Components of a Plan - ANSWERS-• Table of Contents
• ESC Plan (part of a SWPPP)-addresses land
disturbance activities
• Certification
"I certify under penalty of law..."
• NOI for Construction or Industrial Permits
• Runoff Coefficient
• Receiving Waters and
their Water Quality
• Environmental
Assessment
• Endangered Species
• Historical Preservation
• Project Information
• Disturbed areas of the
project
• Scheduling of
Construction Activities
• Maintenance schedule
,of BMPs
Site Specific Information on a plan - ANSWERS-Soils
• Topography
• Utilities
• Limits of Project
Plan Certification - ANSWERS-• May need to be signed and dated by
authorized parties, site operator, owner,
engineer, and Plan
preparer
• Identifies the person or
persons responsible
for implementation
NPDES permits potential pollutants - ANSWERS-• Sediment
• Turbidity
• Hydrocarbons-Petroleum Products
• Biological
• Nutrients
• Metals
, MS4 TMDL requirements - ANSWERS-Solid Waste
• Temperature
• Hazardous Waste/Toxic
Waste
• Trash
• Construction Materials Handling
• Organics
monitoring/sampling and analysis - ANSWERS-• TMDLs
• Visible (sediment or
turbidity)
• Non-visible pollutants (pH)
• Sampling protocol
and chain of custody
Categories of BMPs - ANSWERS-• Site Planning and
Management
• Training/scheduling
• Erosion Control BMPs
• Sediment Control BMPs
• Runoff Control BMPs
• Good