100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

ICC Technician {California} Exam Questions With Revised Correct Detailed Answers |ALREADY GRADED A+ PASS >> BRAND NEW VERSION!

Puntuación
-
Vendido
-
Páginas
16
Grado
A+
Subido en
19-10-2024
Escrito en
2024/2025

ICC Technician {California} Exam Questions With Revised Correct Detailed Answers |ALREADY GRADED A+ PASS >> BRAND NEW VERSION! 1) Overfill prevention shall alert transfer operator when tank is __% full - ANSWER 90% 2) Flapper Valves shall provide positive shut off when tank is filled to no more than __% capacity - ANSWER 95% 3) Primary pressurized piping shall be tested for tightness hydrostatically at __% of design operating pressure - ANSWER 150% 4) Date that all UST systems must have Line Leak Detector installed - ANSWER November 9,2004 5) Secondary containment testing shall be done upon ____, __months, and every ___ months or ____ years thereafter - ANSWER Installation 6 months 36 months or 3 years 6) Owners/ops shall submit SCT results to local agency within ____ days of completion - ANSWER 30 days 7) All monitoring equipment shall be tested, calibrated, operated, maintained, and certified every ____ months. - ANSWER 12 months 8. I do a ____ after replacing a spout to a Healy 900 nozzle - ANSWER test 9. In a balance hose the gasoline flows in - ANSWER Inner hose shut off 10. After the installation of the vapor piping and before back filling, PEI 300 suggests some methods to document piping layout, except? - ANSWER Drawing with a pen, pipe layout on the cover of the tank manual.

Mostrar más Leer menos
Institución
ICC California
Grado
ICC California










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ICC California
Grado
ICC California

Información del documento

Subido en
19 de octubre de 2024
Número de páginas
16
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ICC Technician {California}
Exam Questions With Revised
Correct Detailed Answers
|ALREADY GRADED A+ PASS
>> BRAND NEW VERSION!


1) Overfill prevention shall alert transfer operator when tank is __% full -
ANSWER 90%


2) Flapper Valves shall provide positive shut off when tank is filled to no more
than __% capacity - ANSWER 95%


3) Primary pressurized piping shall be tested for tightness hydrostatically at __%
of design operating pressure - ANSWER 150%


4) Date that all UST systems must have Line Leak Detector installed - ANSWER
November 9,2004


5) Secondary containment testing shall be done upon ____, __months, and every
___ months or ____ years thereafter - ANSWER Installation
6 months

,36 months or 3 years


6) Owners/ops shall submit SCT results to local agency within ____ days of
completion - ANSWER 30 days


7) All monitoring equipment shall be tested, calibrated, operated, maintained,
and certified every ____ months. - ANSWER 12 months


8. I do a ____ after replacing a spout to a Healy 900 nozzle - ANSWER shut off
test


9. In a balance hose the gasoline flows in - ANSWER Inner hose


10. After the installation of the vapor piping and before back filling, PEI 300
suggests some methods to document piping layout, except? - ANSWER
Drawing with a pen, pipe layout on the cover of the tank manual.


11. During VO-1000 you don't - ANSWER Work without eye protection


12. An Overfill Alarm device needs to be located - ANSWER Where it can be
heard or seen by the delivery location.


13. When in a GDF you can avoid the installation of UDC? - ANSWER No
exceptions of any GDF.

, 14. What is considered an Underground Storage Tank? - ANSWER Tank and
pipping only


15. Gasoline vapors are 3/4 times _____ than air - ANSWER Heavier


16. Compounds with a high vapor pressure such as gasoline will evaporate readily
and will typically - ANSWER Have a low Flashpoint.


17. The ____ is the valve that controls pressure and vacuum on the tank. -
ANSWER P/V Valve


20. The vapor piping must be all, but not - ANSWER Compatible with
underground environment.


21. The Shear Valve is installed ____ - ANSWER At the base of the dispenser.


22. What is the max length of a Healy Hose Phase 2? - ANSWER 20 Feet.


23. A ___ is a component of the hanging hardware that separates when it's
applied a force? - ANSWER Breakaway.


24. UL listed means all except : - ANSWER Worldwide Approved.


25. After a drive off, a technician should not - ANSWER Ask attendant to fill
out a drive off accident report.
$10.14
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
NURSINGDICTIONARY Harvard University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
247
Miembro desde
2 año
Número de seguidores
87
Documentos
2592
Última venta
1 día hace
NURSING ENCYCLOPEDIA

As a Career Tutor, I understand the pressure of managing demanding coursework, exams, and practical requirements across multiple disciplines. These professionally organized revision materials are designed to support students in nursing, healthcare administration, business, information systems, Engineering, health, IT, or trade courses management programs by simplifying complex concepts and reinforcing high-yield academic content. The materials are developed to help students: Understand core theories and practical applications across Multiple Disciplines Review exam relevant content aligned with undergraduate and graduate curriculam To Strengthen critical thinking, analytical reasoning, and decision-making skills Save time with clear, structured summaries instead of overwhelming textbooks Prepare efficiently for tests, assignments, case studies, and professional exams Each resource is created with academic standards in mind, integrating real world examples, industry terminology, and evidence based concepts commonly required in professional programs. Whether you are studying nursing fundamentals, healthcare management, information systems, project management, business strategy, Engineering these materials provide focused, reliable support for academic success. These revision guides are ideal for: Nursing and allied health students Healthcare administration and public health students Business, MBA, and management students Information technology and information systems students, engineering, business, IT, or trade courses If you are looking for clear, student-friendly, exam-focused revision materials that support multiple career pathways, these resources are designed to help you study smarter, perform better, and stay confident throughout your academic journey. WISH YOU SUCCESS!!

Lee mas Leer menos
4.1

29 reseñas

5
15
4
5
3
7
2
1
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes