PMP Exam Prep - Communications Management CORRECT 100%

Puntuación
-
Vendido
-
Páginas
12
Grado
A+
Subido en
07-10-2024
Escrito en
2024/2025

What is especially important when the project manager is working with virtual team leads? - Regulating nonverbal communications to maintain cross-cultural respect - Asking for acknowledgment to ensure that the message was understood as intended - Getting feedback to ensure that the intended message is being received - Using an appropriate level of formality for these horizontal communications - ANSWER Getting feedback to ensure that the intended message is being received What is an enterprise environmental factor (EEF) that could affect whether a project can take advantage of a system to produce automated transcripts of virtual meetings? - Whether meetings are scheduled or impromptu

Mostrar más Leer menos
Institución
PMP
Grado
PMP









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PMP
Grado
PMP

Información del documento

Subido en
7 de octubre de 2024
Número de páginas
12
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PMP Exam Prep - Communications
Management CORRECT 100%

What is especially important when the project manager is working with virtual team leads?

- Regulating nonverbal communications to maintain cross-cultural respect

- Asking for acknowledgment to ensure that the message was understood as intended

- Getting feedback to ensure that the intended message is being received

- Using an appropriate level of formality for these horizontal communications - ANSWER Getting
feedback to ensure that the intended message is being received



What is an enterprise environmental factor (EEF) that could affect whether a project can take advantage
of a system to produce automated transcripts of virtual meetings?

- Whether meetings are scheduled or impromptu

- Required meeting minutes format

- Meeting record keeping policy

- Languages spoken - ANSWER Languages spoken



When a team member responsible for an activity reiterates what needs to be done and there is an
obvious flaw in his or her understanding, what is a likely result if the receiver corrects this error?

- The flaw will be resolved without schedule risk or residual risk.

- The flaw will be resolved without schedule risk, but residual risk remains unless there is another round
of communications.

- Correcting the flaw will impact the schedule and create residual risk.

- Correcting the flaw will impact the schedule, but there will be no residual risk since the
communications were successful. - ANSWER The flaw will be resolved without schedule risk, but residual
risk remains unless there is another round of communications.



What is an example of an enterprise environmental factor (EEF) that might be used as an input to the
Plan Communications Management process?

- Communication methods

, - Communication models

- Communication technology rates

- Lessons learned about communication - ANSWER Communication technology rates



What might prevent a project manager from fully adopting a new conversation thread tracking system to
replace e-mails?

- Unlike e-mail, the system would create too many communication channels.

- IT requires that all project communications be documented and traceable.

- The medium isn't formal enough for certain communications.

- A key stakeholder didn't make it through the training for the system. - ANSWER A key stakeholder didn't
make it through the training for the system.



What is the most important communication dimension for a project manager when handling conflict
resolution with a customer who thought a team lead was rude?

- Horizontal

- Formal

- Official

- External - ANSWER Formal



What is an example of noise in a communication?

- Expert using technical jargon

- Receiver indicating that the message was received without indicating understanding

- Sender having to repeat a message in a different manner

- New video chat technology - ANSWER Expert using technical jargon



A project is complex, and team roles vary considerably. Some team members have complained during
their project performance appraisals that they missed a key metric because the team reports were too
detailed. What can the project manager provide to resolve this situation?

- Dashboards

- Graphics and visual aids to existing reports
$10.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Lecchris West Virgina University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
40
Miembro desde
2 año
Número de seguidores
15
Documentos
3203
Última venta
1 mes hace
LECCHRIS

3.8

6 reseñas

5
2
4
1
3
3
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes