PLTW CIM Study guide questions and answers verified 2024

Institución
CIM
Grado
CIM










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CIM
Grado
CIM

Información del documento

Subido en
27 de agosto de 2024
Número de páginas
20
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

PLTW CIM Study guide
Closed Loop - correct answer ✔A system that uses feedback from the output
to control the input.


Control System - correct answer ✔A system in which one or more outputs
are forced to change in a desired manner as time progresses.


Decision Block - correct answer ✔The diamond-shaped block used for
YES/NO questions. These blocks have two outputs: 1 (for yes) and 2 (for no).


Flow Chart - correct answer ✔A graphical representation of the progress of a
system for the definition, analysis, or solution of a data-processing or
manufacturing problem.


Flow Lines - correct answer ✔The connecting line or arrow between symbols
on a flow chart.


Input/Output Block - correct answer ✔A function that makes information
available for processing or that records processed information.


Interface - correct answer ✔The connection between the computer and the
control system.


Iterative - correct answer ✔Process flow that may repeat or skip steps until
some condition is satisfied.

,Open Loop - correct answer ✔A control system that has no means for
comparing the output with input for control purposes. An open-loop system
often requires human intervention.


Potentiometer - correct answer ✔A variable resistor.


Process Block - correct answer ✔Part of a flowchart that tells the program
what action to take.


Schematic - correct answer ✔A diagram that uses special symbols in place
of actual pictures. In a wiring schematic, for example, a squiggly line is used
to represent a resistor.


Sequential - correct answer ✔Occurring in regular succession without gaps.


Simulation - correct answer ✔A representation of a situation or problem with
a similar but simpler model or a more easily manipulated model in order to
determine experimental results.


AGV - correct answer ✔Automated Guided Vehicle. A computer-controlled
system that uses pallets and other interface equipment to transport work
pieces to NC machine tools and other equipment in a flexible manufacturing
system.


ASRS - correct answer ✔Automated Storage/Retrieval System. A system
that moves material either vertically or horizontally between a storage
compartment and a transfer station or within a process.


Automation - correct answer ✔The use of technology to ease human labor or
extend the mental or physical capabilities of humans.

, CAD - correct answer ✔Computer Aided Design. The use of computers in
converting the initial idea for a product into a detailed engineering design.


CAM - correct answer ✔Computer Aided Manufacturing. The use of
computers in converting engineering designs into finished products.


CIM - correct answer ✔Computer Integrated Manufacturing. A company-
wide management philosophy for planning, integration, and implementation of
automation.


CNC - correct answer ✔Computer Numerical Control. A numerical control
method in which one computer is linked with one machine tool to perform NC
functions.


Dependent Variable - correct answer ✔A variable whose value depends on
the value of another variable.


FMS - correct answer ✔Flexible Manufacturing System. A flexible group of
CNC machine tools that are highly automated and integrated capable of
producing a family of parts.


Independent Variable - correct answer ✔The controlling factor between
variables, on which the value of the other variable depends.


JIT - correct answer ✔Just in Time. A system that eliminates work-in-process
(WIP) inventory by scheduling arrival of parts and assemblies for an operation
at the time they are needed and not before.
$14.79
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
LEWISSHAWN55 Yale University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
87
Miembro desde
2 año
Número de seguidores
46
Documentos
7240
Última venta
1 mes hace
THE SHOP FOR EXAMS,TESTBANKS,AQA, WHAT YOU STUDY AND WISH TO PASS THEN COME AND CHECK FOR YOUR NEED ......

WANT TO PASS YOUR EXAMS??? IF YES CHECK OUT MY ACCOUNT FOR ALL YOUR EXAMS NEED BE IT NURSING,REALTORS, HUMAN RESOURCE,MATHS,BIOLOGY,WGU,ICT, YOU BETTER CHECK MY ACCOUNT FOR MORE IF YOU GET WHAT U WANT THEN FEEL FREE TO PURCHASE AT A BETTER PRICE........

3.1

10 reseñas

5
5
4
0
3
0
2
1
1
4

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes