100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

SOS NERC PREP.pdf

Puntuación
-
Vendido
-
Páginas
101
Grado
A+
Subido en
22-10-2024
Escrito en
2024/2025

Exam of 101 pages for the course HESI EXIT EXAM 2024.docx at HESI EXIT EXAM 2024.docx (SOS NERC PREP.pdf)

Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
22 de octubre de 2024
Número de páginas
101
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

SOS NERC PREP - RELIABILITY EXAM
LATEST 2024 ACTUAL EXAM 200 QUESTIONS
AND CORRECT DETAILED ANSWERS
(VERIFIED ANSWERS) |ALREADY GRADED A+




An 800 MW generator trips in a Balancing Authority
external to your Balancing Authority Area. Which of
the following indications would you expect to see in
your area?

A) Net Actual Interchange would decrease
significantly.

B) ACE would drop to approximately -800 MW.

C) Frequency would drop, and ACE would remain
relatively unchanged.

D) Frequency would drop, and ACE would increase
significantly. - ...ANSWER...C) Frequency would drop,
and ACE would remain relatively unchanged.

,When is the only time voltage reduction for load relief
is acceptable on the transmission system?

A) When voltage on the distribution system is already
low.

B) It is acceptable anytime load relief is needed.

C) When the system is separated from the
Interconnection.

D) When Interconnection frequency is above 60.00 Hz.
- ...ANSWER...C) When the system is separated from
the Interconnection.

In system restoration, priority should be given to:

A) Restoring customer load as quickly as possible.
B) Reporting disturbance to NERC and DOE.
C) Restoring auxiliary power to off-line generators.
D) Restoring power to critical facilities. -
...ANSWER...D) Restoring power to critical facilities.

If a Balancing Authority or Reserve Sharing Group is
experiencing conditions where all available resources
are committed to meet firm load, firm transactions, and
reserve commitments, what does the deficient entity
need to request their Reliability Coordinator to issue?

A) Energy Emergency Alert Level 3

,B) Energy Emergency Alert Level 1
C) Energy Emergency Warning
D) Energy Emergency Alert Level 2 - ...ANSWER...B)
Energy Emergency Alert Level 1

A Transmission Operator's Emergency Operating Plan
states when voltages fall below .87 per unit (p.u.) or
87% of nominal voltage and remains at that level for a
sustained period of 10 minutes or longer, manual load
reduction actions are required. When the system voltage
returns to .9 p.u. or 90% manual load disconnection is
not required.

If a generator trips off line within the BA and the
nearby 230 kV system voltage immediately drops to
200 kV and remains at that level for the next 3 minutes.
What is the BA required to do?

A) Wait 7 minutes for the remaining generator AVRs to
respond; close capacitor banks; adjust Transformer
Taps.

B) Immediately disconnect firm system load until the
voltage returns to at least .9 p.u. Notify the RC of the
amount of load disconnected.

C) Immediately take actions to raise the voltage
EXCEPT removing firm system load. Notify the RC
and neighboring BA's. Prepare for manual load
reduction if the voltage remains below 9 p.u over the

, next 7 minutes - ...ANSWER...C) Immediately take
actions to raise the voltage EXCEPT removing firm
system load. Notify the RC and neighboring BA's.
Prepare for manual load reduction if the voltage
remains below .9 p.u. over the next 7 minutes.

A condition when a Load-Serving Entity has exhausted
all other options and can no longer provide its
customers' expected energy requirements is referred to
as ____________?

A) Energy Emergency
B) Energy deficiency
C) Load shortage
D) Energy shortage - ...ANSWER...A) Energy
Emergency

You are currently in the early stages of restoration with
600 MWs of synchronized generation. There is 200
MWs of spinning reserve available. To maintain
acceptable frequency control, what is the largest block
of load that can be restored at one time?

A) 10 MWs
B) 20 MWs
C) 30 MWs
D) 60 MWs - ...ANSWER...C) 30 MWs

If firm Load shed is imminent or in progress, what level
Energy Emergency Alert is required?
$18.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
MBIUKIA

Conoce al vendedor

Seller avatar
MBIUKIA Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
3 año
Número de seguidores
2
Documentos
422
Última venta
2 año hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes