100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Ammo 5 Level CDC Module 4|93 Review Exercise Questions And Answers

Puntuación
-
Vendido
-
Páginas
7
Grado
A+
Subido en
08-10-2024
Escrito en
2024/2025

After 463L pallets are positioned on a rollerized trailer, what can you use to secure the pallets to the trailer? - ️️MB-1 chain assemblies and/or tie-down straps An electric saw blade must be operating at what speed before it contacts the material being cut? - ️️Full Before loading, unloading, or unpinning the trolley assemblies, what needs to happen to the trolley stop plunger? - ️️Ensure it is engaged in the appropriate hole Before using an electric drill, what is the first thing you should do? - ️️Make sure the diameter of the hole to be drilled is within the capacity of the drill During in-shop maintenance, which equipment provides power to the GFU-7/E ammunition loader assembly (ALA) ? - ️️GFU-8/E During the loading operation, which of the following steps are not to be accomplished? - ️️Side load binder handles will be secured on the passenger side of the vehicle Even though TO 11-1-38 has its own safety section, what other publication should you reference for safely transporting explosive items on base? - ️️Defense Explosives Safety Regulation (DESR) 6055.09_Air Force Manual (AFMAN) 91-201 For the latitudinal configuration, where are the rail assemblies positioned on the trailer deck? - ️️Perpendicular to the trailer deck How is the yaw positioning from the cradle or boom controls of an MJ-1 lift truck adjusted? - ️️Manually How many different rail configurations can the aluminum rail set be assembled on the trailer deck? - ️️Six How many openings (hinged door panels) are on the deck of the MHU-226 trailer? - ️️Three How many pounds per square inch (psi) of clean, dry air is required at the tool end of the air hose to ensure the tool is operating safely and efficiently? - ️️90 How many rail conveyors does the munitions assembly conveyor consist of? - ️️Four

Mostrar más Leer menos
Institución
Ammo 5 Level CDC
Grado
Ammo 5 Level CDC









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Ammo 5 Level CDC
Grado
Ammo 5 Level CDC

Información del documento

Subido en
8 de octubre de 2024
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

After 463L pallets are positioned on a rollerized trailer, what can you use to secure the pallets to the
trailer? - ✔ ✔ MB-1 chain assemblies and/or tie-down straps

An electric saw blade must be operating at what speed before it contacts the material being cut? - ✔
✔ Full

Before loading, unloading, or unpinning the trolley assemblies, what needs to happen to the trolley stop
plunger? - ✔ ✔ Ensure it is engaged in the appropriate hole

Before using an electric drill, what is the first thing you should do? - ✔ ✔ Make sure the diameter of
the hole to be drilled is within the capacity of the drill

During in-shop maintenance, which equipment provides power to the GFU-7/E ammunition loader
assembly (ALA) ? - ✔ ✔ GFU-8/E

During the loading operation, which of the following steps are not to be accomplished? - ✔ ✔ Side
load binder handles will be secured on the passenger side of the vehicle

Even though TO 11-1-38 has its own safety section, what other publication should you reference for
safely transporting explosive items on base? - ✔ ✔ Defense Explosives Safety Regulation (DESR)
6055.09_Air Force Manual (AFMAN) 91-201

For the latitudinal configuration, where are the rail assemblies positioned on the trailer deck? - ✔ ✔
Perpendicular to the trailer deck

How is the yaw positioning from the cradle or boom controls of an MJ-1 lift truck adjusted? - ✔ ✔
Manually

How many different rail configurations can the aluminum rail set be assembled on the trailer deck? - ✔
✔ Six

How many openings (hinged door panels) are on the deck of the MHU-226 trailer? - ✔ ✔ Three

How many pounds per square inch (psi) of clean, dry air is required at the tool end of the air hose to
ensure the tool is operating safely and efficiently? - ✔ ✔ 90

How many rail conveyors does the munitions assembly conveyor consist of? - ✔ ✔ Four

, How often should the positive locking devices on the doors of munitions transport modules be checked?
- ✔ ✔ After loading, unloading, and periodically between stops

How often should the universal ammunition loading system (UALS) replenisher assemblies be inspected?
- ✔ ✔ Every 90 days when in use and annually when in storage

If you cannot fully close the load-binder handle by hand, - ✔ ✔ adjust the load-binder hooks on the
chain.

In regards to ground transportation, when are nuclear weapons moved by convoy? - ✔ ✔ Every time
weapons are moved

It is a requirement to damage explosives or containers to ensure munitions are secured to the trailer. -
✔ ✔ False

It is a requirement to ensure rail extenders are properly installed and secured with quick-release pins
prior to use. - ✔ ✔ True

Once verified that an item is nuclear certified, how is it identified as such? - ✔ ✔ Positive
identification by a nameplate, label, appropriate markings, or by official documents

Pintle safety locking pins must remain attached to the pintle assembly - ✔ ✔ to prevent an unsecure
pin from coming out and getting lost.

The annunciators displayed on the Fluke 8025-series multimeter are used to distinguish among - ✔ ✔
ohms, kilohms, and megohms.

The following are all good safety practices to follow when using a lifting sling except - ✔ ✔ inspecting
the sling by passing your bare hand over the body of the sling.

The parking brake on the MHU-110/M is applied by - ✔ ✔ pulling either one of two hand levers
located on each side of the front of the trailer.

The primary difference between a bobtail and a pickup truck is the - ✔ ✔ bobtail's back end is
shortened by about one-half.

The purpose of cutting lubricant in most drilling operations is to increase the - ✔ ✔ drilling speed
and the drill bit life.

The purpose of the transport beam beneath the lift arm assemblies on the MJ-1-series lift truck is to - ✔
✔ provide added support and to relieve hydraulic pressure from the lift arms when carrying loads for
long distances.

The rails configured in the longitudinal direction run perpendicular with the trailer deck and are placed
approximately in the front, center, and rear of the trailer. - ✔ ✔ False
$8.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
jackline98 Stanford University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
262
Miembro desde
2 año
Número de seguidores
152
Documentos
9862
Última venta
1 hora hace

Here you will find different past papers with correct and updated solutions .Please do not forget to leave a review after purchasing any document .Goodluck and success in advance.

3.3

60 reseñas

5
20
4
11
3
9
2
5
1
15

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes