100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CM250 Exam 2 Questions with Verified Solutions.

Puntuación
-
Vendido
-
Páginas
6
Grado
A+
Subido en
31-08-2024
Escrito en
2024/2025

CM250 Exam 2 Questions with Verified Solutions.CM250 Exam 2 Questions with Verified Solutions.CM250 Exam 2 Questions with Verified Solutions.

Institución
CM250
Grado
CM250









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CM250
Grado
CM250

Información del documento

Subido en
31 de agosto de 2024
Número de páginas
6
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CM250 Exam 2 Questions with Verified Solutions.
To determine the fleet size (number of haulers) for the project, one of two deterministic
models are used. What are the two models? - Correct Answer rational and queues

The CQM process provides full documentation of the materials incorporated into the
work, work performed, and tests results of work in place. - Correct Answer True

Within the federal CQM (construction quality management) program, who has the
responsibility for quality control? - Correct Answer Builder

Which party in the traditional construction process has primary responsibility for quality
control? - Correct Answer?

Quality assurance focuses on - Correct Answer Providing confidence that specific
quality requirements can and will be satisfied

Quality control focuses on ______. - Correct Answer Meeting the specific quality
requirements required in the contract documents

What is the required level tolerance specified by most manufactures for setting a crane?
- Correct Answer 1%

You are setting a rooftop air handler. The top of the roof parapet is 60-ft above the finish
grade that the crane is sitting on. The rigging from the end of the boom is 5 ft. from the
end of the boom and includes the hook. The air handler and the slings to lift it are 10 ft.
high. The minimum distance from the building that you can set the crane is 45 ft. The air
handler is to be set 40 ft. from the edge of the roof. What minimum (calculated) length of
boom will you need, and how far from the building will you set the crane? - Correct
Answer 142 ft. and 60 ft.?

If the projected lift exceeds 75% of the crane's rated capacity, or if there are multiple
cranes used for a lift, it is considered a "critical lift". - Correct Answer True

What is the average time to erect and dismantle a 165 ft. tower crane? - Correct Answer
21 days

In selecting a crane, you need to consider the weight of the load (crane attachments,
wire rope, slings, and block), maximum radius of swing to lift the load, and the combined
height of the load, slings, block, and vertical lift. - Correct Answer True

, If you are willing to accept no more than a 20% chance of exceeding the design
capacity of the drainage culvert for your project, what rainfall intensity factor would...?
(Incomplete, graph question) - Correct Answer 1.18

Key principles to erosion control include _________. (Select all that apply) - Correct
Answer Minimize disturbed area and protect natural features and soil

Control of storm water flowing onto and through the project site

Protection of slopes

When must the application (notice of intent) be made for obtaining permit coverage for
the construction site? - Correct Answer No later than 14 days prior to the start of
construction?

What federal regulation governs the development of SWPPP? - Correct Answer NPDES

Solid materials handling objectives include ________. - Correct Answer Locate multiple
storage points to minimize travel distance from storage point to point of use

The principles of site layout enable you to plan "what goes where" on the site by simple
formulas so that you are more consistent and efficient in planning the locations for the
office trailers and materials laydown/storage. - Correct Answer False

There is more to logistics operations then procurement and handling of materials -
Correct Answer true

What makes construction projects different? (Select all correct) - Correct Answer Wide
variety of defined trades and closely supervised trade crews

Logistical matters: Materials, equipment, and location

From job to job, changing combinations of project team members among owner,
contractor, and owner's rep.

Changing geography: geology, climate, labor pool, legal requirements

It is extremely important that all temporary work sites have water, telephone, sewerage,
and electricity to operate efficiently. - Correct Answer true
$20.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Onlinexam Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
439
Miembro desde
5 año
Número de seguidores
351
Documentos
12902
Última venta
1 semana hace
Concrete study materials for exams,study guides,notes,summaries and study quizes.

Hello , I am very friendly and experienced tutor dedicated to my teaching work. If you need any kind of help then you can contact me with any questions about your course .I can help you with everything - tests, quizzes, exams, db threads and so on. Just ask me if you want to get an A on your courses. Anyway Welcome to Tutoring with Experience and Enthusiasm! I am thrilled to have the opportunity to help you with best study guides and assignments. Be prepared.

Lee mas Leer menos
4.3

77 reseñas

5
51
4
12
3
4
2
5
1
5

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes