Examen

SOS NERC PREP – RELIABILITY Latest Exam (QUESTIONS WITH VERIFIED ANSWERS) A+ GRADED

Puntuación
-
Vendido
-
Páginas
88
Grado
A+
Subido en
23-10-2024
Escrito en
2024/2025

SOS NERC PREP – RELIABILITY Latest Exam (QUESTIONS WITH VERIFIED ANSWERS) A+ GRADED

Institución
SOS NERC PREP – RELIABILITY
Grado
SOS NERC PREP – RELIABILITY











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
SOS NERC PREP – RELIABILITY
Grado
SOS NERC PREP – RELIABILITY

Información del documento

Subido en
23 de octubre de 2024
Número de páginas
88
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

SCORE MORE




SOS NERC PREP – RELIABILITY Latest Exam
(QUESTIONS WITH VERIFIED ANSWERS) A+
GRADED

The Reliability Coordinator just informed you of a slow time error correction which will begin at the top
of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency
Bias Setting is -100 MW/.1Hz. What action should you take?



A) Increase Net Interchange Schedule by 20 MWs.



B) Inform the Reliability Coordinator that you cannot participate in the time error correction.



C) Decrease Net Interchange Schedule by 20 MWs.



D) Increase Net Interchange Schedule by 10 MWs.

A) Increase Net Interchange Schedule by 20 MWs.




A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen
instantaneously in the change of which of the following values?



1. Actual Net Interchange

2. Scheduled Frequency

3. Scheduled Net Interchange

4. Area Control Error

,SCORE MORE


A) 4 only

B) 1 & 3

C) 1 & 4

D) 3 & 4

C) 1 & 4




Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties, actual frequency,
and all __________.



A) Tie lines readings

B) Generators output

C) Scheduled frequency indications

D) Transformer load

A) Tie lines readings




Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net Actual Interchange is
+100 MW and its Net Scheduled Interchange is +200 MW. If Balancing Authority A's frequency bias
setting is 100 MW/0.1 Hz, what is ACE?



A) -100

B) 0

C) 10

D) 100

A) -100

,SCORE MORE


A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to 1600 on a summer
day. The Net Interchange Actual for those same hours respectively were -230 MW, -275 MW, -250 MW
and -270 MW. What was the Balancing Authority's Inadvertent Interchange for the 4-hour period?



A) 6 MWs out

B) 25 MWs in

C) 25 MWs out

D) 6 MWs in

B) 25 MWs in




For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency, and all
________________ must be metered.



A) Generation

B) Communications

C) Transformers

D) Tie lines

D) Tie lines




If the frequency bias setting is set to a less negative value than the frequency response of a Balancing
Authority and a frequency increase is caused by a sudden loss of load in an external balancing area,
what will be the result?



A) The ACE will be zero and will take no AGC action



B) The ACE will be a negative value and AGC will increase generation



C) The ACE will be a positive value and AGC will lower generation

, SCORE MORE




D)This will not affect the ACE

B) The ACE will be a negative value and AGC will increase generation




If the frequency bias setting is less negative than the frequency response of a Balancing Authority and a
frequency decline is caused by a sudden loss of generation in an external balancing area, what will be
the result?



A) The ACE will be a negative value and AGC will increase generation.



B) This will not affect the ACE.



C) The ACE will be a positive value and AGC will lower generation.



D) The ACE will be zero and will take no AGC action.

C) The ACE will be a positive value and AGC will lower generation.




It is the responsibility of which entity/entities to develop, maintain, and implement load shedding plans?



A) Transmission Operators and Balancing Authorities



B) Reliability Coordinator



C) Load Serving Entities



D) Balancing Authority

A) Transmission Operators and Balancing Authorities
$25.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TOPMARKSOLUTIONS Boston College
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
155
Miembro desde
3 año
Número de seguidores
97
Documentos
1031
Última venta
1 semana hace
TOPMARKSOLUTIONS

I TOPMARKSOLUTIONS have done research wide and far to make sure that I have provided you with the best and legitimate study resources. This resources include ;FINAL EXAMS, MIDTERM EXAMS, QUIZS, WEEKLY BASED KNOWLEDGE CHECKS, TESTBANKS ,ASSIGNMENTS & HOMEWORKS. I deal majorly in NURSING, MATHEMATICS ,BIOS & BUSSINESS

4.7

261 reseñas

5
199
4
50
3
5
2
1
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes