100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

NCCCO TEST Questions With Top-Quality Answers

Puntuación
-
Vendido
-
Páginas
2
Grado
A+
Subido en
25-10-2024
Escrito en
2024/2025

1) According to ASME, when rails are used for the crane support, the rails splices mus: - ANSWER-A) be smooth 2) What is the task of high-tensile bolt connections between tower sections? - ANSWER-A) To avoid fail. 3) According to the Tower Crane Reference Manual, how often should the hoist wire rope be lubricated? - ANSWER-A) Every 200 hours of operation. 4) According to the Tower Crane Reference Manual, which operation Does Not risk the stability of the crane? - ANSWER-A) Decrease the load after have lifted it. 5) Before and after the climbing of a tower crane, how do you plumb the tower? - ANSWER-A) when the tower is balanced. 6) According to sheet C, where does the climbing unit have to be located with 12 tower sections added and the guided section removed? - ANSWER-A) On the undercarriage. 7) How much does a cubic foot of steel weights? - ANSWER-A) 490 LBS. 8) What's the purpose of the twist compensator? - ANSWER-A) To avoid twisted hook block.

Mostrar más Leer menos
Institución
Nccco
Grado
Nccco








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Nccco
Grado
Nccco

Información del documento

Subido en
25 de octubre de 2024
Número de páginas
2
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NCCCO TEST Questions With Top-
Quality Answers
1) According to ASME, when rails are used for the crane support, the rails splices mus:
- ANSWER-A) be smooth



2) What is the task of high-tensile bolt connections between tower sections? -
ANSWER-A) To avoid fail.



3) According to the Tower Crane Reference Manual, how often should the hoist wire
rope be lubricated? - ANSWER-A) Every 200 hours of operation.



4) According to the Tower Crane Reference Manual, which operation Does Not risk the

stability of the crane? - ANSWER-A) Decrease the load after have lifted it.



5) Before and after the climbing of a tower crane, how do you plumb the tower? -
ANSWER-A) when the tower is balanced.



6) According to sheet C, where does the climbing unit have to be located with 12 tower

sections added and the guided section removed? - ANSWER-A) On the undercarriage.



7) How much does a cubic foot of steel weights? - ANSWER-A) 490 LBS.



8) What's the purpose of the twist compensator? - ANSWER-A) To avoid twisted hook
block.



9) According to OSHA, when erecting or dismantling self erecting tower cranes,
$10.19
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Vaster
5.0
(2)

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Vaster Stanford University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4
Miembro desde
1 año
Número de seguidores
1
Documentos
794
Última venta
1 mes hace

5.0

2 reseñas

5
2
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes