100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

NCCCO EXAM 1 QUESTIONS WITH 100% CORRECT ANSWERS [ GRADED A+]

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
21-10-2024
Escrito en
2024/2025

NCCCO EXAM 1 QUESTIONS WITH 100% CORRECT ANSWERS [ GRADED A+] What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? - Boom up When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? - 1% The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? - Stay in the cab until the lines are de-energized

Mostrar más Leer menos
Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Grado

Información del documento

Subido en
21 de octubre de 2024
Número de páginas
8
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

NCCCO EXAM 1 QUESTIONS WITH

100% CORRECT ANSWERS [ GRADED

A+]




What action does a signal person intend the operator to perform if he

extends his arm at shoulder height, makes a fist with his hand, and

sticks his/her thumb up? - ✔✔ Boom up


When hoisting personnel, within what percentage of level must a

telescopic boom crane be in order for the gross ratings in the load chart

to remain valid? - ✔✔1%


The load line of the crane you're operating contacts an energized

power line. There's no sign of any other danger, such as fire. What

should you do? - ✔✔ Stay in the cab until the lines are de-energized

, According to OSHA 1926.1413, how many randomly distributed broken

wires in rotation-resistant rope are cause for replacement of the rope?

- ✔✔2 broken wires in 6 rope diameters


What is the net capacity of a crane on main boom unless the

manufacturer states otherwise? - ✔✔ The capacity listed in the load

chart minus the weight of the rigging and all attachments

What may happen to a properly rigged load when lifted off the ground

unless the operator takes account of boom deflection? - ✔✔ It could

swing out away from the crane


What Standard Method hand signal is being illustrated? - ✔✔ Swing


Who should an operator respond to a "stop" signal from? - ✔✔ Anyone


Which area do truck cranes without a 5th outrigger generally have no

lifting capacity unless the manufacturer states otherwise? - ✔✔ The

fron
$8.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
morren

Conoce al vendedor

Seller avatar
morren Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1
Miembro desde
3 año
Número de seguidores
2
Documentos
1269
Última venta
1 año hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes