Examen

Project Management in Practice, 7th Edition by Jack R. Meredith, Verified Chapters 1 - 8, Complete Newest Version

Document preview thumbnail
Vista previa 2 fuera de 5 páginas

Project Management in Practice, 7th Edition by Jack R. Meredith, Verified Chapters 1 - 8, Complete Newest Version

Vista previa del contenido

TEST BANK For Project Management in Practice, 7th Edition by
Jack R. Meredith, Verified Chapters 1 - 8, Complete Newest
Version
In the _____________ stage of the project life cycle project the product is delivered
to the customer and resources are reassigned. - ANSWER: closing

Which structure would be most appropriate for developing a new, highly innovative
product that has strict time constraints? - ANSWER: Dedicated project team

_________ organization is a hybrid form in which a horizontal project management
structure is "overlaid" in the normal functional hierarchy. - ANSWER: Matrix

Regardless of the criteria differences among different types of projects, the most
important criterion for project selection is - ANSWER: The projects fit for
organizational strategy

Which of the following is NOT one of the requirements for successful
implementation of strategies through projects?

A. Allocation of resources
B. Prioritizing of projects
C. Motivation of project contributor
D. Adequate planning and control systems - ANSWER: ALL OF THESE

Which of the following terms is often used to denote a project that a powerful, high-
ranking official is advocating? - ANSWER: Sacred Cow

The assessment of the external and internal environments is called _______ analysis
- ANSWER: SWOT analysis

Which of the following would be classified as an organizational threat? - ANSWER:
Slowing of the economy

Which dimension of project management centers on creating a temporary social
system within a larger organizational environment that combines the talents of a
divergent set of professionals working to complete the project? - ANSWER:
Sociocultural

What are characteristics of effective objectives? - ANSWER: Specifc Measurable
Achievable Realistic Time-Bound (SMART)

Project Management is ideally suited for a business environment that has all of the
following except?

, A) Accountability
B) Flexibility
C) Innovation
D) Speed
E) Repeatability - ANSWER: Repeatability

Which are the three different matrix systems? - ANSWER: Weak, Strong, Balanced

What are problems associated with the absence of a project portfolio system? -
ANSWER: Organizational politics, Resource conflicts, Multitasking, Implementation
gap

What are technical and social dimensions of project management? - ANSWER:
Technical Dimensions= Scope, WBS, Schedules, Resource allocation, baseline
budgets, status reports

Finacial criteria - ANSWER: Financial criteria is the preferred method to evaluate
projects. These models are appropriate when there is a high level of confidence
associated with the estimates of future cash glows. The two models are payback and
net present value (NPV)

Non financial Criteria - ANSWER: Companies have to be disciplined in saying no to
potentially profitable projects that are outside the realm of their core mission. This
requires other criteria be considered beyond direct financial return.

The structure that manages projects within the existing organizational structure is
__________ organization - ANSWER: Functional

What combinations represent the extremes of project organization? - ANSWER:
Functional and project organizations

What organization structure is the balance of authority strongly in favor of the
functional managers? - ANSWER: Weak Matrix

Which is NOT a driving force behind the increasing demand for project
management?

A. Compression of the product life cycle
B. Knowledge explosion
C. Increasing need for multi-project management
D. More sustainable business practices
E. Declining need for product management - ANSWER: E. Declining need for product
management

A project team that operates with a full-time project manager as a separate unit
from the rest of the organization is structured using ________ organization -
ANSWER: Projectized

Libro relacionado
 image
Jack R. Meredith, Scott M. Shafer, Samuel J. Mantel, Jr., Margaret M. Sutton Project Management in Practice
Edición: 2020 ISBN: 9781119702962 Edición: Desconocido

Información del documento

Subido en
6 de septiembre de 2024
Número de páginas
5
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas
$18.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
3
Seguidores
0
Artículos
1282
Última venta
10 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes