100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Caso

financial risk management

Puntuación
-
Vendido
-
Páginas
3
Subido en
21-09-2024
Escrito en
2024/2025

financial risk management

Institución
Grado








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Desconocido
Grado

Información del documento

Subido en
21 de septiembre de 2024
Número de páginas
3
Escrito en
2024/2025
Tipo
Caso
Profesor(es)
Desconocido
Grado
Desconocido

Temas

Vista previa del contenido

MANG 6020 Financial Risk Management
Seminar 5
Question 1
Explain the difference between value at risk and expected shortfall.
Solution:
Value at risk is the loss that is expected to be exceeded (100 – X)% of the time in N days for
specified parameter values, X and N . Expected shortfall is the expected loss conditional that
the loss is greater than the Value at Risk.


Question 2
Explain the historical simulation method for calculating VaR.
Solution:
The historical simulation method involves constructing N scenarios of what might happen
between today and tomorrow from N days of historical data. The first scenario assumes that the
percentage change in all market variables will be the same as that between the first day (Day 0)
and the second day (Day 1); the second scenario assumes that the percentage change in all
market variables will be the same as that between the second day (Day 1) and the third day (Day
2); and so on. The final scenario assumes that the percentage change in all market variables will
be the same as that between yesterday (Day N - 1) and today (Day N ). The portfolio is valued
for each scenario and VaR is calculated from the probability distribution of portfolio value -




changes. scenario pro , profit aim 376%
2×290×9*8 = O 412%
; ?m%%
aw%
.




°

4%xa% to
-




86×27×2 awk -
" gagaqif -
88.48 2

Question 3 0.367
.xr% 0.04% -2
coal
if
. 1

Suppose that each of two investments has a 4% chance of a loss of $10 million, a 2% chance of a
loss of $1 million, and a 94% chance of a profit of $1 million. They are independent of each
other.
(a) What is the VaR for one of the investments when the confidence level is 95%? A
(b) What is the expected shortfall (ES) when the confidence level is 95%?
(c) What is the VaR for a portfolio consisting of the two investments when the confidence level is
95%?
(d) What is the expected shortfall for a portfolio consisting of the two investments when the
confidence level is 95%?
(e) Show that, in this example, VaR does not satisfy the subadditivity condition whereas expected
shortfall does. cumulative PM → ⑨ vape ,
.




+
cat .




profit carillon, probe
o.GE#cb7ES=SoofXl0t2ofoX1
-
to

-
l
44% T
w,
= 8+0.2=8.2 LES)


goof
-
I
-11
$4.40
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
1097434525U

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
1097434525U hoacf
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
1 año
Número de seguidores
0
Documentos
31
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes