NCCCO Mobile Crane-2024 Actual Exam: 100 Questions and Correct Detailed Answers | Already Graded A - Latest" refers to a comprehensive study guide designed for individuals preparing for the NCCCO (National Commission for the Certification of Crane Operators) Mobile Crane certification exam in 2024. This guide includes 100 actual exam questions along with correct and detailed explanations for each answer, ensuring a thorough understanding of the material. It has been pre-graded with an "A" rating, highlighting its accuracy and reliability, and is up-to-date with the latest exam standards and content. Ideal for exam readiness and success.

Vista previa del contenido

NCCCO Mobile Crane Exam.




NCCCO Mobile Crane Exam.
1. What action does a signal person intend the operator to perform if he extends his arm at
shoulder height, makes a fist with his hand, and sticks his/her thumb up?

o a) Boom down

o b) Swing

o c) Boom up

o d) Extend boom

o Answer: c) Boom up

2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in
order for the gross ratings in the load chart to remain valid?

o a) 1%

o b) 2%

o c) 5%

o d) 8%

o Answer: a) 1%

3. The load line of the crane you’re operating contacts an energized power line. There’s no sign
of any other danger, such as fire. What should you do?

o a) Climb down carefully from the crane cab

o b) Jump down, feet together

o c) Stay in the cab until the lines are de-energized

o d) Get as far away from the crane as possible

o Answer: c) Stay in the cab until the lines are de-energized

4. According to OSHA 1926.1413, how many randomly distributed broken wires in rotation-
resistant rope are cause for replacement of the rope?

o a) 1 broken wire in 6 rope diameters

o b) 2 broken wires in 30 rope diameters

o c) 3 broken wires in one strand in one lay

, NCCCO Mobile Crane Exam.




o d) 2 broken wires in 6 rope diameters

o Answer: d) 2 broken wires in 6 rope diameters

5. What is the net capacity of a crane on main boom unless the manufacturer states otherwise?

o a) The capacity listed in the load chart minus the weight of the rigging and all
attachments

o b) The capacity listed in the load chart plus the weight of the rigging and all attachments

o c) The capacity listed in the load chart minus the weight of the rigging and all
attachments not in use

o d) The capacity listed in the load chart minus the weight of the rigging alone

o Answer: a) The capacity listed in the load chart minus the weight of the rigging and all
attachments

6. What is the primary purpose of a load moment indicator (LMI) on a mobile crane?

o a) To measure the wind speed

o b) To indicate the angle of the boom

o c) To prevent the crane from tipping by monitoring the load moment

o d) To measure the length of the boom

o Answer: c) To prevent the crane from tipping by monitoring the load moment

7. Which of the following is NOT a factor in determining the load capacity of a mobile crane?

o a) Boom length

o b) Load radius

o c) Wind speed

o d) Operator’s experience

o Answer: d) Operator’s experience

8. What should be done if a crane’s load chart is missing or illegible?

o a) Operate the crane using estimated capacities

o b) Use a similar crane’s load chart

o c) Do not operate the crane until a proper load chart is available

o d) Operate the crane at half capacity

o Answer: c) Do not operate the crane until a proper load chart is available

9. What is the purpose of the anti-two block device on a crane?

, NCCCO Mobile Crane Exam.




o a) To prevent the boom from extending too far

o b) To prevent the hook block from contacting the boom tip

o c) To measure the load weight

o d) To stabilize the crane during operation

o Answer: b) To prevent the hook block from contacting the boom tip

10. When setting up a crane, what is the minimum distance that must be maintained from power
lines up to 50 kV?

o a) 10 feet

o b) 15 feet

o c) 20 feet

o d) 25 feet

o Answer: a) 10 feet

11. What is the maximum allowable wind speed for lifting operations with most mobile cranes?

o a) 10 mph

o b) 20 mph

o c) 30 mph

o d) 40 mph

o Answer: b) 20 mph

12. Which of the following is a critical lift?

o a) A lift that exceeds 75% of the crane’s rated capacity

o b) A lift that involves multiple cranes

o c) A lift over occupied buildings

o d) All of the above

o Answer: d) All of the above

13. What should an operator do if the crane’s boom starts to oscillate during a lift?

o a) Increase the boom angle

o b) Lower the load slowly

o c) Swing the boom to stabilize it

o d) Stop all crane movements immediately

Información del documento

Subido en
25 de septiembre de 2024
Número de páginas
19
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$20.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
StudySets
5.0
(1)
Vendido
8
Seguidores
1
Artículos
409
Última venta
5 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes