Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version

Document preview thumbnail
Vista previa 2 fuera de 6 páginas

Information Technology Project Management 9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13, Complete Newest Version

Vista previa del contenido

TEST BANK For Information Technology Project Management
9th Edition by Kathy Schwalbe, Verified Chapters 1 - 13,
Complete Newest Version
activity - ANSWER:an element of work normally found on the WBS that has an
expected duration, cost, and resource requirements; also called a task

activity attributes - ANSWER:information about each activity, such as predecessors,
successors, logical relationships, leads and lags, resource requirements, constraints,
imposed dates, and assumptions related to the activity

activity list - ANSWER:a tabulation of activities to be included on a project schedule

activity-on-arrow (AOA) - ANSWER:a network diagramming technique in which
activities are represented by arrows and connected at points called nodes to
illustrate the sequence of activities; also called arrow diagramming method (ADM)

arrow diagramming method (ADM) - ANSWER:a network diagramming technique in
which activities are represented by arrows and connected at points called nodes to
illustrate the sequence of activities; also called activity-on-arrow (AOA)

backward pass - ANSWER:a project network diagramming technique that determines
the late start and late finish dates for each activity

baseline dates - ANSWER:the planned schedule dates for activities in a Tracking
Gantt chart

buffer - ANSWER:additional time to complete a task; a buffer is added to an estimate
to account for various factors

burst - ANSWER:a single node followed by two or more activities on a network
diagram

crashing - ANSWER:a technique for making cost and schedule trade-offs to obtain
the greatest amount of schedule compression for the least incremental cost

critical chain scheduling - ANSWER:a method of scheduling that takes limited
resources into account when creating a project schedule and includes buffers to
protect the project completion date

critical path method (CPM) or critical path analysis - ANSWER:a project network
diagramming technique used to predict total project duration

dependency - ANSWER:the sequencing of project activities or tasks; also called a
relationship

, discretionary dependencies - ANSWER:the sequencing of project activities or tasks
defined by the project team and used with care because they may limit later
scheduling options

dummy activities - ANSWER:activities with no duration and no resources used to
show a logical relationship between two activities in the arrow diagramming method
of project network diagrams

duration - ANSWER:the actual amount of time worked on an activity plus elapsed
time

early finish date - ANSWER:the earliest possible time an activity can finish based on
the project network logic

early start date - ANSWER:the earliest possible time an activity can start based on
the project network logic

effort - ANSWER:the number of workdays or work hours required to complete a task

external dependencies - ANSWER:the sequencing of project activities or tasks that
involve relationships between project and non-project activities

fast tracking - ANSWER:a schedule compression technique in which you do activities
in parallel that you would normally do in sequence

feeding buffers - ANSWER:time added before tasks on the critical chain if they are
preceded by other tasks that are not on the critical path

finish-to-finish dependency - ANSWER:a relationship on a project network diagram in
which the "from" activity must be finished before the "to" activity can be finished

finish-to-start dependency - ANSWER:a relationship on a project network diagram in
which the "from" activity must be finished before the "to" activity can be started

float - ANSWER:the amount of time a project activity may be delayed without
delaying a succeeding activity or the project finish date; also called slack

forward pass - ANSWER:a network diagramming technique that determines the early
start and early finish dates for each activity

free slack (free float) - ANSWER:the amount of time an activity can be delayed
without delaying the early start of any immediately following activities

late finish date - ANSWER:the latest possible time an activity can be completed
without delaying the project finish date

Libro relacionado
 image
Edición: 2006 ISBN: 9780619215286 Edición: Desconocido

Información del documento

Subido en
7 de septiembre de 2024
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
3
Seguidores
0
Artículos
1282
Última venta
10 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes