At what stage of the construction process would the builder cut out the sole plate in a door opening? - ANSWER after the wall has been erected and braced When wide square edge boards are being used for board and batten siding, how should the batten strips be nailed ? - ANSWER to only one siding board According to the code, the minimum allowable height of a guardrail at a restaurant deck (or any commercial building) is _____ inches above the finished floor height of the deck or balcony. - ANSWER 42

Mostrar más Leer menos
Institución
CONTRACTOR LICENSE
Grado
CONTRACTOR LICENSE










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CONTRACTOR LICENSE
Grado
CONTRACTOR LICENSE

Información del documento

Subido en
1 de noviembre de 2024
Número de páginas
26
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

General Contractor License - KB2 Study Prep -
Full Set CORRECT 100%

At what stage of the construction process would the builder cut out the sole plate in a door opening? -
ANSWER after the wall has been erected and braced



When wide square edge boards are being used for board and batten siding, how should the batten strips
be nailed ? - ANSWER to only one siding board



According to the code, the minimum allowable height of a guardrail at a restaurant deck (or any
commercial building) is _____ inches above the finished floor height of the deck or balcony. - ANSWER
42



If the blueprint does not disclose an exterior doors rough opening, then the standard practice would be
to frame the width _____ oversize. - ANSWER 2 inches



How are resilient channels used in drywall application? - ANSWER to decrease sound transmission in
walls and partitions



What screws are used to attach steel studs to the top and bottom steel track? - ANSWER pan head, type
S. It attaches stud to runner up to 14-ga



In single family dwelling sleeping rooms, the minimum net clear opening width of windows, which are
required for emergency egress or rescue, is _____ inches. - ANSWER 20



According to the code what is the minimum slope on which asphalt strip shingles may be installed? -
ANSWER 2:12



According to Code the MAXIMUM diameter of a hole that may be bored in a 2 by 10 joist is _____
inches. - ANSWER 3

, According to the Code, notches allowed in the top or bottom of joists shall not exceed what fraction of
the depth of the joist? - ANSWER 1/6



While trenching and excavating, OSHA requires at least _____ feet of clear unobstructed distance from
the trenches edge to the toe or edge of the dirt or spoils pile. - ANSWER 2 feet



What is the actual size of a 2 x 4 surfaced dry piece of framing lumber? - ANSWER 1-1/2 by 3-1/2



What is the minimum height of a guardrail on a residential deck ? - ANSWER 36 inches



A minimum tread run for stairways (other than spiral stairs) in single family dwellings having an occupant
load of less than 10 is _____ inches. - ANSWER 10



Dampening of the subgrade or the wood concrete forms prior to the placement of concrete will: -
ANSWER prevent rapid extraction of the mixing water from the concrete



Notches on the ends of joists shall not exceed _____ percent of the joist depth. - ANSWER 25 (1/4th)



According to code, asphalt shingles installed on roof with a slope of 4:12 or greater require an
underlayment of: - ANSWER one layer #15 non-perforated felt



How much clearance is the wood framing required to have where a masonry chimney passes through
the roof opening? - ANSWER 2 inches



Asphalt shingles installed in warmer climates with a slope of 4 in 12 or more should have a minimum
underlayment of: - ANSWER 1 layer of # 15



When should concrete curing procedures start? - ANSWER As soon as possible after finishing.



A kind of molding installed on the vertical wall used to accept aluminum soffit panels is: - ANSWER "F"
Channel

, A concrete slab should be bull floated as soon as possible after: - ANSWER screeding



According to OSHA, powered concrete trowels that are manually guided shall be equipped with: -
ANSWER a hand release shut off switch



For open valleys, valley lining of two plies of mineral-surfaced roll roofing complying with ASTM D 3909
or ASTM D 6380 shall be permitted. The bottom layer shall be _____ and the top layer a minimum of
_____ wide. - ANSWER 18 inches, 36 inches



What is the minimum footing width on solid rock? - ANSWER 12 inches



What is the minimum width of a load bearing CMU wall with filled cells? - ANSWER 8 inches



What is the minimum gauge of sheet metal veneer wall ties? - ANSWER 22 gauge



What do you call a metal used to keep water from seeping into a house? - ANSWER flashing



What is the load bearing value(PSF) of sandy gravel? - ANSWER 3,000 psf



What is the inner piece around a door frame called? - ANSWER Jamb



What does the "R" after the contractors license number represent? - ANSWER The licensee's scope of
work is resticted



According to OSHA, what type of guard (or safety) is required for a power saw? - ANSWER Point of
operation



What is the maximum slope of a footing trench before stepping is required? - ANSWER 10%



Concrete and masonry foundation walls shall be waterproofed _____. - ANSWER All of the above
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lecchris West Virgina University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
40
Miembro desde
2 año
Número de seguidores
15
Documentos
3203
Última venta
3 semanas hace
LECCHRIS

3.8

6 reseñas

5
2
4
1
3
3
2
0
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes