100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

PROGRESSION CONSTRUCTION COORDINATOR II - III 2024 ACTUAL EXAM COMPLETE 110 QUESTIONS AND CORRECT DETAILED ANSWERS 100% CORRECT

Puntuación
-
Vendido
-
Páginas
53
Grado
A+
Subido en
11-09-2024
Escrito en
2024/2025

The NESC National Electrical Safety Code requires drop cables to be placed at what minimum depth? 6 inches. 12 inches. 22 inches. 18 inches. - CORRECT ANSWER ️ 18 inches. When troubleshooting RFoGRadio frequency over glass and PONPassive optical network FTTx systems that use longer wavelengths, what is the common cause of higher losses that should be addressed?

Mostrar más Leer menos
Institución
PROGRESSION CONSTRUCTION COORDINATOR II - III
Grado
PROGRESSION CONSTRUCTION COORDINATOR II - III











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
PROGRESSION CONSTRUCTION COORDINATOR II - III
Grado
PROGRESSION CONSTRUCTION COORDINATOR II - III

Información del documento

Subido en
11 de septiembre de 2024
Número de páginas
53
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PROGRESSION CONSTRUCTION
COORDINATOR II - III 2024 ACTUAL EXAM
COMPLETE 110 QUESTIONS AND CORRECT
DETAILED ANSWERS 100% CORRECT How
should the buffer tubes be secured in the closu

The NESC National Electrical Safety Code requires drop
cables to be placed at what minimum depth?

6 inches.
12 inches.
22 inches.
18 inches. - CORRECT ANSWER ✔️ 18 inches.

When troubleshooting RFoGRadio frequency over glass
and PONPassive optical network FTTx systems that use
longer wavelengths, what is the common cause of higher
losses that should be addressed?

Intermixing multimode and single-mode jumpers.
The reflectivity of optical attenuators.
Transmitter fiber allocations.
Macrobends and microbends are caused by improper
bending and pinching of cables and patch cords. -
CORRECT ANSWER ✔️ Macrobends and microbends

,are caused by improper bending and pinching of cables
and patch cords.

Who is responsible for compiling the physical document of
the restoration plan?

External contractors hired for restoration work.
An identifiable position or group within an organization.
Any available employee in the organization.
Customers or users of the network. - CORRECT
ANSWER ✔️ An identifiable position or group within an
organization.

What can happen inside fiber-optic equipment room
facilities?

Failures can typically arise at patch panels, in
optoelectronic systems, and due to installation practices.
Card failure and too much or too little optical power are
rarely the causes of total or intermittent failure.
Excessive failure rates on all transmitter and receiver
cards should be ignored and only addressed by a field
technician.
Installation-related failure occurs exclusively in electronics
shelves and nodes and has little to do with craftsmanship
issues. - CORRECT ANSWER ✔️ Failures can typically

,arise at patch panels, in optoelectronic systems, and due
to installation practices.

How is a restoration posture for a fiber network
developed?

All personnel must complete industry-accepted fiber-optic
training before any restoration planning can begin.
First, developing an emergency restoration plan and then
having each organization review its resources.
Creating fiber assignments where all are identified
generically and can be restored in the most accessible
order rather than by any prioritizing scheme.
Including the resources required to respond to a significant
system outage, such as documentation, technical skills,
and essential troubleshooting and repair equipment and
materials. - CORRECT ANSWER ✔️ Including the
resources required to respond to a significant system
outage, such as documentation, technical skills, and
essential troubleshooting and repair equipment and
materials.

What is the best way to structure a flowchart of basic
restoration activities?

Ensure the permanent repair always precedes the
troubleshooting step.

, Allow each organization to create a flow diagram to be
included in the restoration plan.
Make a detailed list of all the equipment and required
materials.
Diagram the events following an actual fiber interruption. -
CORRECT ANSWER ✔️ Diagram the events following an
actual fiber interruption.

What is true when establishing a timing sequence or
communication flow for a restoration flow chart?

The purpose of sequence time planning is to increase the
overall restoration time.
Restoration sequence time charts are initially based on a
vast amount of data.
One person from one department should expand on some
essential activity blocks or groups of blocks.
As experience in emergency restoration deployment is
gained through actual deployments or rehearsals, the
sequence time chart becomes more detailed and realistic.
- CORRECT ANSWER ✔️ As experience in emergency
restoration deployment is gained through actual
deployments or rehearsals, the sequence time chart
becomes more detailed and realistic.

After identifying the basic restoration activities, what is the
next helpful restoration planning component?
$25.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tevstudy234 Chamberlian School of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
9
Miembro desde
2 año
Número de seguidores
6
Documentos
768
Última venta
3 meses hace
TELVIN

The place to find the best study materials for various subjects. You can be assured that you will receive only the best which will help you to ace your exams. All the materials posted are A+ Graded. Please rate and write a review after using my materials. Your reviews will motivate me to add more materials. Thank you very much!

3.0

3 reseñas

5
0
4
2
3
0
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes