EXAM 120 QUESTIONS AND CORRECT DETAILED
ANSWERS WITH RATIONALES|ALREADY
GRADED A
Terms in this set (113)
Why do Lean-Agile Leaders To align around value
try to connect the silos of
business, system
engineering, hardware,
software, test, and quality
assurance?
Which statement describes Establish a work environment of shared responsibility
one element of the CALMR
approach to DevOps?
Which statement is true Lower limits improve flow [4-5]
about Work-In-Process
(WIP) limits?
What replaces detailed User Stories
requirements documents?
Which two statements Single voice for customer and stakeholders, and to own
describe the responsibilities and manage team backlog [2-15, 2-17]
of the Product Owner?
(Choose two.)
implementing quality in Culture
Lean-Agile environment
What is an example of a Scrum of Scrums
Program event?
, What is the goal of the Value [1-28]
SAFe House of Lean
model?
Which responsibility To sequence backlog items to program priorities, events,
belongs to the Product and dependencies
Owner in the team?
Which two views does the How the team is doing in the Program Increment, and
Iteration Review provide how the team did on the iteration (sprint) [4-38]
into the Program? (Choose
two.)
What is an example of a ...5, 8, 13, 20, 40...
modified Fibonacci
sequence?
What is the benefit of Allows Agile teams to do "Dark" launches, or untested
separating release elements Features [4-26]
from the Solution?
The Agile Release Train The Program Backlog [2-21]
aligns teams to a common
mission using a single Vision
and what else?
The "3 Cs" is a popular Card (WIT, Feature, User Story), Conversation
guideline for writing user (Acceptance Criteria), and Confirmation (Acceptance)
stories. What does each of [3-10]
the three C's represent?
(Choose three.)
What is the role of the To guide the teams and support the Architectural
System Architect/Engineer? Runway [2-21]
What is typically included in Stories are accepted by the Product Owner [4-37]
the Definition of Done for
the team increment?
The Inspect and Adapt The PI System Demo [5-38]
event always starts with
which activity?