100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

DAU STUDY COURSES TEST WITH GUARANTEED ACCURATE ANSWERS |VERIFIED

Puntuación
-
Vendido
-
Páginas
19
Grado
A+
Subido en
14-08-2024
Escrito en
2024/2025

To ensure that contractors fully understand what they will be required to do if awarded a contract, contracting officers insert language primarily into which of the following sections of the Uniform Contract Format - ACCURATE ANSWERH The program protection plan focuses on protecting technology, whereas an OPSEC plan focuses on protecting critical information about an organization and its operations - ACCURATE ANSWERTrue Which of the following is NOT among the five primary steps of the OPSEC process - ACCURATE ANSWERApply Complex Countermeasures The responsibility to determine whether or not OPSEC requirements should be incorporated into a correct rest primarily with which one of the following - ACCURATE ANSWERProgram manager Critical information typically relates to specific facts about technologies or systems which if companies would directly affect mission accomplishment, while critical program information deals -primarily with personnel-related datea - ACCURATE ANSWERFALSE Which one of the following documents requires that heads of DoD components implement and maintain OPSEC programs - ACCURATE ANSWER5205.02 A bid is recieved in your contracting office one week prior to the bid opening date. What is the proper procedure for handling and safeguarding the bid - ACCURATE ANSWERPlace it in a locked container with any other bids submitted in response to in IFB Which of the following would be considered an issue pertaining to the bidder being non-responsive to the IFB? - ACCURATE ANSWERThe IFB does not address facsimile bids You have a requirement for highly sensitive components that fits into a missile launching system. The component is critical to the system in that it is required to detonate the launcher. The current component is obsolete and is no longer manufactured. You conduct market research and discover that there are several manufactures that can design and manufacture the replacement. You want to see FAR part 14 sealed bidding procedures but believe there is a need to verify the manufacture's technical capability. what method of bidding should be used - ACCURATE ANSWERTwo-Step sealed bidding, with the opportunity of discussion in step 1 Of the following choices, which is the most common cause for rejecting an individual bid? - ACCURATE ANSWERThe bid is non-responsive to the IFB

Mostrar más Leer menos
Institución
DAU
Grado
DAU










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
DAU
Grado
DAU

Información del documento

Subido en
14 de agosto de 2024
Número de páginas
19
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

DAU STUDY COURSES TEST
DAU STUDY COURSES TEST WITH GUARANTEED ACCURATE ANSWERS |VERIFIED




To ensure that contractors fully understand what they will be required to do if
awarded a contract, contracting officers insert language primarily into which of the
following sections of the Uniform Contract Format - ACCURATE
ANSWER✅✅H


The program protection plan focuses on protecting technology, whereas an OPSEC
plan focuses on protecting critical information about an organization and its
operations - ACCURATE ANSWER✅✅True


Which of the following is NOT among the five primary steps of the OPSEC
process - ACCURATE ANSWER✅✅Apply Complex Countermeasures


The responsibility to determine whether or not OPSEC requirements should be
incorporated into a correct rest primarily with which one of the following -
ACCURATE ANSWER✅✅Program manager

,Critical information typically relates to specific facts about technologies or systems
which if companies would directly affect mission accomplishment, while critical
program information deals -primarily with personnel-related datea - ACCURATE
ANSWER✅✅FALSE


Which one of the following documents requires that heads of DoD components
implement and maintain OPSEC programs - ACCURATE ANSWER✅✅5205.02


A bid is recieved in your contracting office one week prior to the bid opening date.
What is the proper procedure for handling and safeguarding the bid - ACCURATE
ANSWER✅✅Place it in a locked container with any other bids submitted in
response to in IFB


Which of the following would be considered an issue pertaining to the bidder being
non-responsive to the IFB? - ACCURATE ANSWER✅✅The IFB does not
address facsimile bids


You have a requirement for highly sensitive components that fits into a missile
launching system. The component is critical to the system in that it is required to
detonate the launcher. The current component is obsolete and is no longer
manufactured. You conduct market research and discover that there are several
manufactures that can design and manufacture the replacement. You want to see
FAR part 14 sealed bidding procedures but believe there is a need to verify the
manufacture's technical capability. what method of bidding should be used -
ACCURATE ANSWER✅✅Two-Step sealed bidding, with the opportunity of
discussion in step 1


Of the following choices, which is the most common cause for rejecting an
individual bid? - ACCURATE ANSWER✅✅The bid is non-responsive to the
IFB

, When selecting a contractor for award using sealed bidding procedures, which one
of the following statements is most accurate? - ACCURATE
ANSWER✅✅Contract award shall be made to the responsible bidder whose bid
is most advantageous to the government, considering price, past performance, and
responsibility factors


This morning at 6:00 am a severe storm struck the local area causing flood and
power outages. With this scenario what is your decision regarding receipt of this
bid? - ACCURATE ANSWER✅✅7 days


Which f the following methods can NOT be authorized for receipt of bids? -
ACCURATE ANSWER✅✅Bids received by telephone, followed by a
telegraphic message received within 7 days after bid opening


When would it be appropriate to require bid samples? - ACCURATE
ANSWER✅✅when clear description of the sample, i.e. color, pattern, or other
characteristics cannot be described adequately in the specifications or purchase
description


who normally is responsible for certifying the accuracy of the completed abstract
of offers? - ACCURATE ANSWER✅✅Bid opening officer


FAR 6.401(a) states you MAY solicit sealed bids when the four conditions listed
there in are met - ACCURATE ANSWER✅✅TRUE


Which of the following is a correct statement regarding the information that the
contracting officer shall document in the contract file - ACCURATE
ANSWER✅✅The contracting officer shall document the fire describing how a
tie was broken after receipt of equal low bids
$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
GRADEUNITS Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
178
Miembro desde
2 año
Número de seguidores
94
Documentos
5971
Última venta
1 mes hace
GET ALL STUDYMATERIALS,...AQA,TESTBANKS,NURSING AND LATEST EXAMS

I know you have been searching for a study partner to take you through the journey of Education, Well worry no more am here for you, am also looking forward to help you get your career sorted

3.6

32 reseñas

5
13
4
5
3
7
2
1
1
6

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes