100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CEPSCI EXAM….QUESTIONS AND 100% VERIFIED ANSWERS

Puntuación
-
Vendido
-
Páginas
10
Subido en
27-10-2024
Escrito en
2024/2025

CEPSCI EXAM….QUESTIONS AND 100% VERIFIED ANSWERS...

Institución
CEPSCI
Grado
CEPSCI









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CEPSCI
Grado
CEPSCI

Información del documento

Subido en
27 de octubre de 2024
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Desconocido

Temas

Vista previa del contenido

The National Pollutant Discharge Elimination System, or NPDES, is the
answer.

Answer to the Clean Water Act In 1972, the EPA administered


Answer to the Water Quality Act In 1987, the CWA was amended to control
stormwater emissions under the NPDES program.

Pollution from Point Sources: A ANSWER emissions from easily recognized
sources, such as treatment facilities

The answer to the nonpoint source solution Runoff from agricultural or urban
regions

South Carolina's NPDES: ANSWER A delegated state is SC. SCDHEC is
responsible for administering regulations.

ANSWER Construction General Permit, CGP Phase II, went into force on
September 1, 2006.

Coverage of NPDES Permits: ANSWER: 1 or more acres of disturbed land. In
the SC Coastal Zone, within half a mile of a receiving body of water

ANSWER Notice of Intent (NOI)

OCRM CGP Requirements: ANSWER Coverage is provided seven days
following DHEC's receipt of the NOI

SCDOT CGP Requirements: ANSWER Coverage is provided 10 days
following DHEC's receipt of the NOI

, CGP Requirements for DHEC: 20 days after DHEC receives the completed
NOI, ANSWER Coverage is given.

Before submitting a NOI, the ANSWER Storm Water Pollution Prevention Plan
(SWPPP) was finished and prepared in compliance with Phase II CGP.

Requirements for SWPPP-ANSWER Operator identification
Construction sequence Locations of all BMPs Locations of all state surface
waters

CGP Submission: ANSWER It must adhere to all other permits.
Federal reporting obligations must be met.
After construction is finished, file NOT.
Keep records for three years.

Answer to the pre-construction meeting Ten or more acres
Make sure all co-permittees understand SWPPP.
The preparer and contractors who are not co-permittees need to be present.

ANSWER for Contractor Certification Co-permittees attest that they attended a
Pre-Con meeting and are in charge of overseeing the SWPPP.
All contractors who are not co-permittees are required to attend a Pre-Con
meeting and attest to their accountability to DHEC.

Qualifications for EPSC Inspectors: ANSWER: Those who have completed a
course approved by DHEC.

Inspection Frequency: ANSWER (A) At least once every seven days, or (B) At
least once every fourteen days and within twenty-four hours of the conclusion
of a storm event, if the site is temporarily stabilized; or (C) Once a month.

Locations of Inspections: ANSWER Every location affected by construction
Locations where materials are stored that are subject to precipitation
Structures for controlling sedimentation and erosion in SWPPP
Every discharge site
Locations downstream that are nearby
Construction entrances
$11.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Boostertips Chamberlain College Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
259
Miembro desde
3 año
Número de seguidores
195
Documentos
5175
Última venta
1 mes hace

3.8

44 reseñas

5
19
4
8
3
10
2
2
1
5

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes