Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 5 páginas
Examen

FDNY COLLAPSE EXAM QUESTIONS AND ANSWERS 2024/2025( A+ GRADED 100% VERIFIED).

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

FDNY COLLAPSE EXAM QUESTIONS AND ANSWERS 2024/2025( A+ GRADED 100% VERIFIED).

Vista previa del contenido

FDNY COLLAPSE
True or False --- structural collapse is a single command event and the FDNY has been
designated as the IC? - ANS True

Clean wood at beam ends is an indicator that roofs or walls are pulling away from walls and
signs of a possible collapse---true or false - ANS True

Collapse--who. Has prime responsibility for rescue activities at the incident site and assumes
the role of incident commander for structural collapse that produce casualties or threaten public
safety? - ANS The FDNY fire officer

What should be special called to every major collapse if none is assigned on the initial alarm? -
ANS Tower ladder

What is the single most important consideration in a collapse? - ANS Safety at the scene

At all explosions and major collapses, SOC units shall ensure the immediate area is monitored
for what? - ANS The presence of radiological/chemical agents

Collapse---explosions should be viewed as possible. __________sites until monitoring shows
the area to be clear of contamination - ANS Dirty bombs

What needs to be carefully evaluated before attempting complicated rescues? - ANS The
safety of personnel

If possible both the1st and 2nd arriving engines should take hydrants where? - ANS Separate
hydrants outside the block, each on separate mains...

Where should the 3rd and 4th engine position themselves? - ANS Also in separate hydrants in
the rear of the structure

How should 2 of the 2nd alarm engine companies position themselves? - ANS They should be
used to seal off the block

Initially what should be the only unit in front of the building? - ANS The first arriving tower
ladder

True or false---the staging area manager can be a company officer? - ANS True--until replaced
by a chief

, First alarm engine company duties from highest priority to least priority? - ANS 1. Extinguish fire
in affected building and surrounding debris
2. Protect exposures
3. Extinguish burning vehicles
4. Stretch and charge 2 1/2 precautionary line and also a 3 1/2 line to tower ladder
5. Terrorist event 2 1/2 line should be between tower ladder to protect personnel

What is the 1st engine responsible for? - ANS Officer supervises water supply activities/app.
placement
The officer must ensure stretching of 2 1/2 line to cover the entire building
consider stretching 3 1/2 line to supply TL

What is the 2nd arriving engine company responsible for? - ANS Ensuring a 3 1/2 line is
stretched to the first TL
If necessary members may perform CFRD duties

What are the responsibilities of 3rd and subsequent arriving engine companies? - ANS Fire
control
stretch additional lines
Perform cfrd duties
assist in removal of lightly buried victims

What does the first ladder company do? - ANS Perform scene survey
hazard assessment and control
remove surface victims
perform visual void search...DO NOT cut,lift or remove load bearing members

What should the 2nd arriving ladder company do? - ANS Immediately begin the process of
controlling the gas, electric and water services

Third and subsequent ladder companies at a collapse are responsible for? - ANS Search line of
sight voids, assist with utilities, perform debris removal, cut timbers, assist with victim removal

If collapse conditions are present requiring an extensive rescue and search...what signal must
be transmitted? - ANS 10-60

Who is assigned as the street coordination manager? - ANS A company officer

Collapse--What does the acronym LCES stand for: - ANS Lookouts, Communications, Escape
routes, Safe havens

Collapse---what should lookouts be equipped with? - ANS Air Horns, HT's

What does 1 long horn blast mean? - ANS Cease Operations/All quiet

Información del documento

Subido en
9 de octubre de 2024
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
12
Seguidores
2
Artículos
1260
Última venta
8 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes