EBOLC Project Management exam questions and answers

Institución
EBOLC
Grado
EBOLC









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
EBOLC
Grado
EBOLC

Información del documento

Subido en
8 de septiembre de 2024
Número de páginas
7
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

EBOLC Project Management
exam questions and answers
Activity Estimate Worksheet - answer a planning tool for developing
an estimate of material, manpower, equipment and time required to
complete a specific activity within a logic network of construction
tasks


Bill of Materials (BOM) - answer comprehensive list of materials,
stock numbers, and prices required to complete the full scope of an
assigned construction mission


Construction Directive - answer Formal notification to initiate
planning and execution of a construction mission. Generated at the
battalion level or higher, the directive defines the location and
scope of work, establishes specific milestones, and sets the
project's Estimated Start Date (ESD) and Estimated Completion Date
(ECD)


Construction Mission File - answer A complete historical record of a
project from inception to completion. The file will include the
original construction directive with all amendments and extensions,
construction briefs and the OPORD, inspection reports, AARs, plans,
specifications, the BOM, Construction Reports, the CPM, CWE, CWS,
all related correspondence, photographic documentation, and the
acceptance letter.


Construction Work Schedule (CWS) - answer a chart that depicts the
activities generated for the CPM in calendar form, showing early
start and late start times, and float


Critical Path Method (CPM) - answer Involves determining the
longest path through the network diagram, the earliest and latest

, an activity can start, and the earliest and latest activities can be
completed


Gantt Chart - answer a project management tool that depicts project
activities, their assigned resources, start and end dates, durations,
and interdependencies.


Letter of Acceptance - answer A letter that serves as official closure
and completion of the project, stating that the constructing unit has
met the requirements and expectations of the customer. The letter
includes multiple signature blocks for all parties involved (the
constructing unit, S3 Construction, and the customer)


Logic Network - answer Commonly referred to as a network
diagram, it is the representation of project activities in an array of
parallelograms with lines drawn to show their interdependencies
without a time scale. Is used to analyze the critical path(s) in a
project (CPM)


Pre-Construction Brief (PCB) - answer final brief delivered to the
battalion commander prior to execution of the construction mission.
The brief is usually delivered by the project OIC, and represents the
culmination of all planning and coordination necessary prior to
executing the mission.


Pre-Construction Conference (PCC) - answer A conference designed
to provide a final review of the project management plan to execute
the construction by the constructing unit. The conference should
have all stakeholders present to resolve any problems prior to the
start of the construction mission and should be conducted at a
minimum of 21 days prior to project execution.


In Progress Review (IPR) - answer A meeting held at regular and
appropriate intervals (will vary based upon mission requirements).
This meeting is to ensure all stakeholders are current and up to
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Reseñas de compradores verificados

Se muestran los comentarios
10 meses hace

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
FREEMANSHARP Havard School
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
140
Miembro desde
2 año
Número de seguidores
70
Documentos
7649
Última venta
1 mes hace
FREEMANSHARP

In this page you will find all exams , flashcards , quizzes and package deals offered by seller Freemansharp

3.5

28 reseñas

5
8
4
7
3
7
2
3
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes