On Friday afternoons. - As part of regular system maintenance, when is the BEST time to update device firmware? -On Friday afternoons. -As soon as updates are available. -Device firmware should never be updated after system sign-off. -After coordination with the client, and when the system will be available for an extended period of time Design phase - When working with a client to design an AV solution for a new conference center, the client requests a detailed budget for the equipment and installation. In what phase does this occur? -Design phase -Program phase -Bidding phase -Installation phase Speak with the client about getting more information on how to address the noise source - While surveying a conference room for a system upgrade, an engineer measures 55 dB SPL A-wtd of ambient noise when the room is empty. How should they proceed? -Add voice lift to the system proposal -Add more loudspeakers to the system proposal -Speak with the client about getting more information on how to address the noise source -Do nothing, this level of ambient noise is well within system tolerance Use an RT60 meter - What is the BEST way to determine how reverberant a space is? -Clap your hands and listen for an echo -Ask the client if anyone has complained that the room is too noisy -Use an RT60 meter -Use a DB SPL meter Site survey - The correct time to discuss visible finishes for wall plates, surface mount speakers, and wall mounted screen casings is during the:-Ordering -Installation -Site survey -Contract award Divisible room - A client needs to add videoconferencing functionality for high-level, private meetings. Which of following planned space types should you advise be ruled out? -Divisible room -Boardroom -Conference room -Classroom The Design Phase - Which phase of an AV project comes immediately AFTER the Program Phase? - The Design Phase -Project Planning and Coordination Phase -The Verification Phase -The Documentation Phase Detailed list of equipment - Which is NOT presented in the program report: -Executive Summary - Detailed list of equipment -Budgets -Infrastructure Considerations An overview of the programming process including who was surveyed during the process. - When preparing an executive summary what should be included for submittal to the client? -A deep dive, including full technical specficiation, of all equipment to be used in the design. -An estimation of how many change orders might be required if the client doesn't use your design. -References to new and emerging technologies that should be considered for future spaces. -An overview of the programming process including who was surveyed during the process. Additive color system - Which system is used to show colors from a video display?-Additive color system -Subtractive color system -Plus/minus color system -Recover color system 25 db - An installed audio system should be AT LEAST __________ above the ambient noise floor. -5 dB -25 dB -45 dB -75 dB RS-232 - A device is controlled using the pictured cable. What is the MOST LIKELY method of controlling this device? -IR -RF -RS-232 -Network 5:1 - The minimum load safety rating for mounting audio visual equipment is: -3:1 -5:1 -8:1 -10:1 Black Level - The brightness controls on a display adjusts which level? -Black Level -Chroma Level -Hue -White LevelSpot Photometer - When verifying a display system, which of the following should be used to determine if it meets a specified contrast ratio? -Multi-meter -Histogram -Lux Capacitor -Spot Photometer

Mostrar más Leer menos
Institución
AVIXA CTS
Grado
AVIXA CTS










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
AVIXA CTS
Grado
AVIXA CTS

Información del documento

Subido en
25 de agosto de 2024
Número de páginas
18
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

AVIXA CTS Sample Questions
On Friday afternoons. - As part of regular system maintenance, when is the BEST time to update
device firmware?

-On Friday afternoons.

-As soon as updates are available.

-Device firmware should never be updated after system sign-off.

-After coordination with the client, and when the system will be available for an extended period of time



Design phase - When working with a client to design an AV solution for a new conference center,
the client requests a detailed budget for the equipment and installation. In what phase does this occur?

-Design phase

-Program phase

-Bidding phase

-Installation phase



Speak with the client about getting more information on how to address the noise source - While
surveying a conference room for a system upgrade, an engineer measures 55 dB SPL A-wtd of ambient
noise when the room is empty. How should they proceed? -Add voice lift to the system proposal

-Add more loudspeakers to the system proposal

-Speak with the client about getting more information on how to address the noise source

-Do nothing, this level of ambient noise is well within system tolerance

Use an RT60 meter - What is the BEST way to determine how reverberant a space is?

-Clap your hands and listen for an echo

-Ask the client if anyone has complained that the room is too noisy

-Use an RT60 meter

-Use a DB SPL meter



Site survey - The correct time to discuss visible finishes for wall plates, surface mount speakers,
and wall mounted screen casings is during the:

,-Ordering

-Installation

-Site survey

-Contract award




Divisible room - A client needs to add videoconferencing functionality for high-level, private
meetings. Which of following planned space types should you advise be ruled out?

-Divisible room

-Boardroom

-Conference room -Classroom



The Design Phase - Which phase of an AV project comes immediately AFTER the Program Phase? -
The Design Phase

-Project Planning and Coordination Phase

-The Verification Phase

-The Documentation Phase



Detailed list of equipment - Which is NOT presented in the program report: -Executive Summary -
Detailed list of equipment -Budgets

-Infrastructure Considerations



An overview of the programming process including who was surveyed during the process. - When
preparing an executive summary what should be included for submittal to the client?

-A deep dive, including full technical specficiation, of all equipment to be used in the design.

-An estimation of how many change orders might be required if the client doesn't use your design.

-References to new and emerging technologies that should be considered for future spaces.

-An overview of the programming process including who was surveyed during the process.



Additive color system - Which system is used to show colors from a video display?

, -Additive color system -Subtractive color system -Plus/minus color system -Recover color system



25 db - An installed audio system should be AT LEAST __________ above the ambient noise floor.

-5 dB

-25 dB

-45 dB

-75 dB



RS-232 - A device is controlled using the pictured cable. What is the MOST LIKELY method of
controlling this device?

-IR

-RF

-RS-232

-Network



5:1 - The minimum load safety rating for mounting audio visual equipment is:

-3:1

-5:1

-8:1

-10:1




Black Level - The brightness controls on a display adjusts which level?

-Black Level

-Chroma Level

-Hue

-White Level
$7.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
PatrickKaylian Delaware State University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
1821
Miembro desde
2 año
Número de seguidores
1044
Documentos
22126
Última venta
6 horas hace

3.8

317 reseñas

5
147
4
60
3
54
2
16
1
40

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes