Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 6 páginas
Examen

NCCCO Lattice Boom General Knowledge Exam Latest 2024 Update

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

NCCCO Lattice Boom General Knowledge Exam Latest 2024 Update The lattice boom is designed to take winds of up to 20 mph. from the side plus a full rated load, plus a direct side load equal to what percent of the rated load? - ANSWER2% The part of the load chart governed by stability is based on what percentage of capacity while a crawler crane is working over the side quadrant? - ANSWERA. 75% The most unstable working quadrant for a crawler crane is the; - ANSWERSide What type of capacity is listed on a crane load chart? - ANSWERStatic If the manufacture of a particular crane does not specifically permit pick and carry operations what procedure must be followed during this operation? - ANSWERDon't make any pick and carry lifts What is the main purpose of a jib/extension? - ANSWERTo extend reach higher or up and over When the number of layers of rope on a drum increase the line pull___________. - ANSWERDecreases When handling boom sections, the best place for slings to be attached is; - ANSWERAt the pin connections at the ends of the top chords Placing timber blocking under the tips of the tracks on a crawler crane will; - ANSWERMake the crane more stable What is the major effect of stopping suddenly a rapid swing while operating long boom crane? - ANSWERAction may cause the crane boom collapse and/or overturn the crane According to B30.10 hooks shall be removed from service when the throat opening exceeds _____ the original throat opening. - ANSWER5% On a crawler crane ground bearing pressure is greatest where? - ANSWEROver the corner During disassembly of a long boom, the pendant lines are connected at the maximum cantilever point and the boom is slightly lifted off the ground, which boom connection pins are to be removed next? - ANSWERThe bottom pins ahead of the cantilever point Most crane manufactures require the load chart capacities must be reduced when wind speed reaches; - ANSWER20 mph The definition of cantilever of a lattice boom crane is; - ANSWERThe boom suspended past the pendant connections What chart do you use when operating a crane on a barge; - ANSWERList chart According to OSHA, Jibs must have a positive ________ from backwards overturning - ANSWERStop Mobile cranes on barges shall be - ANSWERPhysically attached to the barge When a crane is properly barricaded, what is the clearance required all the way around 360 degrees between the superstructure and the barricade when swung 360 degrees? - ANSWER2 feet

Vista previa del contenido

NCCCO Lattice Boom General Knowledge Exam Latest
2024 Update

The lattice boom is designed to take winds of up to 20 mph. from the side plus a full
rated load, plus a direct side load equal to what percent of the rated load? -
ANSWER>>2%


The part of the load chart governed by stability is based on what percentage of capacity
while a crawler crane is working over the side quadrant? - ANSWER>>A. 75%


The most unstable working quadrant for a crawler crane is the; - ANSWER>>Side


What type of capacity is listed on a crane load chart? - ANSWER>>Static


If the manufacture of a particular crane does not specifically permit pick and carry
operations what procedure must be followed during this operation? - ANSWER>>Don't
make any pick and carry lifts


What is the main purpose of a jib/extension? - ANSWER>>To extend reach higher or up
and over


When the number of layers of rope on a drum increase the line pull___________. -
ANSWER>>Decreases


When handling boom sections, the best place for slings to be attached is; -
ANSWER>>At the pin connections at the ends of the top chords


Placing timber blocking under the tips of the tracks on a crawler crane will; -
ANSWER>>Make the crane more stable

, What is the major effect of stopping suddenly a rapid swing while operating long boom
crane? - ANSWER>>Action may cause the crane boom collapse and/or overturn the
crane


According to B30.10 hooks shall be removed from service when the throat opening
exceeds _____ the original throat opening. - ANSWER>>5%


On a crawler crane ground bearing pressure is greatest where? - ANSWER>>Over the
corner


During disassembly of a long boom, the pendant lines are connected at the maximum
cantilever point and the boom is slightly lifted off the ground, which boom connection
pins are to be removed next? - ANSWER>>The bottom pins ahead of the cantilever
point


Most crane manufactures require the load chart capacities must be reduced when
wind speed reaches; - ANSWER>>20 mph


The definition of cantilever of a lattice boom crane is; - ANSWER>>The boom
suspended past the pendant connections


What chart do you use when operating a crane on a barge; - ANSWER>>List chart


According to OSHA, Jibs must have a positive ________ from backwards overturning -
ANSWER>>Stop


Mobile cranes on barges shall be - ANSWER>>Physically attached to the barge


When a crane is properly barricaded, what is the clearance required all the way
around 360 degrees between the superstructure and the barricade when swung 360
degrees? - ANSWER>>2 feet

Información del documento

Subido en
27 de septiembre de 2024
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$14.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
QueenElsa
4.9
(61)
Vendido
82
Seguidores
36
Artículos
1013
Última venta
4 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes