100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Home Inspector National Exam Prep COMPLETE SOLUTIONS GRADED A+

Puntuación
-
Vendido
-
Páginas
15
Grado
A+
Subido en
01-11-2024
Escrito en
2024/2025

Home Inspector National Exam Prep COMPLETE SOLUTIONS GRADED A+

Institución
MS Or M.S. - Master Of Science
Grado
MS or M.S. - Master of Science









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
MS or M.S. - Master of Science
Grado
MS or M.S. - Master of Science

Información del documento

Subido en
1 de noviembre de 2024
Número de páginas
15
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

11/2/24, 12:45 AM Home Inspector National Exam Prep Flashcards | Quizlet



Home Inspector National Exam Prep
COMPLETE SOLUTIONS GRADED A+

Terms in this set (85)


It is important to maintain a positive grade 1
away from the structure of at LEAST _______
inch drop per foot for six feet. A. 1/4 B. 1/2
C. 3/4 D. 1

Which of the following BEST describes the Conclusion
report statement shown below? "The roof
is in good condition for its age." A.
Conclusion B. Recommendation C.
Description D. Disclaimer

Which of the following conditions would A pin hole in the heat exchanger
be LEAST critical to your client's safety? A.
A pin hole in the heat exchanger B. No
handrails on an interior stairway C. Lack of
a pressure and temperature relief valve on
the water heater D. A non-reversing garage
door opener

The normal MINIMUM run for a residential 9 inches
stair tread is: A. 7 in. B. 8 in. C. 9 in. D. 11 in.

Standard three light electrical testers are Three light testers will not detect multiple wiring problems
NOT always reliable because: A. Some
receptacles only have two prongs B. Three
light testers sometimes have broken bulbs
C. Three light testers will not detect
multiple wiring problems D. Different test
device manufactures have different light
patterns




https://quizlet.com/64575664/home-inspector-national-exam-prep-flash-cards/ 1/15

, 11/2/24, 12:45 AM Home Inspector National Exam Prep Flashcards | Quizlet
Bulging plaster is observed high up on Potential safety issue
several bedroom walls. The primary
concern is the bulging plaster is a(n): A.
installation defect B. indication the home
was very cold for a period of time C.
indication the air handler leaked D.
potential safety issue

EIFS is a siding material that: A. Is used in Looks like stucco but lacks a wire mesh
commercial buildings only. B. Looks like
stucco but lacks a wire mesh. C. Can be
installed on top of a modified bitumen
membrane. D. Can be installed on top of a
masonry surface.

While inspecting a home, you observe a Approved brace or box
large ceiling fan with built-in lamps. This
installation requires a(an): A. Strong ceiling.
B. Pancake junction box. C. Approved
brace or box. D. Larger junction box.

What are the types of heat that must be Sensible and latent heat
taken into account when calculating the
cooling loads for an HVAC system?


a. Sensible and radiant heat
b. Radiant and conductive heat
c. Conductive and latent heat
d. Sensible and latent heat

Which of the following would be most 6" fiberglass batt insulation
likely to have the highest R-value?


a. 6" fiberglass batt insulation
b. 12" cast-in-place concrete wall
c. 2" extruded polystyrene panel
d. Triple insulated glazing system with ½" air
spaces

An inspector can often determine the Post and beam construction, balloon framing, platform framing, ICF construction
approximate age of a home by its method
of construction. Which of the following
choices shows the methods of construction
in order from first developed to most
recently developed?


a. Post and beam construction, balloon
framing, platform framing, ICF construction
b. Balloon framing, post and beam
construction, ICF construction, platform
framing
c. ICF construction, balloon framing, post
and beam construction, platform framing
d. Post and beam construction, platform
framing, balloon framing, ICF construction




https://quizlet.com/64575664/home-inspector-national-exam-prep-flash-cards/ 2/15
$9.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
mbitheeunice2015 Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
11
Miembro desde
3 año
Número de seguidores
3
Documentos
1870
Última venta
5 meses hace
Classic Writers

I am a certified academic writer specializing in dissertations, online class management, essays, quizzes and exams. Buy my latest updated study materials and improve your grades. 100% sure answers.

4.0

1 reseñas

5
0
4
1
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes