Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 14 páginas
Examen

Construction Jobsite Management 4th Edition By William R. Mincks; Hal Johnston Solutions Manual

Document preview thumbnail
Vista previa 2 fuera de 14 páginas

Construction Jobsite Management 4th Edition By William R. Mincks; Hal Johnston Solutions Manual

Vista previa del contenido

Construction Jobsite Management 4th Edition By
William R. Mincks; Hal Johnston Solutions Manual

Definable tasks that support the goals of a particular project, typically include
completion in a time frame, at a level of quality, with cost control, customer
satisfaction, safety, and effective management of subs: - ANSWER: Objectives

Ch. 1 Intro to Project Management pg. 4

Construction Jobsite Management

A key indicator of the productivity of a project and the effectiveness of project
management: - ANSWER: Cost Control

Ch. 1 Intro to Project Management pg. 5

Construction Jobsite Management

Which of the following is not a typical objective for a successful, profitable project? -
ANSWER: Break Even Bidding

Ch. 1 Intro to Project Management pg. 5

Construction Jobsite Management

The project management team typically includes all of the following except: -
ANSWER: Delivery Driver

Ch. 1 Intro to Project Management pg. 6

Construction Jobsite Management

What action should be taken by the project manager when a subcontractor submits
a field question regarding a conflict found in the project specifications? - ANSWER:
Analyze the impact of the conflict

Ch. 1 Intro to Project Management pg. 8

Construction Jobsite Management

Costs information is derived from all of the following except: - ANSWER: Dynamic
Cost

Ch. 1 Intro to Project Management pg. 9

, Construction Jobsite Management

What should a budget be based on? - ANSWER: The estimate

Ch. 1 Intro to Project Management pg. 9

Construction Jobsite Management

Which of the following is not considered an important technique in project
management? - ANSWER: Licensure

Ch. 1 Intro to Project Management pg. 11

Construction Jobsite Management

A matrix of organization, with formal and informal contractual relationships between
participants of a construction project is called: - ANSWER: Project Delivery System

ch. 2 The Project Team pg. 14

Construction Jobsite Management

A traditional contract delivery system consists of which parties? - ANSWER: The
owner, the contractor and the architect

ch. 2 The Project Team pg. 15

Construction Jobsite Management

Basic delivery systems options for a construction project include all of the following
except: - ANSWER: CQM

ch. 2 The Project Team pg. 15

Construction Jobsite Management

Cash flow projections should relate the schedule of values to the? - ANSWER:
Construction schedule

ch. 2 The Project Team pg. 20

Construction Jobsite Management

Who does the Project Engineer usually report directly to on the job-site? - ANSWER:
The project manager

ch. 2 The Project Team pg. 26

Libro relacionado
 image
Frederick E. Gould, Nancy Eleanor Joyce Construction Project Management
Edición: 2011 ISBN: 9780132766876 Edición: Desconocido

Información del documento

Subido en
14 de septiembre de 2024
Número de páginas
14
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
3
Seguidores
0
Artículos
1282
Última venta
10 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes