100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

PJM 5900 Final Exam Questions And Correct Answers

Puntuación
-
Vendido
-
Páginas
10
Grado
A+
Subido en
13-10-2024
Escrito en
2024/2025

PJM 5900 Final Exam Questions And Correct Answers...

Institución
PJM 5900
Grado
PJM 5900









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PJM 5900
Grado
PJM 5900

Información del documento

Subido en
13 de octubre de 2024
Número de páginas
10
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PJM 5900 Final Exam Questions And
Correct Answers

Projects and Operations All of the following are true about projects and operations,
EXCEPT: - ANSWER Because projects are temporary, they cannot be used to achieve an
organization's long-range goals. Therefore, strategic work can be generally done within
the organization's regular operations.



Which of the following statements BEST defines a project? - ANSWER A temporary
organization or endeavor undertaken to deliver a unique product, service, or result.



The grouping of generally sequential and sometimes overlapping project phases, whose
name and number are determined by the management and control needs of the
organization or organizations involved in the project, is termed as: - ANSWER Project
life cycle.



The term portfolio management refers to: - ANSWER The centralized management of
one or more portfolios to achieve strategic objectives.



All of the following are questions that the key stakeholders and project managers should
answer to develop the project success measures, EXCEPT: - ANSWER What are the
communication requirements?



Which of the following statements best describes Project management? - ANSWER The
application of knowledge, skills, tools, and techniques to project activities to meet the
project requirements.



Which of the following statements about the project life cycle and the product life cycle
is NOT true? - ANSWER The predictive project life cycle contains the product life cycle.

, All of the following are true about project phases and the project life cycle, EXCEPT: -
ANSWER Cost and staffing levels are generally level for the duration of the project life
cycle.



The PMBOK® Guide is the standard for: - ANSWER Managing most projects most of the
time.



Which of the following statements best describe the term program? - ANSWER A group
of related projects, subsidiary programs, and program activities managed in a
coordinated manner.



Where configuration control has, as its focal points, the specifications of both the
deliverables and processes, change control will keep the spotlight on the identification,
documentation, and approval or rejection of changes to the project documents,
deliverables, or baselines.



Some of the configuration management activities included in the Perform Integrated
Change Control process include all of the following activities, EXCEPT: - ANSWER
Monitoring changes in resource leveling heuristics to ensure efficient utilization of
resources throughout the life cycle of the project.



Which of the following processes is included in Project Integration Management? -
ANSWER Develop project management plan.



Lessons learned documentation generally includes all of the following, EXCEPT: -
ANSWER Other types of lessons learned about communications management.



All of the following are characteristics of the project charter, EXCEPT: - ANSWER It is
used primarily to request bids for a project or a specific phase of a project.



Which of the following is NOT true about tools and techniques of Perform Integrated
Change Control? - ANSWER They include project plan updates.
$9.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Easton West Virgina University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
502
Miembro desde
2 año
Número de seguidores
221
Documentos
21907
Última venta
1 día hace

3.9

111 reseñas

5
53
4
21
3
21
2
7
1
9

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes