100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

NCCCO QUESTIONS TEST 1 QUESTIONS AND ANSWERS 2025

Puntuación
-
Vendido
-
Páginas
5
Grado
A+
Subido en
03-11-2024
Escrito en
2024/2025

Where is the best location for leveling a crane? - ANSWER Upperworks When determining the "gross load" the best method is: - ANSWER Get an accurate load weight and add the rigging. By order of hitch strength, which is the correct answer? - ANSWER Basket, vertical, choker What is the purpose of using a jib? - ANSWER Increase height When taking a side strain on a boom, what concerns the operator most? - ANSWER Boom damage You should always have at least how many wraps on a hoist drum? - ANSWER 2 On a load chart, values above the bold line mean: - ANSWER Capacities based on structural competence. The primary purpose for a rooster sheave or Auxiliary boom point is to: - ANSWER Separate the hoist lines. What is the proper procedure when using an insulating link or a boot near power lines? - ANSWER Be sure to maintain the correct allowable distance from the lines. When the number of layers of rope on a drum increases, the: - ANSWER Allowable line pull decreases. What is the minimum allowable distance from the crane and power lines under 50kV? - ANSWER 10 ft. The term "Upperworks or Superstructure" refer to the area of the crane: - ANSWER Above the turntable Side loading may be caused by: - ANSWER Starting or stopping the swing too rapidly. What is the best procedure to follow when underground utilities may be present? - ANSWER Contact local utility company Eccentric main boom tip reeving causes: - ANSWER Twisting of the boom

Mostrar más Leer menos
Institución
NCCCO Mobile Crane
Grado
NCCCO Mobile Crane









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NCCCO Mobile Crane
Grado
NCCCO Mobile Crane

Información del documento

Subido en
3 de noviembre de 2024
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NCCCO QUESTIONS TEST 1 QUESTIONS
AND ANSWERS 2025
Where,is,the,best,location,for,leveling,a,crane?,-,ANSWER,Upperworks


When,determining,the,"gross,load",the,best,method,is:,-
,ANSWER,Get,an,accurate,load,weight,and,add,the,rigging.



By,order,of,hitch,strength,,which,is,the,correct,answer?,-,ANSWER,Basket,,vertical,,choker


What,is,the,purpose,of,using,a,jib?,-,ANSWER,Increase,height


When,taking,a,side,strain,on,a,boom,,what,concerns,the,operator,most?,-
,ANSWER,Boom,damage



You,should,always,have,at,least,how,many,wraps,on,a,hoist,drum?,-,ANSWER,2


On,a,load,chart,,values,above,the,bold,line,mean:,-
,ANSWER,Capacities,based,on,structural,competence.



The,primary,purpose,for,a,rooster,sheave,or,Auxiliary,boom,point,is,to:,-
,ANSWER,Separate,the,hoist,lines.



What,is,the,proper,procedure,when,using,an,insulating,link,or,a,boot,near,power,lines?,-
,ANSWER,Be,sure,to,maintain,the,correct,allowable,distance,from,the,lines.



When,the,number,of,layers,of,rope,on,a,drum,increases,,the:,-
,ANSWER,Allowable,line,pull,decreases.

, What,is,the,minimum,allowable,distance,from,the,crane,and,power,lines,under,50kV?,-
,ANSWER,10,ft.



The,term,"Upperworks,or,Superstructure",refer,to,the,area,of,the,crane:,-
,ANSWER,Above,the,turntable



Side,loading,may,be,caused,by:,-,ANSWER,Starting,or,stopping,the,swing,too,rapidly.


What,is,the,best,procedure,to,follow,when,underground,utilities,may,be,present?,-
,ANSWER,Contact,local,utility,company



Eccentric,main,boom,tip,reeving,causes:,-,ANSWER,Twisting,of,the,boom


How,many,randomly,broken,wires,must,there,be,to,remove,a,running,wire,rope,from,service?,-
,ANSWER,6



When,lifting,personnel,in,a,man-basket,using,6x19,wire,rope,,the,minimum,safety,factor,is?,-
,ANSWER,7



What,is,the,safety,factor,required,when,using,non,rotating,wire,rope,and,lifting,personnel,in,a,m
an-basket?,-,ANSWER,10


Who,has,the,responsibility,for,determining,the,correct,weight,of,a,load?,-,ANSWER,Supervisor


When,working,near,power,lines,,when,is,a,signal,person,required?,-
,ANSWER,When,crane,moves,within,a,boom's,length,of,power,lines.



When,an,operator,leaves,the,crane,,he,must,first:,-
,ANSWER,Put,the,load,on,the,ground,and,put,all,dogs,or,pawls,in.
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TargeterWings NURSING
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
19
Miembro desde
1 año
Número de seguidores
0
Documentos
240
Última venta
1 semana hace
YOU

I know how frustrating it can get with all those assignments mate. Nursing Being my main profession line, i have essential guides that are A graded, I am a very friendly person so don

4.5

4 reseñas

5
2
4
2
3
0
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes