100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

CMGT - 360 DBIA FUNDAMENTALS OF PROJECT TEST BANK SOLUTION MANUAL RATED 100%

Puntuación
-
Vendido
-
Páginas
22
Grado
A+
Subido en
27-10-2024
Escrito en
2024/2025

CMGT - 360 DBIA FUNDAMENTALS OF PROJECT TEST BANK SOLUTION MANUAL RATED 100% Hammurabi - Answers ( BC) established the earliest known body of laws written to govern its people which included codes for builders Code of Hammurabi - Answers Obligation of design & construction to society Vitruvius - Answers * Roman writer, engineer, architect lived in 1st century BC (Roman Empire) ++ He created the original design and construction hand book (De Architectura Libri Decem "10 books of architecture" -- manufacturer of building materials/roads & bridges/heating water/amplification) * Credited with transitionong the practice of architecture and engineering to a routine practice * Established design and construction management as learned professions Brunelleschi - Answers * Quintessential design-builder and innovator () * Italian Artist-Architect-Builder (1420) * Master Builders who developed the "dome" concept for the Gothic Cathedral of Florence (the duomo) * Key figgure in the transition from the Middle Ages to the modern Renaissance area Middle Ages - Answers Craft training and education Renaissance - Answers Separate design and construction Leone Battista Alberti - Answers * First intentional separation of the art from the craft (1456) * Poet, Philosopher and secretary to the Pope. * The rise of professionalism: First push to separate design and construction as distinct functions The Rise of Professionalism - Answers * Established architecture as a profession distinct from the science of engineering and construction * From 15th century Renaissance in to 19th century Industrial Revolution, Architects retained responsibilities for both design and construction * Industrial Revolution brought on the separation of design and construction Return to Integration - Answers * DBIA founded in 1993 to help standardize and advocate for an already emerging design-build industry * Integrated Project Delivery (IPD) * Building Information Modeling (BIM) * Sustainable Design (Green/LEED) * High Performance Contracting (LEAN - Toyota Production Model) Effects of the Industrial Revolution - Answers - Division of Labor: Building professions took on increasingly defined roles of architects, engineer, and builder - Entrepreneurship: need fpr architects and engineers to take risk and assure performance and cost of facilities (construction) - Need for capital: Responded to need by non-participating owners (stockholders) becoming an integral part of projects Professional Societies - Answers • Greater professional specialization • Increase in specialized knowledge • Promotion & advocacy of professional interests & markets • Ethical standards of practice • Rise of conflict-of-interest issues ++Middle 19th century there was a clear distinction had been made between design professionals and builders • 1852 American Society of Civil Engineers an Architects (ASCEA) • 1857 Architects dropped and American Institute of Architects (AIA) was formed ++Design professionals wanted to separate themselves from sometimes corrupt builders The Miller Act (1935) - Answers ++Public contracting law mandating separation of design from construction * Contractor selection solely on lowest responsible bid * Existing Federal law requiring any federal project exceeding $100,000 to require two bonds (performance and a labor and material bond) * Implemented during World War I and Wold War II to reduce the risk of fraud, favoritism, undue influence, and reassurance to taxpayers their tax dollars were being spent properly. * Worked well for a long time... but new procurement methods are on the rise, especially the construction industry Professional licensing requirements - Answers * First license laws for Architect licensing initiated in 1897 * Architects, engineers, and contractors are required to be registered as licensed or certificated in most every state ++Professional license laws do not require design and construction be separate functions The Advent of Modern Design-Builders - Answers Lack of voluntary cooperation on more demanding jobsites lead to the advent of new delivery systems: * Construction managers (CM) * CM@Risk *Design-Build (Integrated Project Delivery) Project Delivery - Answers A comprehensive process including planning, design, construction & other services, necessary for organizing, executing & completing a building facility or project (method to organize, execute and complete a project) Three fundamental Owner decisions - Answers Delivery system, Procurement method, and contract format (Developing the "Acquisition Strategy) Importance of the Project Delivery Method - Answers *Establishes when the parties become engaged * Influences the choices of contractual relationships among the parties (determines how the parties constructing the project will interact with each other) *Influences ownership & impact of changes & modifications of project cost (determines the best method to ensure the Owner's project objectives are met while at the same time allowing the project to be completed on time within budget) 3 basic parties involved in the project delivery process - Answers Owner, Designer, and Contractor Familiar Project Delivery Methods - Answers * Design-Bid-Build (D-B-B) sometimes called "Traditional", most common and familiar delivery method * Multiple Prime (M-P) * Construction Management at Risk (CM@R) also known as CM/GC * Design-Build (D-B) Design-Bid-Build Advantages - Answers * Owner has control over the entire process (Owner involvement minimized after construction is initiated) ++A/E works directly for Owner ++The contractor works directly for Owner ++Known quantities to Owner, designer and constructors ++Reduced Owner risk. Risk almost completely on contractor * Provides benefits of open market competition * Relationships are well defined * Low first cost is the priority ++Project is simple ++Procurement laws restrict use of anything else * Owner wants to control design * No need for value engineering or innovation Design-Bid-Build Disadvantages - Answers ++Construction professional are not involved in design (no constructability review) ++Relationship between Architect and Contractor is informal ++Linear with no overlap in task leading to longer project durations/schedules. Slowest project delivery (Usually leads to limited interaction and team building among project team. Team works autonomously) ++Relies on a good set of plans and contract documents. Unforeseen conditions a risk. Multi-Prime (M-P) Advantages - Answers ++Owner has control over the entire process * A/E works directly for Owner

Mostrar más Leer menos
Institución
CMGT - 360 DBIA FUNDAMENTALS OF PROJECT
Grado
CMGT - 360 DBIA FUNDAMENTALS OF PROJECT










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CMGT - 360 DBIA FUNDAMENTALS OF PROJECT
Grado
CMGT - 360 DBIA FUNDAMENTALS OF PROJECT

Información del documento

Subido en
27 de octubre de 2024
Número de páginas
22
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CMGT - 360 DBIA FUNDAMENTALS OF PROJECT TEST BANK SOLUTION MANUAL RATED 100%

Hammurabi - Answers (1795- 1750 BC) established the earliest known body of laws written to govern its
people which included codes for builders

Code of Hammurabi - Answers Obligation of design & construction to society

Vitruvius - Answers * Roman writer, engineer, architect lived in 1st century BC (Roman Empire)

++ He created the original design and construction hand book (De Architectura Libri Decem "10 books of
architecture" -- manufacturer of building materials/roads & bridges/heating water/amplification)

* Credited with transitionong the practice of architecture and engineering to a routine practice

* Established design and construction management as learned professions

Brunelleschi - Answers * Quintessential design-builder and innovator (1377 - 1446)

* Italian Artist-Architect-Builder (1420)

* Master Builders who developed the "dome" concept for the Gothic Cathedral of Florence (the duomo)

* Key figgure in the transition from the Middle Ages to the modern Renaissance area

Middle Ages - Answers Craft training and education

Renaissance - Answers Separate design and construction

Leone Battista Alberti - Answers * First intentional separation of the art from the craft (1456)

* Poet, Philosopher and secretary to the Pope.

* The rise of professionalism: First push to separate design and construction as distinct functions

The Rise of Professionalism - Answers * Established architecture as a profession distinct from the science
of engineering and construction

* From 15th century Renaissance in to 19th century Industrial Revolution, Architects retained
responsibilities for both design and construction

* Industrial Revolution brought on the separation of design and construction

Return to Integration - Answers * DBIA founded in 1993 to help standardize and advocate for an already
emerging design-build industry

* Integrated Project Delivery (IPD)

* Building Information Modeling (BIM)

,* Sustainable Design (Green/LEED)

* High Performance Contracting (LEAN - Toyota Production Model)

Effects of the Industrial Revolution - Answers - Division of Labor: Building professions took on
increasingly defined roles of architects, engineer, and builder

- Entrepreneurship: need fpr architects and engineers to take risk and assure performance and cost of
facilities (construction)

- Need for capital: Responded to need by non-participating owners (stockholders) becoming an integral
part of projects

Professional Societies - Answers • Greater professional specialization

• Increase in specialized knowledge

• Promotion & advocacy of professional

interests & markets

• Ethical standards of practice

• Rise of conflict-of-interest issues

++Middle 19th century there was a clear distinction

had been made between design professionals

and builders

• 1852 American Society of Civil Engineers an

Architects (ASCEA)

• 1857 Architects dropped and American Institute

of Architects (AIA) was formed

++Design professionals wanted to separate

themselves from sometimes corrupt builders

The Miller Act (1935) - Answers ++Public contracting law mandating separation of design from
construction

* Contractor selection solely on lowest responsible bid

, * Existing Federal law requiring any federal project exceeding $100,000 to require two bonds
(performance and a labor and material bond)

* Implemented during World War I and Wold War II to reduce the risk of fraud, favoritism, undue
influence, and reassurance to taxpayers their tax dollars were being spent properly.

* Worked well for a long time... but new procurement methods are on the rise, especially the
construction industry

Professional licensing requirements - Answers * First license laws for Architect licensing initiated in 1897

* Architects, engineers, and contractors are required to be registered as licensed or certificated in most
every state

++Professional license laws do not require design and construction be separate functions

The Advent of Modern Design-Builders - Answers Lack of voluntary cooperation on more demanding
jobsites lead to the advent of new delivery systems:

* Construction managers (CM)

* CM@Risk

*Design-Build (Integrated Project Delivery)

Project Delivery - Answers A comprehensive process including planning, design, construction & other
services, necessary for organizing, executing & completing a building facility or project (method to
organize, execute and complete a project)

Three fundamental Owner decisions - Answers Delivery system, Procurement method, and contract
format (Developing the "Acquisition Strategy)

Importance of the Project Delivery Method - Answers *Establishes when the parties become engaged

* Influences the choices of contractual relationships among the parties (determines how the parties
constructing the project will interact with each other)

*Influences ownership & impact of changes & modifications of project cost (determines the best
method to ensure the Owner's project objectives are met while at the same time allowing the project to
be completed on time within budget)

3 basic parties involved in the project delivery process - Answers Owner, Designer, and Contractor

Familiar Project Delivery Methods - Answers * Design-Bid-Build (D-B-B) sometimes called "Traditional",
most common and familiar delivery method

* Multiple Prime (M-P)
$6.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TutorJosh Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
342
Miembro desde
1 año
Número de seguidores
16
Documentos
28610
Última venta
3 días hace
Tutor Joshua

Here You will find all Documents and Package Deals Offered By Tutor Joshua.

3.6

53 reseñas

5
18
4
14
3
12
2
0
1
9

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes