Module QSP Exam Review 2024
Module QSP Exam Review 2024 Should the construction start date or end date change, what is required to be submitted to SMARTS? - ANS-a. A revised Notice of Intent through a Change of Information. b. A revised risk determination. c. An amended SWPPP. d. All of the above. (Correct Answer) Who must sign the No Discharge Technical Report? - ANS-a. A California licensed professional engineer with hydrological expertise. c. A California licensed professional geologist with hydrological expertise. d. a or c (Correct Answer) Which of the following must be included in the Notice of Termination photo documentation? - ANS- a. A description of the corresponding location and orientation of the photos as indicated in the site map. b. Photos of the site's final site conditions and post-construction BMPs. c. a and b. (Correct Answer) A Notice of Termination is automatically approved if no action is taken by the RWQCB after what amount of time? - ANS-30 days Under what conditions are projects exempt from the post-construction requirements in Order, Section IV.N.3? - ANS-a. They are subject to the post-construction standards of an active phase I MS4 permit. b. They are subject to the post-construction standards of an active phase II MS4 permit. c. They are linear underground and overhead projects. d. Any of the above. (Correct Answer
Escuela, estudio y materia
- Institución
- Module QSP
- Grado
- Module QSP
Información del documento
- Subido en
- 1 de noviembre de 2024
- Número de páginas
- 5
- Escrito en
- 2024/2025
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
module qsp
-
module qsp exam review 2024
-
should the construction start date or end date cha
-
who must sign the no discharge technical report
Documento también disponible en un lote