100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

DBIA Test questions with correct answers.

Puntuación
-
Vendido
-
Páginas
13
Grado
A+
Subido en
30-08-2024
Escrito en
2024/2025

DBIA Test questions with correct answers.

Institución
DBIA
Grado
DBIA









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
DBIA
Grado
DBIA

Información del documento

Subido en
30 de agosto de 2024
Número de páginas
13
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

DBIA Test questions with correct
answers

Project |Delivery |System |- |ANSWERS✔✔How |team |members |are |organized, |establishes |when |parties |
engage, |determines |roles |of |parties, |and |determines |sequence |of |design, |procurement, |and |
construction |(db, |cmar, |dbb)



Procurement |Method |- |ANSWERS✔✔how |team |members |are |selected |(QBS, |best |value, |low |price, |
sole |source)



contracting |approach |- |ANSWERS✔✔how |team |members |are |paid |(fp, |gmp, |cost |reimbursement, |
target |price, |unit |price)



Design-Bid-Build |(DBB) |- |ANSWERS✔✔linear, |sequential |process, |A/E |selected |on |qualifications, |
GC |selected |on |low |price, |design |is |fully |completed |without |input |from |GC, |A/E |acting |in |owner's |
interests, |with |a |historically |strong |bond, |process |is |well-established |and |understood



construction |manager |at |risk |- |ANSWERS✔✔similar |org |structure |to |DBB, |construction |manager |
selected |by |QBS |or |best |value, |contractor |provides |precon |services, |negotiated |gmp |contracting |
approach, |open |book |estimating |process, |potential |to |fast |track |project, |construction |cost |determined |
before |design |completed, |potential |issues |over |what |is |reasonably |inferable |from |gmp |design |
documents



Design-Build |- |ANSWERS✔✔The |owner |contracts |with |one |entity |(a |person |or |firm) |to |provide |both |
design |and |construction |services, |designer |and |contractor |have |a |direct |contractual |relationship, |
selected |by |QBS |or |best |value, |wide |spectrum |of |contracting |approaches |and |organizational |
structures, |single |point |responsibility, |owner |does |not |manage |designer, |owner |exposure |to |claims |is |
significantly |reduced



engineer |procure |construct |(epc) |- |ANSWERS✔✔similar |to |design |build, |in |industrial |and |power |
generation |sectors, |systems |and |performance |testing |are |central |to |scope, |contractor |will |typically |
perform |engineering |with |its |in-house |staff, |owner |has |need |for |single |point |responsibility, |contracts |

, include |plant |and |process |performance |guarantees, |contract |items |include |performance |and |schedule
|liquidated |damages |and |limitations |of |liability




Multiple |Prime |Contracting |- |ANSWERS✔✔owner |contracts |with |multiple |trade |contractors, |
attributes |are |typically |similar |to |dbb, |owner's |ability |to |schedule |and |coordinate |the |work



Integrated |Project |Delivery |(IPD) |- |ANSWERS✔✔multi-party |agreement |- |all |parties |equal, |QBS |
procurement |and |target |pricing |contract |approach, |private |sector |use |(limited |at |this |time), |key: |
owner's |ability |to |accept |risk



public-private |partnership |(p3) |- |ANSWERS✔✔Instead |of |government |building |and |maintaining |
major |infrastructure |(such |as |highway, |water |treatment |plant), |build |and |maintenance |is |outsourced |
to |a |private |company. |Opposed |by |public |sector |unions. |this |is |not |considered |a |delivery |system |but |
its |underlying |approaches |are |delivery |systems |and |typically |use |DB. |multiple |procurement |and |
contracting |approaches



shift |left |- |ANSWERS✔✔intense |efforts |to |establish |scope |early |in |the |process; |drives |early |team |
formation |to |include |key |trade |subcontractors; |can |enable |big |decisions |to |be |made |early, |affect |
project |outcomes |at |lowest |cost, |establish |a |need |for |co-location |and |collaboration, |and |compress |
time |during |concurrent |design |and |construction



traditional |design |build |- |ANSWERS✔✔typically |two-phase |best |value |procurement |with |lump |sum |
contract; |owner |defines |project |requirements |and |scope |of |prescriptive |work; |use |of |performance-
based |technical |requirements |with |limited |prescriptive |specifications



progressive |design |build |- |ANSWERS✔✔design |and |price |are |progressively |developed |after |the |
design-builder |is |under |contract; |final |project |cost |and |schedule |commitment |is |not |established |as |
part |of |the |selection |process; |two |phases: |preliminary |services |and |final |design |and |construction |
services



criteria |documents |- |ANSWERS✔✔describe |the |end |result



bridging |documents |- |ANSWERS✔✔prescribes |how |to |achieve |the |end |result
$13.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Schoolplug Princeton University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
32
Miembro desde
1 año
Número de seguidores
1
Documentos
1006
Última venta
1 mes hace
EXAMPLUG

Discover high-quality study materials designed to help you succeed! Whether you're looking for comprehensive notes, detailed summaries, practice exams, or insightful guides, my store offers resources across a variety of subjects and levels. Each document is meticulously crafted to simplify complex concepts and enhance your learning experience. Perfect for students who want to excel, my resources are tailored to provide clarity, boost productivity, and prepare you for success. Dive into my store and start your journey toward academic achievement today!

Lee mas Leer menos
4.1

7 reseñas

5
5
4
0
3
1
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes