane boom collapse and/or overturn the crane



According to B30.10 hooks shall be removed from service when the throat opening exceeds
_____ the original throat opening.☑️Correct Ans-5%




On a crawler crane ground bearing pressure is greatest where?☑️Correct Ans-Over the corner



During disassembly of a long boom, the pendant lines are connected at the maximum cantilever
point and the boom is slightly lifted off the ground, which boom connection pins are to be
removed next?☑️Correct Ans-The bottom pins ahead of the cantilever point



Most crane manufactures require the load chart capacities must be reduced when wind speed
reaches;☑️Correct Ans-20 mph




The definition of cantilever of a lattice boom crane is;☑️Correct Ans-The boom suspended past
the pendant connections

, What chart do you use when operating a crane on a barge;☑️Correct Ans-List chart



According to OSHA, Jibs must have a positive ________ from backwards
overturning☑️Correct Ans-Stop




Mobile cranes on barges shall be☑️Correct Ans-Physically attached to the barge



When a crane is properly barricaded, what is the clearance required all the way around 360
degrees between the superstructure and the barricade when swung 360 degrees?☑️Correct Ans-
2 feet



According to ASME B30.5 a fire extinguisher shall have a rating of __________ and shall be
available at all operator's stations or cabs of the equipment.☑️Correct Ans-10 BC or higher



When assembling a lattice boom crane the top pins of the boom sections should be
inserted;☑️Correct Ans-First



Block hoisting sheaves should have a minimum pitch diameter of at least________ the rope
diameter.☑️Correct Ans-16 times



What is the correct method of checking the brakes of crane that has been already
assembled?☑️Correct Ans-Lift the load a few inches off the ground and apply the brakes

Escuela, estudio y materia

Institución
NCCCO Lattice Boom
Grado
NCCCO Lattice Boom

Información del documento

Subido en
7 de noviembre de 2024
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$6.79
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor
Seller avatar
TutorNest

Conoce al vendedor

Seller avatar
TutorNest Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
1 año
Número de seguidores
0
Documentos
328
Última venta
3 meses hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes