ACI Test | Questions and Correct Answers | Latest Update 2024/2025
ACI Test | Questions and Correct Answers | Latest Update 2024/2025 The total time allowed between obtaining the first and final portions of a composite sample is - Answer -15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - Answer -F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - Answer -5 minutes Begin molding test specimens within ______ minutes after obtaining the composite sample - Answer -15 minutes The concrete samples should be protected from - Answer -the sun, wind, and other sources of rapid evaporation, from contamination When test specimens are to be molded, the minimum size of sample obtained is - Answer -28 L (1 ft^3) The primary objective of the sampling process is to obtain a representative sample (T or F) - Answer -TWhen sampling from a revolving drum truck mixer collect concrete from ______ portions of the batch - Answer -2 or more Wet sieving is performed - Answer -when the concrete contains aggregates larger than appropriate for a test When sampling from a paving mixer it is not acceptable to place 3 smal
Escuela, estudio y materia
- Institución
- Aci concrete
- Grado
- Aci concrete
Información del documento
- Subido en
- 26 de septiembre de 2024
- Número de páginas
- 10
- Escrito en
- 2024/2025
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
aci test 2024
-
aci test 2025
-
the total time allowed between obtaining the first
Documento también disponible en un lote