100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

INTERCONNECTION RELIABILITY OPERATIONS AND COORDINATION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED ANSWERS ALREADY GRADED A+ GUARANTEED PASS

Puntuación
-
Vendido
-
Páginas
14
Grado
A+
Subido en
11-08-2024
Escrito en
2024/2025

INTERCONNECTION RELIABILITY OPERATIONS AND COORDINATION EXAMS WITH ACTUAL CORRECT QUESTIONS AND VERIFIED DETAILED ANSWERS ALREADY GRADED A+ GUARANTEED PASS

Institución
INTERCONNECTION
Grado
INTERCONNECTION









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
INTERCONNECTION
Grado
INTERCONNECTION

Información del documento

Subido en
11 de agosto de 2024
Número de páginas
14
Escrito en
2024/2025
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

INTERCONNECTION RELIABILITY
OPERATIONS AND COORDINATION
EXAMS WITH ACTUAL CORRECT
QUESTIONS AND VERIFIED
DETAILED ANSWERS ALREADY
GRADED A+ GUARANTEED PASS



The RC shall know the current status of all _______ in their whose failure, degradation or disconnection
could result in a system operating limit or an interconnection reliability operating limit violation

Since events in one part of the system can influence operations in all other parts of the system, the RC is
required to monitor and determine any potential SOL and IROL violations

True

Once a Reliability Coordinator issues a directive to preserve the integrity and reliability of the Bulk
Electric System, actions shall be taken without delay, but no longer than ________.

30 minutes

Reliability Coordinator shall initiate control actions or emergency procedures to relieve the violation
without delay and no longer than ___________.

30 minutes

___________ have the duty to continuously assess transmission reliability and coordinate emergency
operations among the operating entities within the region and across the regional boundaries.

Reliability Coordinators

, A portion of a Reliability Coordinator Area is experiencing low voltage, what directives should the
Reliability Coordinator give?

Lower transfers across area and increase generation in area with low voltage

Low voltage is a result of reactive power and losses associated with transferring power to load areas.
Increasing generation in the area with low voltage reduces losses associated with transferring power.

At any time, regardless of prior planned or unplanned events, the Reliability Coordinator should be able
to determine any potential ______________ violations within its Reliability Coordinator Area.

System Operating Limits (SOL) & Interconnection Reliability Operating Limits (IROL)

The _______ as defined by NERC is the electrical generation resources, transmission lines,
interconnections with neighboring systems, and associated equipment, generally operated at voltages
of 100 kilovolts or higher.

Bulk Electric System

Each Reliability Coordinator shall have adequate analysis tools, such as state estimation, contingency
analysis capabilities and ________ to monitor the Bulk Electric System.

wide-area overview displays

Wide-Area view is required therefore, each Reliability Coordinator shall have adequate analysis tools;
such as, state estimation, pre- and post-contingency analysis capabilities (thermal, stability, and
voltage), and wide-area overview displays.

This is stated in the NERC Standard IRO-002 explicitly and applied in the NERC Standard IRO-003 as the
RC shall monitor a wide area view within its Reliability Coordinator Area and that of neighboring
Reliability Coordinators.

Reliability Coordinators that delegate tasks to other entities shall have formal operating _________ with
each entity to which tasks are delegated.

agreements

If Reliability Coordinator tasks are delegated to other entities, the Reliability Coordinator shall verify that
these tasks are carried out by ___________ operating personnel.

NERC certified

Reliability Coordinators shall have clear, comprehensive coordination agreements with adjacent
Reliability Coordinators to ensure that System Operating Limit or Interconnection Reliability Operating
Limit violation mitigation requiring actions in adjacent Reliability Coordinator Areas are __________.

coordinated

Once a Reliability Coordinator issues a directive to preserve the integrity and reliability of the Bulk
Electric System, actions shall be taken without delay, but no longer than ________.
$15.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
drjulie
1.0
(1)

Conoce al vendedor

Seller avatar
drjulie john hopkins university
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
8
Miembro desde
1 año
Número de seguidores
2
Documentos
593
Última venta
1 año hace
perfect grades

Quality over Quantity : i am strong believer in quality and reliable educational journey and therefore offer high -quality study docs ,comprehensive resources in variours subjects .meticulously curated ,accurate ,clear, and affordable .update reguarly. Download for excellence .Good luck and all the best .You got this DO NOT HESISTATE TO CONTACT FOR HELP . I WILL BE MORE THAN GLAD TO HELP

1.0

1 reseñas

5
0
4
0
3
0
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes