100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

CMIT CERTIFICATION EXAM ACTUAL EXAM COMPLETE 200 QUESTIONS WITH DETAILED CORRECT ANSWERS | LATEST VERSION

Puntuación
-
Vendido
-
Páginas
41
Grado
A+
Subido en
14-08-2024
Escrito en
2024/2025

CMIT CERTIFICATION EXAM ACTUAL EXAM COMPLETE 200 QUESTIONS WITH DETAILED CORRECT ANSWERS | LATEST VERSION

Institución
CMIT CERTIFICATION
Grado
CMIT CERTIFICATION











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
CMIT CERTIFICATION
Grado
CMIT CERTIFICATION

Información del documento

Subido en
14 de agosto de 2024
Número de páginas
41
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CMIT CERTIFICATION EXAM 2024 - 2025
ACTUAL EXAM COMPLETE 200
QUESTIONS WITH DETAILED
CORRECT ANSWERS | LATEST VERSION

The use of a BIM model on a project can lead to faster
construction as a result of which of the following factors?
a. Increased prefabrication
b. Increased changes
c. Reduced claims
d. Reduced design Correct Answer Answer: Increased
prefabrication

The standard of care to which a CM is likely to be held is:
a. That of a licensed architect performing construction
administration services
b. That of a licensed contractor managing sub-contractors
on a similar project
c. That of how other professionals in the industry generally
perform
d. That of a general contractor working on a similarly
priced project Correct Answer Answer: That of how other
professionals in the industry generally perform.

Actual usage of a particular contract form for the
construction phase depends on:
a) The particular delivery system being used.

,b) The type of project being implemented and the
completion status of the plans and specifications at the
time of contracting.
c) The consideration of any performance requirements,
the level of sophistication of the owner, and the role of the
architect/engineers involved.
d) All of the above Correct Answer Answer: All of the
above

The possible approaches for delivering a project are
virtually unlimited. A key reason for such variation is
a. The different roles that can be assumed by projects
participants.
b. Different forms of contracts and methods of
compensation that can be used.
c. The different levels of care, responsibility, and risks
assumed by the parties involved.
d. All the above. Correct Answer Answer: d) All the above

The traditional delivery system is characterized by
executing the major phases of a project in:
a. An overlapping concept
b. A linear sequence
c. A fast track method
d. All of the above Correct Answer Answer: A linear
sequence

A key advantage of the traditional delivery approach is:
a. With the traditional delivery system, the cost of the
construction phase is known before constructions starts.
b. Facility features are fully determined & specified

,c. When the construction contract is signed, the major risk
belongs to the contractor.
d. All of the above. Correct Answer Answer: Facility
features are fully determined & specified

What regulations define and differentiate public and
private sector contracting?
a. OSHA
b. CMAA Standard Contract Form A-1
c. FAR
d. ADR Correct Answer Answer: FAR

What is a principal differentiator between public and
private sector contracting?
a. Advantage in contract language
b. Innovative designs
c. Sustainability goals
d. All of the above. Correct Answer Answer: Advantage in
contract language

Which of the following methods of compensation for CM
services is inconsistent with the CM's agency relationship
to its owner?
a. Fixed fee
b. Percentage of construction costs
c. Multiple of direct personnel expenses
d. Professional fee plus expense Correct Answer Answer:
Multiple of direct personnel expenses

, In cases where a project is extended in duration for
reasons beyond the control of the CM, it is imperative that
the CM agreement address:
a. How changes in scope and additional services will be
handled
b. Extended CM services
c. The cost of additional services
d. All of the above. Correct Answer Answer: All of the
above.

The most common basis of CM liability to a trade
contractor with whom the CM has no contractual
relationship is negligent performance of the CM's
a. Cost estimating
b. Inspection of work
c. Project coordination and scheduling
d. All of the above Correct Answer Answer: Project
coordination and scheduling

Most publicly funded projects require which of the
following inclusions as part of their contract obligations?
a. Performance bond
b. BIM Model
c. Mock-up model
d. LEED Gold Correct Answer Answer: Performance Bond

A Public-Private Partnership (P3) project is usually
considered by a public entity for which of the following
primary reasons:
a. Better design
b. Incorporate environmental requirements
$23.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
TUTORWAC Johns Hopkins University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
334
Miembro desde
2 año
Número de seguidores
114
Documentos
3529
Última venta
4 horas hace
TUTORWAC

BEST HOMEWORK HELP AND TUTORING ON YOUR QUIZZES AND EXAMS WITH GUARANTEE OF EXCELLENT GRADES

4.1

52 reseñas

5
31
4
8
3
6
2
3
1
4

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes