100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

AC 202 FINAL EXAM questions with verified solutions 2024/2025

Puntuación
-
Vendido
-
Páginas
15
Grado
A+
Subido en
15-08-2024
Escrito en
2024/2025

AC 202 FINAL EXAM questions with verified solutions 2024/2025

Institución
MAC 2602
Grado
MAC 2602









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
MAC 2602
Grado
MAC 2602

Información del documento

Subido en
15 de agosto de 2024
Número de páginas
15
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

AC 202 FINAL EXAM

if a per-unit cost remains constant over a wide range of volume, the cost is most likely a -
ANSvariable cost

the cost per unit decreases as volume increases for what cost behavior(s): fixed, variable, mixed
- ANSfixed and mixed costs

in the mixed cost equation what amount represents the total variable cost component - ANSvx
equation: y=vx+f

what method is used to see if a relationship between the cost driver and total cost exists -
ANSscatter plot

what kind of cost is this: as production increases, total cost increases and cost per unit stays the
same - ANSvariable costs

what kind of cost is this: as production increases, total cost remains the same and cost per unit
decreases - ANSfixed costs

what kind of cost is this: as production increases, total cost increases and cost per unit
increases - ANSmixed costs
(as long as both change. this can be an increase or decrease in total and per-unit costs)

when choosing the high point for the high-low method, how is the high point selected? - ANSthe
point with the highest VOLUME is chosen

what is the advantage of using regression analysis to determine the cost equation - ANS- it is
objective
- it will generally be more accurate than the high-low method
- all the data points are used to calculate the cost equations

what is the only difference between variable costing and absorption costing - ANSthe treatment
of fixed manufacturing overhead costs

when inventories decline, operating income under variable costing is........ compared to
absorption costing - ANShigher than operating income under absorption costing

what is the formula for the variable cost (slope) in the high-low method - ANSchange in cost
divided by the change in volume

, if the sales price of a product increases while everything else remains the same, what happens
to the breakeven point? - ANSthe breakeven point will decrease

target profit analysis is used to calculate the sales volume that is needed to - ANSearn a
specific amount of net operating income

a shift in the sales mix from a product with a high contribution margin ratio toward a product with
a low contribution margin ratio will cause the breakeven point to - ANSincrease

if the degree of operating leverage is 3, then a 2% change in the number of units sold should
result in a..... change in - ANS6% change in operating income

margin of safety - ANSthe excess of expected sales over breakeven sales

formula to find the target sales in dollars - ANS(fixed expenses + operating income) /
contribution margin ratio

contribution margin ratio - ANScontribution margin per unit / sales price
OR
contribution margin total / sales revenue

contribution margin per unit - ANSsales price per unit less variable costs per unit

formula to find the target sales in units - ANS(fixed expenses + operating income) / contribution
margin per unit

operating income if you breakeven - ANSzero dollars

variable costs - ANS- the total amount changes in direct proportion to changes in volume
- per unit remains constant

cost graph - ANS- costs are on the vertical axis
- volume is on the horizontal axis

what do the variable cost and fixed costs graphs look like - ANSvariable has a slope (y=x)
fixed is a straight line over the relevant range (y=2)
can be total for all labels (total salaries on the y axis and total sales on the x axis)

cost equation - ANS- y= vx+f
- y= total mixed costs
- mathematical equation for a straight line, to predict total cost

fixed costs - ANS- the total amount stays constant over a relevant range
- the per unit cost varies inversely with changes in volume
$10.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Legitexams Teachme2-tutor
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
55
Miembro desde
1 año
Número de seguidores
1
Documentos
1196
Última venta
1 semana hace

Welcome To my Store My Goal is to help you achieve your desired grades by providing credible study materials I'm happy to help you with quality documents On this page you will find quality study guides, Exams assignments, Research papers and Test Banks all verified correct . you'll find past and recent revised and verified study materials . Stay here and You'll find everything you need to pass !!! . I always ensure my documents are of high standards Be assured to get good grades and always leave a review after a purchase Refer a friend SUCCESS!!!!

Lee mas Leer menos
4.8

14 reseñas

5
12
4
1
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes